Q74024 (Q74024): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): As part of the project, the perimeter walls of the school building will be insulated, the flat roofs are insulated (a new lightning rod is designed), the exchange of old wooden windows and the entrance doors of the building. Remediation of the perimeter masonry in connection with the occurrence of humidity will be dealt with in the building of the dressing rooms.Realisation of the project is expected to save the total annual energy consumption o...)
(‎Changed label, description and/or aliases in 1 language: remove_english_label)
label / enlabel / en
5.1a Reduction of the energy performance of buildings of the Trade Academy in Cologne

Revision as of 21:25, 23 October 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
No label defined
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    4,277,163.8 Czech koruna
    0 references
    171,086.55 Euro
    10 January 2020
    0 references
    12,220,468.0 Czech koruna
    0 references
    488,818.72 Euro
    10 January 2020
    0 references
    35 percent
    0 references
    31 December 2020
    0 references
    Obchodní akademie, Kolín IV, Kutnohorská 41
    0 references
    0 references

    50°1'58.19"N, 15°11'23.86"E
    0 references
    28002
    0 references
    V rámci projektu dojde k zateplení obvodových stěn objektu školy, zateplení plochých střech (nadotčených střechách je navržen nový hromosvod), výměně starých dřevěných oken a vchodových dvěříze dvora objektu. V objektu šaten bude řešena sanace obvodového zdiva v souvislosti s výskytemvlhkosti.Realizací projektu se předpokládá úspora celkové roční spotřeby energie ve výši 502,3 GJ/rok, cožodpovídá 139,5 MWh/rok.Návaznost na 5.1b Snížení energetické náročnosti budov Obchodní akademie Kolín. (Czech)
    0 references
    As part of the project, the perimeter walls of the school building will be insulated, the flat roofs are insulated (a new lightning rod is designed), the exchange of old wooden windows and the entrance doors of the building. Remediation of the perimeter masonry in connection with the occurrence of humidity will be dealt with in the building of the dressing rooms.Realisation of the project is expected to save the total annual energy consumption of 502.3 GJ/year, which corresponds to 139.5 MWh/year. (English)
    23 October 2020
    0 references

    Identifiers

    CZ.05.5.18/0.0/0.0/18_100/0009464
    0 references