BD Bašak 15 (Q75838): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The purpose of the project is the home in the northern part of the Prague-East District, in the municipality of Běraa, number 15, on parcel No. 25/2, LV 441. The project will cover the upgrading and insulation of the building envelope. It is ready for energy reduction according to the IROP requirements at the level of 40 % of the savings. The aim of the project is to reduce the cost of heating the population of a building in convergence with t...)
(‎Created claim: summary (P836): The object of the project is a house in the northern part of the district Prague-East, in the village of Bášť, no. 15, on plot p. no. st. 25/2, LV 441. The project solves the replacement of remaining fillings and insulation of the building envelope. It is prepared for energy reduction according to IROP requirements of 40 % savings. The aim of the project is to reduce heating costs for residents of the house in convergence with the effect of redu...)
Property / summary
 
The object of the project is a house in the northern part of the district Prague-East, in the village of Bášť, no. 15, on plot p. no. st. 25/2, LV 441. The project solves the replacement of remaining fillings and insulation of the building envelope. It is prepared for energy reduction according to IROP requirements of 40 % savings. The aim of the project is to reduce heating costs for residents of the house in convergence with the effect of reducing emissions in the Czech Republic. (English)
Property / summary: The object of the project is a house in the northern part of the district Prague-East, in the village of Bášť, no. 15, on plot p. no. st. 25/2, LV 441. The project solves the replacement of remaining fillings and insulation of the building envelope. It is prepared for energy reduction according to IROP requirements of 40 % savings. The aim of the project is to reduce heating costs for residents of the house in convergence with the effect of reducing emissions in the Czech Republic. (English) / rank
 
Normal rank
Property / summary: The object of the project is a house in the northern part of the district Prague-East, in the village of Bášť, no. 15, on plot p. no. st. 25/2, LV 441. The project solves the replacement of remaining fillings and insulation of the building envelope. It is prepared for energy reduction according to IROP requirements of 40 % savings. The aim of the project is to reduce heating costs for residents of the house in convergence with the effect of reducing emissions in the Czech Republic. (English) / qualifier
 
point in time: 23 October 2020
Timestamp+2020-10-23T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 21:48, 23 October 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
BD Bašak 15
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    657,200.0 Czech koruna
    0 references
    26,288.0 Euro
    10 January 2020
    0 references
    1,643,000.0 Czech koruna
    0 references
    65,720.0 Euro
    10 January 2020
    0 references
    40 percent
    0 references
    31 March 2017
    0 references
    1 December 2018
    0 references
    1 December 2018
    0 references
    Společenství vlastníků jednotek Bášť 15
    0 references
    0 references

    50°11'17.9"N, 14°29'20.8"E
    0 references
    25065
    0 references
    Předmětem projektu je dům v severní části okresu Praha-východ, v obci Bášť, číslo popisné 15, na pozemku p. č. st. 25/2, LV 441. Projekt Řeší výměnu zbývajících výplní a zateplení obálky budovy. Je připraven pro snížení energií podle požadavků IROP ve výši 40 % úspory. Cílem projektu je snížit výdaje za vytápění obyvatel domu v konvergenci s účinkem snížení emisí v ČR. (Czech)
    0 references
    The object of the project is a house in the northern part of the district Prague-East, in the village of Bášť, no. 15, on plot p. no. st. 25/2, LV 441. The project solves the replacement of remaining fillings and insulation of the building envelope. It is prepared for energy reduction according to IROP requirements of 40 % savings. The aim of the project is to reduce heating costs for residents of the house in convergence with the effect of reducing emissions in the Czech Republic. (English)
    23 October 2020
    0 references

    Identifiers

    CZ.06.2.11/0.0/0.0/16_098/0005724
    0 references