Q71421 (Q71421): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): The subject of the application is a new pond “disciplinary” southwest of the village Polnička in the PKO Žďárské vrchy. The main purpose of the proposed construction is to retain water in the landscape, to protect against floods and a significant increase in biodiversity. As part of the construction, a flow pond will be built, which will be supplied with water from interrupted drainage systems and from a tributary. A ground pool will be built un...)
(‎Changed label, description and/or aliases in 1 language: remove_english_label)
label / enlabel / en
Pond

Revision as of 20:26, 23 October 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
No label defined
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    1,358,706.86 Czech koruna
    0 references
    54,348.27 Euro
    10 January 2020
    0 references
    1,509,674.29 Czech koruna
    0 references
    60,386.97 Euro
    10 January 2020
    0 references
    90.0 percent
    0 references
    21 June 2019
    0 references
    31 July 2020
    0 references
    xxx
    0 references
    0 references

    49°36'14.22"N, 15°56'0.24"E
    0 references
    59102
    0 references
    Předmětem žádosti je novostavba rybníku "Oborník" jihozápadně od obce Polnička v CHKO Žďárské vrchy. Hlavním účelem navržené stavby je zadržení vody v krajině, ochrana před povodněmi a významné zvýšení biodiverzity. V rámci stavby bude vybudován průtočný rybník, který bude zásobován vodou z přerušených drenážních systémů a z plošného přítoku. Pod hrází rybníka bude vybudována zemní tůň. (Czech)
    0 references
    The subject of the application is a new pond “disciplinary” southwest of the village Polnička in the PKO Žďárské vrchy. The main purpose of the proposed construction is to retain water in the landscape, to protect against floods and a significant increase in biodiversity. As part of the construction, a flow pond will be built, which will be supplied with water from interrupted drainage systems and from a tributary. A ground pool will be built under the dam of the pond. (English)
    23 October 2020
    0 references

    Identifiers

    CZ.05.4.27/0.0/0.0/18_108/0008833
    0 references