ČOV and sewers Malovice and Malovičky (Q61205): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The current status of the wastewater treatment system in Malovice and Maloviáček is unsatisfactory. The treatment of sewage is carried out in a septic tank and the sewer leads to a wall to Malvoke. It is proposed that a new waste water treatment plant (capacity of 400 EO) be built up with the capture of current outlets through the reclining assemblies built on strikes of the sewers. The connection of the sewage network from Malvic to Maloviček...)
(‎Created claim: summary (P836): The current state of the sewage treatment system in Malovice and Malovičky is unsatisfactory. Sewage cleaning is carried out in septic tanks and the sewerage is located in Malovice pond. The construction of a new wastewater treatment plant (capacity 400 EO) is proposed with the capacitance of existing free drains through the endurance chambers built on becoming sewer lines. The connection of the sewer network from Malovice to Maloviček will be e...)
Property / summary
 
The current state of the sewage treatment system in Malovice and Malovičky is unsatisfactory. Sewage cleaning is carried out in septic tanks and the sewerage is located in Malovice pond. The construction of a new wastewater treatment plant (capacity 400 EO) is proposed with the capacitance of existing free drains through the endurance chambers built on becoming sewer lines. The connection of the sewer network from Malovice to Maloviček will be ensured by the extrusion line. SP is issued for the project with a plan to acquire legal power 31.1.2018. (English)
Property / summary: The current state of the sewage treatment system in Malovice and Malovičky is unsatisfactory. Sewage cleaning is carried out in septic tanks and the sewerage is located in Malovice pond. The construction of a new wastewater treatment plant (capacity 400 EO) is proposed with the capacitance of existing free drains through the endurance chambers built on becoming sewer lines. The connection of the sewer network from Malovice to Maloviček will be ensured by the extrusion line. SP is issued for the project with a plan to acquire legal power 31.1.2018. (English) / rank
 
Normal rank
Property / summary: The current state of the sewage treatment system in Malovice and Malovičky is unsatisfactory. Sewage cleaning is carried out in septic tanks and the sewerage is located in Malovice pond. The construction of a new wastewater treatment plant (capacity 400 EO) is proposed with the capacitance of existing free drains through the endurance chambers built on becoming sewer lines. The connection of the sewer network from Malovice to Maloviček will be ensured by the extrusion line. SP is issued for the project with a plan to acquire legal power 31.1.2018. (English) / qualifier
 
point in time: 23 October 2020
Timestamp+2020-10-23T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 11:45, 23 October 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
ČOV and sewers Malovice and Malovičky
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    16,865,251.2 Czech koruna
    0 references
    674,610.05 Euro
    10 January 2020
    0 references
    26,455,296.0 Czech koruna
    0 references
    1,058,211.84 Euro
    10 January 2020
    0 references
    63.75 percent
    0 references
    31 July 2021
    0 references
    Obec Malovice
    0 references
    0 references
    0 references

    49°2'46.54"N, 14°11'53.66"E
    0 references
    38411
    0 references
    Stávající stav systému čištění odpadních vod v Malovicích a Malovičkách je nevyhovující. Čištění splašků probíhá v septicích a kanalizace je vyústěna do Malovického rybníka. Je navrženo vybudování nové ČOV (kapacita 400 EO) s podchycením stávajících volných výustí přes odlehčovací komory vybudované na stávávajících kanalizačních řadech. Propojení kanalizační sítě z Malovic do Maloviček bude zajištěno výtlačným řadem. Na projekt je vydáno SP s plánem nabytí právní moci 31.1.2018. (Czech)
    0 references
    The current state of the sewage treatment system in Malovice and Malovičky is unsatisfactory. Sewage cleaning is carried out in septic tanks and the sewerage is located in Malovice pond. The construction of a new wastewater treatment plant (capacity 400 EO) is proposed with the capacitance of existing free drains through the endurance chambers built on becoming sewer lines. The connection of the sewer network from Malovice to Maloviček will be ensured by the extrusion line. SP is issued for the project with a plan to acquire legal power 31.1.2018. (English)
    23 October 2020
    0 references

    Identifiers

    CZ.05.1.30/0.0/0.0/17_071/0007281
    0 references