Reconstruction of pavements along the i/14 road in České Třeboč- Stage 2 (Q62695): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The purpose of the project is the construction of a new section of the walkway along the short part of the busy road section of the I/14 road. The absence of a pedestrian at the site does not allow for safe and barrier-free movement in the case of permanent communication. The project will ensure the continuity of the new walkway on existing, barrier-free, walking line infrastructure. The intention is to eliminate the dangerous and potentially...) |
(Created claim: summary (P836): The object of the project is the construction of a new section of the pavement along a short section of the frequented road I/14. The absence of a pavement in the locality does not allow for safe and barrier-free movement in a busy road. The project will ensure the connection of the new pavement to the existing, barrier-free, pedestrian liner infrastructure. The aim is to eliminate dangerous and potentially collision situations that arise on a b...) |
||||||||||||||
Property / summary | |||||||||||||||
The object of the project is the construction of a new section of the pavement along a short section of the frequented road I/14. The absence of a pavement in the locality does not allow for safe and barrier-free movement in a busy road. The project will ensure the connection of the new pavement to the existing, barrier-free, pedestrian liner infrastructure. The aim is to eliminate dangerous and potentially collision situations that arise on a busy road in everyday traffic. (English) | |||||||||||||||
Property / summary: The object of the project is the construction of a new section of the pavement along a short section of the frequented road I/14. The absence of a pavement in the locality does not allow for safe and barrier-free movement in a busy road. The project will ensure the connection of the new pavement to the existing, barrier-free, pedestrian liner infrastructure. The aim is to eliminate dangerous and potentially collision situations that arise on a busy road in everyday traffic. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The object of the project is the construction of a new section of the pavement along a short section of the frequented road I/14. The absence of a pavement in the locality does not allow for safe and barrier-free movement in a busy road. The project will ensure the connection of the new pavement to the existing, barrier-free, pedestrian liner infrastructure. The aim is to eliminate dangerous and potentially collision situations that arise on a busy road in everyday traffic. (English) / qualifier | |||||||||||||||
point in time: 23 October 2020
|
Revision as of 12:51, 23 October 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Reconstruction of pavements along the i/14 road in České Třeboč- Stage 2 |
Project in Czech Republic financed by DG Regio |
Statements
659,821.65 Czech koruna
0 references
694,549.11 Czech koruna
0 references
95.0 percent
0 references
1 January 2018
0 references
23 October 2018
0 references
31 December 2019
0 references
Město Česká Třebová
0 references
56002
0 references
Předmětem projektu je výstavba nového úseku chodníku podél krátké části úseku frekventované silnice I/14. Absence chodníku v lokalitě neumožňuje bezpečný a bezbariérový pohyb u frekventované komunikace. Projekt zajistí návaznost nového chodníku na stávající, bezbariérovou, pěší liniovou infrastrukturu. Záměrem je eliminovat nebezpečné a potenciálně kolizní situace, které u rušné silnice v každodenním provozu vznikají. (Czech)
0 references
The object of the project is the construction of a new section of the pavement along a short section of the frequented road I/14. The absence of a pavement in the locality does not allow for safe and barrier-free movement in a busy road. The project will ensure the connection of the new pavement to the existing, barrier-free, pedestrian liner infrastructure. The aim is to eliminate dangerous and potentially collision situations that arise on a busy road in everyday traffic. (English)
23 October 2020
0 references
Identifiers
CZ.06.4.59/0.0/0.0/16_038/0007861