Sewerage and wastewater treatment plant under Hostýnem (Q60331): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The purpose of the project is to build a new sewerage system in Hlinsk under Hostýn and the collection of the existing uniform sewerage system is carried out in the newly proposed ČS1 service station, followed by a transfer of waste water (in I.1 for 55 % of southern building) to a new treatment plant of the wastewater treatment plant located in the cadastral district of the region. Hlinsko under Hostýnem — Nos 970/23 and 970/13. Here there wi...) |
(Created claim: summary (P836): The purpose of the project is to build a new sewerage system in Hlinsko pod Hostýnem and to capture the existing unified sewerage system with the introduction to the newly designed petrol station ČS1 with subsequent overdraft of waste water (in I.stage for 55 % of the southern construction) to the new wastewater treatment plant located in k.ú. Hlinsko pod Hostýnem – p. 970/23 and 970/13. There will be a mechanical-biological treatment of the OV...) |
||||||||||||||
Property / summary | |||||||||||||||
The purpose of the project is to build a new sewerage system in Hlinsko pod Hostýnem and to capture the existing unified sewerage system with the introduction to the newly designed petrol station ČS1 with subsequent overdraft of waste water (in I.stage for 55 % of the southern construction) to the new wastewater treatment plant located in k.ú. Hlinsko pod Hostýnem – p. 970/23 and 970/13. There will be a mechanical-biological treatment of the OV and the purified waste water from the WWTP will be discharged by the drainage facility into the receiving Slavkovský creek. (English) | |||||||||||||||
Property / summary: The purpose of the project is to build a new sewerage system in Hlinsko pod Hostýnem and to capture the existing unified sewerage system with the introduction to the newly designed petrol station ČS1 with subsequent overdraft of waste water (in I.stage for 55 % of the southern construction) to the new wastewater treatment plant located in k.ú. Hlinsko pod Hostýnem – p. 970/23 and 970/13. There will be a mechanical-biological treatment of the OV and the purified waste water from the WWTP will be discharged by the drainage facility into the receiving Slavkovský creek. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The purpose of the project is to build a new sewerage system in Hlinsko pod Hostýnem and to capture the existing unified sewerage system with the introduction to the newly designed petrol station ČS1 with subsequent overdraft of waste water (in I.stage for 55 % of the southern construction) to the new wastewater treatment plant located in k.ú. Hlinsko pod Hostýnem – p. 970/23 and 970/13. There will be a mechanical-biological treatment of the OV and the purified waste water from the WWTP will be discharged by the drainage facility into the receiving Slavkovský creek. (English) / qualifier | |||||||||||||||
point in time: 23 October 2020
|
Revision as of 12:13, 23 October 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Sewerage and wastewater treatment plant under Hostýnem |
Project in Czech Republic financed by DG Regio |
Statements
11,876,598.93 Czech koruna
0 references
18,629,959.11 Czech koruna
0 references
63.75 percent
0 references
10 July 2018
0 references
31 December 2020
0 references
Vodovody a kanalizace Kroměříž, a.s.
0 references
76701
0 references
Účelem projektu je v Hlinsku pod Hostýnem výstavba nové kanalizace a podchycení stávající jednotné kanalizace se svedením do nově navržené čerpací stanice ČS1 s následným přečerpáním odpadních vod (v I.etapě pro 55% jižní zástavby) na novou čistírnu ČOV, umístěnou v k.ú. Hlinsko pod Hostýnem - p. č. 970/23 a 970/13. Zde bude probíhat mechanicko-biologické čištění OV a vyčištěná odpadní voda z ČOV bude vypouštěna výpustným objektem kanalizace do recipientu Slavkovský potok. (Czech)
0 references
The purpose of the project is to build a new sewerage system in Hlinsko pod Hostýnem and to capture the existing unified sewerage system with the introduction to the newly designed petrol station ČS1 with subsequent overdraft of waste water (in I.stage for 55 % of the southern construction) to the new wastewater treatment plant located in k.ú. Hlinsko pod Hostýnem – p. 970/23 and 970/13. There will be a mechanical-biological treatment of the OV and the purified waste water from the WWTP will be discharged by the drainage facility into the receiving Slavkovský creek. (English)
23 October 2020
0 references
Identifiers
CZ.05.1.30/0.0/0.0/16_042/0004713
0 references