Restoration of the river shutdown ecosystem of the river Morava (Q68489): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The aid is the recovery of the ecosystem of the shutdown arms of the river Morava in the cadastral district. The old City of Uherský Hradiště. As part of the implementation of the action, extraction of trees from individual arms, landscaping, restoration of non-native species, reconstruction of shore stands and wetlands will be carried out. Among other things, a correction will be made as well as a correction to the connection and discharge ob...)
(‎Created claim: summary (P836): The object of support is the restoration of the ecosystem of the weaned arms of the Morava river in k.ú. Old Town near Uherský Hradiště. As part of the implementation of the action, the extraction of deposits from individual arms, landscaping, non-originating trees, reconstruction of shorelands and wetlands will be removed. Among other things, a repair of the inlet and discharge building in the dam of the Morava River including the fish crossing...)
Property / summary
 
The object of support is the restoration of the ecosystem of the weaned arms of the Morava river in k.ú. Old Town near Uherský Hradiště. As part of the implementation of the action, the extraction of deposits from individual arms, landscaping, non-originating trees, reconstruction of shorelands and wetlands will be removed. Among other things, a repair of the inlet and discharge building in the dam of the Morava River including the fish crossing and the connection of the arms will be carried out. The total length of the revitalised flow is 3542 m. The habitat area is 26.433 ha. (English)
Property / summary: The object of support is the restoration of the ecosystem of the weaned arms of the Morava river in k.ú. Old Town near Uherský Hradiště. As part of the implementation of the action, the extraction of deposits from individual arms, landscaping, non-originating trees, reconstruction of shorelands and wetlands will be removed. Among other things, a repair of the inlet and discharge building in the dam of the Morava River including the fish crossing and the connection of the arms will be carried out. The total length of the revitalised flow is 3542 m. The habitat area is 26.433 ha. (English) / rank
 
Normal rank
Property / summary: The object of support is the restoration of the ecosystem of the weaned arms of the Morava river in k.ú. Old Town near Uherský Hradiště. As part of the implementation of the action, the extraction of deposits from individual arms, landscaping, non-originating trees, reconstruction of shorelands and wetlands will be removed. Among other things, a repair of the inlet and discharge building in the dam of the Morava River including the fish crossing and the connection of the arms will be carried out. The total length of the revitalised flow is 3542 m. The habitat area is 26.433 ha. (English) / qualifier
 
point in time: 23 October 2020
Timestamp+2020-10-23T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 20:03, 23 October 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Restoration of the river shutdown ecosystem of the river Morava
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    208,259,192.06 Czech koruna
    0 references
    8,330,367.68 Euro
    10 January 2020
    0 references
    208,259,192.06 Czech koruna
    0 references
    8,330,367.68 Euro
    10 January 2020
    0 references
    100 percent
    0 references
    1 November 2018
    0 references
    31 December 2023
    0 references
    Slepá ramena, z.ú.
    0 references
    0 references

    49°4'36.44"N, 17°26'23.71"E
    0 references
    68603
    0 references
    Předmětem podpory je obnova ekosystému odstavených ramen řeky Moravy v k.ú. Staré Město u Uherského Hradiště. V rámci realizace akce bude provedeno odtěžení nánosů z jednotlivých ramen, terénní úpravy, dojde k odstranění nepůvodních dřevin, rekonstrukci břehových porostů a mokřadu. Mimo jiné bude provedena i oprava napouštěcího a vypouštěcího objektu v hrázi řeky Moravy včetně rybího přechodu a propojení ramen. Celková délka revitalizovaného toku je 3 542 m. Plocha stanovišť je 26,433 ha. (Czech)
    0 references
    The object of support is the restoration of the ecosystem of the weaned arms of the Morava river in k.ú. Old Town near Uherský Hradiště. As part of the implementation of the action, the extraction of deposits from individual arms, landscaping, non-originating trees, reconstruction of shorelands and wetlands will be removed. Among other things, a repair of the inlet and discharge building in the dam of the Morava River including the fish crossing and the connection of the arms will be carried out. The total length of the revitalised flow is 3542 m. The habitat area is 26.433 ha. (English)
    23 October 2020
    0 references

    Identifiers

    CZ.05.4.27/0.0/0.0/15_013/0004550
    0 references