(Removed claim: summary (P836): The project addresses the extension of the existing water infrastructure of Doubravčice. The construction includes the construction of a new water storage tank and the water treatment plant (reflected) and the relevant engineering material, a new tube, a new approach to the object including a running gear, a fence, a drain of 3 Ks and a connection to the treatment site, and then to the individual wells. The water will be transported to the sto...) |
(Created claim: summary (P836): The project deals with the extension of the existing water infrastructure of the village Doubravčice. The construction includes the construction of a new storage tank of water with treatment water (drawing) and related technological equipment, new pipe connections, new access road to the building including downhill, fencing, fitting 3 pcs. wells and connection of the IU to the treatment plant and subsequently to individual wells. The water will...) |
||||||||||||||
Property / summary | |||||||||||||||
The project deals with the extension of the existing water infrastructure of the village Doubravčice. The construction includes the construction of a new storage tank of water with treatment water (drawing) and related technological equipment, new pipe connections, new access road to the building including downhill, fencing, fitting 3 pcs. wells and connection of the IU to the treatment plant and subsequently to individual wells. The water will be transported to the storage tank area by pumping from new wells in a total number of 3 pieces. (English) | |||||||||||||||
Property / summary: The project deals with the extension of the existing water infrastructure of the village Doubravčice. The construction includes the construction of a new storage tank of water with treatment water (drawing) and related technological equipment, new pipe connections, new access road to the building including downhill, fencing, fitting 3 pcs. wells and connection of the IU to the treatment plant and subsequently to individual wells. The water will be transported to the storage tank area by pumping from new wells in a total number of 3 pieces. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The project deals with the extension of the existing water infrastructure of the village Doubravčice. The construction includes the construction of a new storage tank of water with treatment water (drawing) and related technological equipment, new pipe connections, new access road to the building including downhill, fencing, fitting 3 pcs. wells and connection of the IU to the treatment plant and subsequently to individual wells. The water will be transported to the storage tank area by pumping from new wells in a total number of 3 pieces. (English) / qualifier | |||||||||||||||
point in time: 23 October 2020
|
Revision as of 12:08, 23 October 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | The extension of the drinking water supply to the municipality of Doubravčice |
Project in Czech Republic financed by DG Regio |
Statements
7,522,366.12 Czech koruna
0 references
11,799,790.0 Czech koruna
0 references
63.75 percent
0 references
30 June 2020
0 references
Obec Doubravčice
0 references
28201
0 references
Projekt řeší rozšíření stávající vodárenské infrastruktury obce Doubravčice. Stavba zahrnuje výstavbu nové akumulační nádrže vody s úpravnou vody (odradonování) a příslušné technologické vystrojení, nové trubní propoje, novou příjezdovou komunikaci k objektu včetně sjezdu, oplocení, vystrojení 3 ks. vrtů a přípojku NN k objektu úpravny a následně k jednotlivým vrtům. Voda bude do prostoru akumulační nádrže dopravována čerpáním z nových vrtů v celkovém počtu 3 ks. (Czech)
0 references
The project deals with the extension of the existing water infrastructure of the village Doubravčice. The construction includes the construction of a new storage tank of water with treatment water (drawing) and related technological equipment, new pipe connections, new access road to the building including downhill, fencing, fitting 3 pcs. wells and connection of the IU to the treatment plant and subsequently to individual wells. The water will be transported to the storage tank area by pumping from new wells in a total number of 3 pieces. (English)
23 October 2020
0 references
Identifiers
CZ.05.1.30/0.0/0.0/17_073/0007200
0 references