Modernising the Court of Justice (Q62856): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The modernisation of the existing collection by the Court of Justice will greatly facilitate the handling of waste, while at the same time correcting existing paved areas which are in a non-compliant technical state will be corrected. At the same time, the capacity of the collecting Court is substantially increased (the current state of operation does not allow for increased capacity)., remove_old_english_translation) |
(Created claim: summary (P836): Modernisation of the existing collection yard will significantly facilitate the handling of waste, at the same time the existing reinforced areas of the complex will be repaired, which are in an unsatisfactory technical condition. At the same time, there is a substantial increase in the operational capacity of the collection yard (the current state of operation does not allow the increased capacity)., translated_summary) |
||||||||||||||
Property / summary | |||||||||||||||
Modernisation of the existing collection yard will significantly facilitate the handling of waste, at the same time the existing reinforced areas of the complex will be repaired, which are in an unsatisfactory technical condition. At the same time, there is a substantial increase in the operational capacity of the collection yard (the current state of operation does not allow the increased capacity). (English) | |||||||||||||||
Property / summary: Modernisation of the existing collection yard will significantly facilitate the handling of waste, at the same time the existing reinforced areas of the complex will be repaired, which are in an unsatisfactory technical condition. At the same time, there is a substantial increase in the operational capacity of the collection yard (the current state of operation does not allow the increased capacity). (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Modernisation of the existing collection yard will significantly facilitate the handling of waste, at the same time the existing reinforced areas of the complex will be repaired, which are in an unsatisfactory technical condition. At the same time, there is a substantial increase in the operational capacity of the collection yard (the current state of operation does not allow the increased capacity). (English) / qualifier | |||||||||||||||
point in time: 23 October 2020
|
Revision as of 13:03, 23 October 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Modernising the Court of Justice |
Project in Czech Republic financed by DG Regio |
Statements
7,229,757.5 Czech koruna
0 references
10,631,996.32 Czech koruna
0 references
68.0 percent
0 references
30 May 2017
0 references
16 May 2018
0 references
16 May 2018
0 references
Město Dobříš
0 references
26301
0 references
Modernizací stávajícího sběrného dvora dojde k výraznému usnadnění manipulace s odpady, zároveň dojde k opravě stávajících zpevněných ploch areálu, které jsou v nevyhovujícím technickém stavu. Zároveň dochází k podstatnému navýšení provozované kapacity sběrného dvora (současný stav provoz ve zvýšené kapacitě nedovoluje). (Czech)
0 references
Modernisation of the existing collection yard will significantly facilitate the handling of waste, at the same time the existing reinforced areas of the complex will be repaired, which are in an unsatisfactory technical condition. At the same time, there is a substantial increase in the operational capacity of the collection yard (the current state of operation does not allow the increased capacity). (English)
23 October 2020
0 references
Identifiers
CZ.05.3.29/0.0/0.0/15_005/0000505
0 references