D3 motorway, construction 0309/III Borek — Effective (2nd stage) _1 (Q72438): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Fixing rounding issue)
(‎Removed claim: summary (P836): The project involves the construction of a D3 motorway of category D 27,5/120 on section 0309/III Borek — A total of 3.160 km in total run on an entirely new route, including the building of a one-step junction of ÚStrong. The implementation of the construction works mainly to significantly reduce the traffic burden on the existing road I/3 in Borek and the connecting section of the town of České Budějovice. This will lead to a reduction of no...)
Property / summary
The project involves the construction of a D3 motorway of category D 27,5/120 on section 0309/III Borek — A total of 3.160 km in total run on an entirely new route, including the building of a one-step junction of ÚStrong. The implementation of the construction works mainly to significantly reduce the traffic burden on the existing road I/3 in Borek and the connecting section of the town of České Budějovice. This will lead to a reduction of noise and noise pollution from car transport, increased traffic fluidity and a reduction in traffic accidents. (English)
 
Property / summary: The project involves the construction of a D3 motorway of category D 27,5/120 on section 0309/III Borek — A total of 3.160 km in total run on an entirely new route, including the building of a one-step junction of ÚStrong. The implementation of the construction works mainly to significantly reduce the traffic burden on the existing road I/3 in Borek and the connecting section of the town of České Budějovice. This will lead to a reduction of noise and noise pollution from car transport, increased traffic fluidity and a reduction in traffic accidents. (English) / rank
Normal rank
 

Revision as of 21:44, 23 October 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
D3 motorway, construction 0309/III Borek — Effective (2nd stage) _1
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    0 references
    666,456,111.05 Czech koruna
    0 references
    26,658,244.44 Euro
    10 January 2020
    0 references
    846,540,718.0 Czech koruna
    0 references
    33,861,628.72 Euro
    10 January 2020
    0 references
    78.73 percent
    0 references
    1 January 2016
    0 references
    29 May 2018
    0 references
    29 May 2018
    0 references
    Ředitelství silnic a dálnic ČR
    0 references
    0 references

    50°2'57.91"N, 14°26'32.86"E
    0 references
    14000
    0 references
    Předmětem projektu je výstavba dálnice D3 kategorie D 27,5/120 v úseku 0309/III Borek - Úsilné o celkové délce 3,160 km vedené ve zcela nové trase, včetně dostavby mimoúrovňové křižovatky Úsilné. Realizací stavby dojde především k výraznému snížení dopravní zátěže na stávající silnici I/3 v obci Borek a na ní navazující části města České Budějovice. To povede ke snížení zátěže obyvatelstva hlukem a exhalacemi z automobilové dopravy, zvýšení plynulosti dopravy a snížení počtu dopravních nehod. (Czech)
    0 references

    Identifiers

    CZ.04.2.39/0.0/0.0/16_007/0000027
    0 references