D3 motorway, construction 0309/II Ševetín — Borek_1 (Q72376): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The purpose of the project is the construction of the D3 motorway in 0309/II Ševetín — Borek. This is the extension of the existing road I/3, which was already constructed as a half of the profile of the motorway, to a 10.680 km motorway profile of category D 27,5/120. The construction of the D3 motorway will improve substantially the flow of traffic and increase operational security. From an environmental point of view, there will be a reduct...)
(‎Created claim: summary (P836): The project is the construction of the D3 motorway in section 0309/II Ševětín – Borek. It is an extension of the existing road I/3, which has already been built as a half-profile motorway, to the motorway profile of category D 27,5/120 10.680 km long. The construction of the D3 motorway will significantly improve traffic flow and increase traffic safety. From an environmental point of view, continuous operation will reduce total traffic emission...)
Property / summary
 
The project is the construction of the D3 motorway in section 0309/II Ševětín – Borek. It is an extension of the existing road I/3, which has already been built as a half-profile motorway, to the motorway profile of category D 27,5/120 10.680 km long. The construction of the D3 motorway will significantly improve traffic flow and increase traffic safety. From an environmental point of view, continuous operation will reduce total traffic emissions in the vicinity of the existing road. (English)
Property / summary: The project is the construction of the D3 motorway in section 0309/II Ševětín – Borek. It is an extension of the existing road I/3, which has already been built as a half-profile motorway, to the motorway profile of category D 27,5/120 10.680 km long. The construction of the D3 motorway will significantly improve traffic flow and increase traffic safety. From an environmental point of view, continuous operation will reduce total traffic emissions in the vicinity of the existing road. (English) / rank
 
Normal rank
Property / summary: The project is the construction of the D3 motorway in section 0309/II Ševětín – Borek. It is an extension of the existing road I/3, which has already been built as a half-profile motorway, to the motorway profile of category D 27,5/120 10.680 km long. The construction of the D3 motorway will significantly improve traffic flow and increase traffic safety. From an environmental point of view, continuous operation will reduce total traffic emissions in the vicinity of the existing road. (English) / qualifier
 
point in time: 23 October 2020
Timestamp+2020-10-23T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 21:43, 23 October 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
D3 motorway, construction 0309/II Ševetín — Borek_1
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    0 references
    907,441,408.54 Czech koruna
    0 references
    36,297,656.34 Euro
    10 January 2020
    0 references
    1,525,111,611.0 Czech koruna
    0 references
    61,004,464.44 Euro
    10 January 2020
    0 references
    59.5 percent
    0 references
    13 December 2016
    0 references
    18 August 2021
    0 references
    Ředitelství silnic a dálnic ČR
    0 references
    0 references

    50°2'57.91"N, 14°26'32.86"E
    0 references
    14000
    0 references
    Předmětem projektu je výstavba dálnice D3 v úseku 0309/II Ševětín - Borek. Jedná se o rozšíření stávající silnice I/3, která již byla vybudována jako poloviční profil dálnice, na dálniční profil kategorie D 27,5/120 v délce 10,680 km. Realizací výstavby dálnice D3 dojde k podstatnému zlepšení plynulosti dopravy a zvýšení bezpečnosti provozu. Z hlediska životního prostředí, plynulým provozem dojde ke snížení celkových emisí z dopravy v okolí stávající komunikace. (Czech)
    0 references
    The project is the construction of the D3 motorway in section 0309/II Ševětín – Borek. It is an extension of the existing road I/3, which has already been built as a half-profile motorway, to the motorway profile of category D 27,5/120 10.680 km long. The construction of the D3 motorway will significantly improve traffic flow and increase traffic safety. From an environmental point of view, continuous operation will reduce total traffic emissions in the vicinity of the existing road. (English)
    23 October 2020
    0 references

    Identifiers

    CZ.04.2.39/0.0/0.0/15_002/0000084
    0 references