Group water supply system from the Kopivnsko (Q61372): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The project aims at ensuring the supply of drinking water in the corresponding quantity for the part of the Kopivnska part. It is about providing another source of drinking water, as the existing source of drinking water, well R-3, is at the edge of its capacity thanks to the constraint imposed. The project involves the construction of a number of Staňkova Lhota — Rakov Baltín, allowing for connection with the resources of the group water supp...)
(‎Created claim: summary (P836): The aim of the project is to ensure the supply of drinking water in the corresponding quantity for the area of Kopidlnska. It is about providing an additional source of drinking water, as the existing source of drinking water, R-3, is at the edge of its capacity due to the restrictions on consumption. The project includes the construction of the supply line Staňkova Lhota – Rakov Batín, allowing connection to the Sobotka group water supply sourc...)
Property / summary
 
The aim of the project is to ensure the supply of drinking water in the corresponding quantity for the area of Kopidlnska. It is about providing an additional source of drinking water, as the existing source of drinking water, R-3, is at the edge of its capacity due to the restrictions on consumption. The project includes the construction of the supply line Staňkova Lhota – Rakov Batín, allowing connection to the Sobotka group water supply sources. Part of the project is also the construction of a new water reservoir Chakan, which will ensure sufficient accumulation of drinking water. (English)
Property / summary: The aim of the project is to ensure the supply of drinking water in the corresponding quantity for the area of Kopidlnska. It is about providing an additional source of drinking water, as the existing source of drinking water, R-3, is at the edge of its capacity due to the restrictions on consumption. The project includes the construction of the supply line Staňkova Lhota – Rakov Batín, allowing connection to the Sobotka group water supply sources. Part of the project is also the construction of a new water reservoir Chakan, which will ensure sufficient accumulation of drinking water. (English) / rank
 
Normal rank
Property / summary: The aim of the project is to ensure the supply of drinking water in the corresponding quantity for the area of Kopidlnska. It is about providing an additional source of drinking water, as the existing source of drinking water, R-3, is at the edge of its capacity due to the restrictions on consumption. The project includes the construction of the supply line Staňkova Lhota – Rakov Batín, allowing connection to the Sobotka group water supply sources. Part of the project is also the construction of a new water reservoir Chakan, which will ensure sufficient accumulation of drinking water. (English) / qualifier
 
point in time: 23 October 2020
Timestamp+2020-10-23T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 12:09, 23 October 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Group water supply system from the Kopivnsko
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    41,331,082.49 Czech koruna
    0 references
    1,653,243.30 Euro
    10 January 2020
    0 references
    64,833,070.59 Czech koruna
    0 references
    2,593,322.82 Euro
    10 January 2020
    0 references
    63.75 percent
    0 references
    30 September 2022
    0 references
    Vodohospodářská a obchodní společnost, a.s.
    0 references
    0 references

    50°26'15.14"N, 15°19'55.52"E
    0 references
    50601
    0 references
    Cílem projektu je zajistit dodávku pitné vody v odpovídajícím množství pro řešenou oblast části Kopidlnska. Jde o zajištění dalšího zdroje pitné vody, neboť stávající zdroj pitné vody, vrt R-3, je na hraně své kapacity díky vydanému omezení k odběru. Projekt zahrnuje výstavbu přívodního řadu Staňkova Lhota - Rakov Batín, umožňující napojení na zdroje skupinového vodovodu Sobotka. Součástí projektu je rovněž výstavba nového zásobního vodojemu Čakan, který zajistí dostatečnou akumulaci pitné vody. (Czech)
    0 references
    The aim of the project is to ensure the supply of drinking water in the corresponding quantity for the area of Kopidlnska. It is about providing an additional source of drinking water, as the existing source of drinking water, R-3, is at the edge of its capacity due to the restrictions on consumption. The project includes the construction of the supply line Staňkova Lhota – Rakov Batín, allowing connection to the Sobotka group water supply sources. Part of the project is also the construction of a new water reservoir Chakan, which will ensure sufficient accumulation of drinking water. (English)
    23 October 2020
    0 references

    Identifiers

    CZ.05.1.30/0.0/0.0/17_073/0007237
    0 references