ČOV and sewers Malovice and Malovičky (Q61205): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The current status of the wastewater treatment system in Malovice and Maloviáček is unsatisfactory. The treatment of sewage is carried out in a septic tank and the sewer leads to a wall to Malvoke. It is proposed that a new waste water treatment plant (capacity of 400 EO) be built up with the capture of current outlets through the reclining assemblies built on strikes of the sewers. The connection of the sewage network from Malvic to Maloviček...) |
(Created claim: summary (P836): The current state of the sewage treatment system in Malovice and Malovičky is unsatisfactory. Sewage cleaning is carried out in septic tanks and the sewerage is located in Malovice pond. The construction of a new wastewater treatment plant (capacity 400 EO) is proposed with the capacitance of existing free drains through the endurance chambers built on becoming sewer lines. The connection of the sewer network from Malovice to Maloviček will be e...) |
||||||||||||||
Property / summary | |||||||||||||||
The current state of the sewage treatment system in Malovice and Malovičky is unsatisfactory. Sewage cleaning is carried out in septic tanks and the sewerage is located in Malovice pond. The construction of a new wastewater treatment plant (capacity 400 EO) is proposed with the capacitance of existing free drains through the endurance chambers built on becoming sewer lines. The connection of the sewer network from Malovice to Maloviček will be ensured by the extrusion line. SP is issued for the project with a plan to acquire legal power 31.1.2018. (English) | |||||||||||||||
Property / summary: The current state of the sewage treatment system in Malovice and Malovičky is unsatisfactory. Sewage cleaning is carried out in septic tanks and the sewerage is located in Malovice pond. The construction of a new wastewater treatment plant (capacity 400 EO) is proposed with the capacitance of existing free drains through the endurance chambers built on becoming sewer lines. The connection of the sewer network from Malovice to Maloviček will be ensured by the extrusion line. SP is issued for the project with a plan to acquire legal power 31.1.2018. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The current state of the sewage treatment system in Malovice and Malovičky is unsatisfactory. Sewage cleaning is carried out in septic tanks and the sewerage is located in Malovice pond. The construction of a new wastewater treatment plant (capacity 400 EO) is proposed with the capacitance of existing free drains through the endurance chambers built on becoming sewer lines. The connection of the sewer network from Malovice to Maloviček will be ensured by the extrusion line. SP is issued for the project with a plan to acquire legal power 31.1.2018. (English) / qualifier | |||||||||||||||
point in time: 23 October 2020
|
Revision as of 11:45, 23 October 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | ČOV and sewers Malovice and Malovičky |
Project in Czech Republic financed by DG Regio |
Statements
16,865,251.2 Czech koruna
0 references
26,455,296.0 Czech koruna
0 references
63.75 percent
0 references
31 July 2021
0 references
Obec Malovice
0 references
38411
0 references
Stávající stav systému čištění odpadních vod v Malovicích a Malovičkách je nevyhovující. Čištění splašků probíhá v septicích a kanalizace je vyústěna do Malovického rybníka. Je navrženo vybudování nové ČOV (kapacita 400 EO) s podchycením stávajících volných výustí přes odlehčovací komory vybudované na stávávajících kanalizačních řadech. Propojení kanalizační sítě z Malovic do Maloviček bude zajištěno výtlačným řadem. Na projekt je vydáno SP s plánem nabytí právní moci 31.1.2018. (Czech)
0 references
The current state of the sewage treatment system in Malovice and Malovičky is unsatisfactory. Sewage cleaning is carried out in septic tanks and the sewerage is located in Malovice pond. The construction of a new wastewater treatment plant (capacity 400 EO) is proposed with the capacitance of existing free drains through the endurance chambers built on becoming sewer lines. The connection of the sewer network from Malovice to Maloviček will be ensured by the extrusion line. SP is issued for the project with a plan to acquire legal power 31.1.2018. (English)
23 October 2020
0 references
Identifiers
CZ.05.1.30/0.0/0.0/17_071/0007281
0 references