5.1.A. Reduction of the energy performance of the nursery building in Rokytnica nad Jizerou (Q74014): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The purpose of the project is the insulation of the peripheral walls, the replacement of part of the assembly, the insulation of the soil ceiling, the replacement of the lighting system and the upgrading of the central boiler room. Place of execution: Lower Year 172, 512 44 Rokytnice nad Jizerara, st. 496, ku: Lower Rokytnice, remove_old_english_translation)
(‎Created claim: summary (P836): The object of the project is to insulate perimeter walls, replace parts of fillings, insulation of the ceiling of the soil, exchange of lighting system and modernisation of the central boiler room. Place of realisation: Dolní Rokytnice 172, 512 44 Rokytnice nad Jizerou, st. 496, ku: Lower Rokytnice, translated_summary)
Property / summary
 
The object of the project is to insulate perimeter walls, replace parts of fillings, insulation of the ceiling of the soil, exchange of lighting system and modernisation of the central boiler room. Place of realisation: Dolní Rokytnice 172, 512 44 Rokytnice nad Jizerou, st. 496, ku: Lower Rokytnice (English)
Property / summary: The object of the project is to insulate perimeter walls, replace parts of fillings, insulation of the ceiling of the soil, exchange of lighting system and modernisation of the central boiler room. Place of realisation: Dolní Rokytnice 172, 512 44 Rokytnice nad Jizerou, st. 496, ku: Lower Rokytnice (English) / rank
 
Normal rank
Property / summary: The object of the project is to insulate perimeter walls, replace parts of fillings, insulation of the ceiling of the soil, exchange of lighting system and modernisation of the central boiler room. Place of realisation: Dolní Rokytnice 172, 512 44 Rokytnice nad Jizerou, st. 496, ku: Lower Rokytnice (English) / qualifier
 
point in time: 23 October 2020
Timestamp+2020-10-23T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 21:03, 23 October 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
5.1.A. Reduction of the energy performance of the nursery building in Rokytnica nad Jizerou
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    4,880,338.0 Czech koruna
    0 references
    195,213.52 Euro
    10 January 2020
    0 references
    12,200,845.0 Czech koruna
    0 references
    488,033.8 Euro
    10 January 2020
    0 references
    40 percent
    0 references
    31 December 2020
    0 references
    Město Rokytnice nad Jizerou
    0 references
    0 references
    0 references

    50°43'44.83"N, 15°26'34.26"E
    0 references
    51244
    0 references
    Předmětem projektu je zateplení obvodových stěn, výměna části výplní, zateplení stropu půdy, výměna osvětlovací soustavy a modernizace centrální kotelny. Místo realizace: Dolní Rokytnice 172, 512 44 Rokytnice nad Jizerou, st. 496, ku: Dolní Rokytnice (Czech)
    0 references
    The object of the project is to insulate perimeter walls, replace parts of fillings, insulation of the ceiling of the soil, exchange of lighting system and modernisation of the central boiler room. Place of realisation: Dolní Rokytnice 172, 512 44 Rokytnice nad Jizerou, st. 496, ku: Lower Rokytnice (English)
    23 October 2020
    0 references

    Identifiers

    CZ.05.5.18/0.0/0.0/18_100/0009451
    0 references