Extension of the trolley-bus line to the Act Zámečk_1 (Q72047): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The project involves the construction of a new two-wheel trolley-bus line of 0.9 km from the current final stop of Pardubik, fifth wheel, to a new final stop of the trolley-bus line (the current final bus of some bus lines No. 12). In addition to the contact contact line itself, the project will also include adjustments (capacity building) at the call centre and the establishment of a social background (including the necessary engineering conn...)
(‎Created claim: summary (P836): The project includes the construction of a new two-track trolleybus line with a length of 0.9 km from the existing end stop Pardubička, turntable, to the new stop of the trolleybus line Zámeček (existing final stop of some bus connections no. 12). In addition to the catenary overhead contact line itself, the project will also include adjustments (capacity) of the turnover at the stop Zámeček and the establishment of social facilities (including...)
Property / summary
 
The project includes the construction of a new two-track trolleybus line with a length of 0.9 km from the existing end stop Pardubička, turntable, to the new stop of the trolleybus line Zámeček (existing final stop of some bus connections no. 12). In addition to the catenary overhead contact line itself, the project will also include adjustments (capacity) of the turnover at the stop Zámeček and the establishment of social facilities (including the necessary connections of civil engineering networks) at this final stop. (English)
Property / summary: The project includes the construction of a new two-track trolleybus line with a length of 0.9 km from the existing end stop Pardubička, turntable, to the new stop of the trolleybus line Zámeček (existing final stop of some bus connections no. 12). In addition to the catenary overhead contact line itself, the project will also include adjustments (capacity) of the turnover at the stop Zámeček and the establishment of social facilities (including the necessary connections of civil engineering networks) at this final stop. (English) / rank
 
Normal rank
Property / summary: The project includes the construction of a new two-track trolleybus line with a length of 0.9 km from the existing end stop Pardubička, turntable, to the new stop of the trolleybus line Zámeček (existing final stop of some bus connections no. 12). In addition to the catenary overhead contact line itself, the project will also include adjustments (capacity) of the turnover at the stop Zámeček and the establishment of social facilities (including the necessary connections of civil engineering networks) at this final stop. (English) / qualifier
 
point in time: 23 October 2020
Timestamp+2020-10-23T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 20:58, 23 October 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Extension of the trolley-bus line to the Act Zámečk_1
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    10,855,753.86 Czech koruna
    0 references
    434,230.15 Euro
    10 January 2020
    0 references
    12,771,475.13 Czech koruna
    0 references
    510,859.01 Euro
    10 January 2020
    0 references
    85.0 percent
    0 references
    11 July 2017
    0 references
    4 March 2018
    0 references
    31 December 2017
    0 references
    Dopravní podnik města Pardubic a.s.
    0 references
    0 references

    50°1'3.04"N, 15°47'4.88"E
    0 references
    53002
    0 references
    Projekt zahrnuje výstavbu nové dvoustopé trolejbusové trati o délce 0,9 km ze stávající konečné zastávky Pardubičky, točna, na novou konečnou zastávku trolejbusové linky Zámeček (stávající konečná zastávka některých spojů autobusové linky č. 12). Kromě samotného trakčního trolejového vedení budou součástí projektu též úpravy (zkapacitnění) obratiště na zastávce Zámeček a zřízení sociálního zázemí (včetně potřebných přípojek inženýrských sítí) při této konečné zastávce. (Czech)
    0 references
    The project includes the construction of a new two-track trolleybus line with a length of 0.9 km from the existing end stop Pardubička, turntable, to the new stop of the trolleybus line Zámeček (existing final stop of some bus connections no. 12). In addition to the catenary overhead contact line itself, the project will also include adjustments (capacity) of the turnover at the stop Zámeček and the establishment of social facilities (including the necessary connections of civil engineering networks) at this final stop. (English)
    23 October 2020
    0 references

    Identifiers

    CZ.04.1.40/0.0/0.0/16_022/0000135
    0 references