Q61343 (Q61343): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): The project deals with the extension of the existing water infrastructure of the village Doubravčice. The construction includes the construction of a new storage tank of water with treatment water (drawing) and related technological equipment, new pipe connections, new access road to the building including downhill, fencing, fitting 3 pcs. wells and connection of the IU to the treatment plant and subsequently to individual wells. The water will...)
(‎Changed label, description and/or aliases in 1 language: remove_english_label)
label / enlabel / en
The extension of the drinking water supply to the municipality of Doubravčice

Revision as of 12:08, 23 October 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
No label defined
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    7,522,366.12 Czech koruna
    0 references
    300,894.64 Euro
    10 January 2020
    0 references
    11,799,790.0 Czech koruna
    0 references
    471,991.60 Euro
    10 January 2020
    0 references
    63.75 percent
    0 references
    30 June 2020
    0 references
    Obec Doubravčice
    0 references
    0 references
    0 references

    50°3'39.64"N, 14°50'36.56"E
    0 references
    28201
    0 references
    Projekt řeší rozšíření stávající vodárenské infrastruktury obce Doubravčice. Stavba zahrnuje výstavbu nové akumulační nádrže vody s úpravnou vody (odradonování) a příslušné technologické vystrojení, nové trubní propoje, novou příjezdovou komunikaci k objektu včetně sjezdu, oplocení, vystrojení 3 ks. vrtů a přípojku NN k objektu úpravny a následně k jednotlivým vrtům. Voda bude do prostoru akumulační nádrže dopravována čerpáním z nových vrtů v celkovém počtu 3 ks. (Czech)
    0 references
    The project deals with the extension of the existing water infrastructure of the village Doubravčice. The construction includes the construction of a new storage tank of water with treatment water (drawing) and related technological equipment, new pipe connections, new access road to the building including downhill, fencing, fitting 3 pcs. wells and connection of the IU to the treatment plant and subsequently to individual wells. The water will be transported to the storage tank area by pumping from new wells in a total number of 3 pieces. (English)
    23 October 2020
    0 references

    Identifiers

    CZ.05.1.30/0.0/0.0/17_073/0007200
    0 references