5.1a Reducing the energy performance of the boarding house and gymnasium SOU Hubálov (Q73474): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in 1 language: remove_english_label)
(‎Changed label, description and/or aliases in 1 language: translated_label)
label / enlabel / en
 
5.1a Reducing the energy performance of the boarding house and gymnasium SOU Hubálov

Revision as of 21:12, 23 October 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
5.1a Reducing the energy performance of the boarding house and gymnasium SOU Hubálov
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    5,977,148.0 Czech koruna
    0 references
    239,085.92 Euro
    10 January 2020
    0 references
    11,954,296.0 Czech koruna
    0 references
    478,171.84 Euro
    10 January 2020
    0 references
    50 percent
    0 references
    21 December 2018
    0 references
    Střední odborné učiliště, Hubálov 17
    0 references
    0 references
    0 references

    50°33'28.98"N, 15°2'24.29"E
    0 references
    29411
    0 references
    Projekt je zaměřen na snížení energetické náročnosti budovy internátu a tělocvičny SOU Hubálov, která má č. p. 10 s par. č. st. 128/3 v k. ú. Loukovec [687278]. Stávající konstrukce budovy nevyhovují současným požadavkům na jejich tepelně technické vlastnosti. V rámci projektu dojde k zateplení obálky budovy, výměně otvorových výplní a zateplení střechy a fasády, zároveň bude instalována nová vzduchotechnika s rekuperací, která bude řešena v související žádosti 5.1b (Czech)
    0 references
    The project is aimed at reducing the energy performance of the building of the boarding house and gymnasium SOU Hubálov, which has no. p. 10 with par. st. 128/3 in k. ú. Loukovec [687278]. The existing construction of the building does not meet the current requirements for their thermally technical characteristics. The project will include insulation of the building envelope, replacement of hole fillings and insulation of the roof and façade, at the same time new air conditioning with recuperation will be installed, which will be dealt with in the related application 5.1b (English)
    23 October 2020
    0 references

    Identifiers

    CZ.05.5.18/0.0/0.0/17_070/0006656
    0 references