Q72115 (Q72115): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): The project includes reconstruction of the bridge on km 232,992 on the national, double-track line Chomutov – Cheb falling into the child TEN-T – Comprehensive Network. The implementation of the project will remove the poor construction-technical condition of the bridge, which reduces the line speed and at the same time reconstructs part of the adjacent line., translated_summary)
(‎Changed label, description and/or aliases in 1 language: remove_english_label)
label / enlabel / en
Reconstruction of the bridge in km 232,992 of the Chomutov — Cheb_1 line

Revision as of 21:16, 23 October 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
No label defined
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    0 references
    0 references
    81,427,703.3 Czech koruna
    0 references
    3,257,108.13 Euro
    10 January 2020
    0 references
    102,753,725.0 Czech koruna
    0 references
    4,110,149.0 Euro
    10 January 2020
    0 references
    79.25 percent
    0 references
    12 January 2016
    0 references
    12 October 2016
    0 references
    12 October 2016
    0 references
    Správa železniční dopravní cesty, státní organizace
    0 references
    0 references

    50°5'20.22"N, 14°25'13.04"E
    0 references

    50°5'7.01"N, 14°25'23.81"E
    0 references
    11000
    0 references
    Obsahem projektu je rekonstrukce mostu v km 232,992 na celostátní, dvoukolejné trati Chomutov - Cheb spadající do dítě TEN-T - Comprehensive Network. Realizací projektu dojde k odstranění špatného stavebně-technického stavu mostu, který snižuje traťovou rychlost, a současně k rekonstrukci části přilehlé trati. (Czech)
    0 references
    The project includes reconstruction of the bridge on km 232,992 on the national, double-track line Chomutov – Cheb falling into the child TEN-T – Comprehensive Network. The implementation of the project will remove the poor construction-technical condition of the bridge, which reduces the line speed and at the same time reconstructs part of the adjacent line. (English)
    23 October 2020
    0 references

    Identifiers

    CZ.04.1.41/0.0/0.0/15_001/0000011
    0 references