Sewage system and wastewater treatment plant - Q61057 (Q61057): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The purpose of the project is the construction of gravitational sewage, an error of standing, the construction of 12 traffic shedding chambers and a new wastewater treatment plant in the municipality of Skate in the Zlín Region, the cadastral district of the Zlin Region. 757861.The new wastewater treatment proposed for 3 008.6 m and the new wastewater treatment plant with a capacity of 800 EO are proposed. In the proposal for a technical solut...)
(‎Created claim: summary (P836): The purpose of the project is to build gravitational sewage sewage, capture existing sewers, build 12 endurance chambers and a new WWTP in the village of Střílky in the Zlín Region, k.ú. 757861.The project consists of newly designed sewer drains with a length of 3008.6 m and a new wastewater treatment plant with a capacity of 800 EO. In the design of the technical solution is chosen the technological line cleaning OV in the assembly of mechanica...)
Property / summary
 
The purpose of the project is to build gravitational sewage sewage, capture existing sewers, build 12 endurance chambers and a new WWTP in the village of Střílky in the Zlín Region, k.ú. 757861.The project consists of newly designed sewer drains with a length of 3008.6 m and a new wastewater treatment plant with a capacity of 800 EO. In the design of the technical solution is chosen the technological line cleaning OV in the assembly of mechanical and biological cleaning and sludge end with gravitational concentration of sludge. The OV will then lead through the drainage object to the Střítecký creek. (English)
Property / summary: The purpose of the project is to build gravitational sewage sewage, capture existing sewers, build 12 endurance chambers and a new WWTP in the village of Střílky in the Zlín Region, k.ú. 757861.The project consists of newly designed sewer drains with a length of 3008.6 m and a new wastewater treatment plant with a capacity of 800 EO. In the design of the technical solution is chosen the technological line cleaning OV in the assembly of mechanical and biological cleaning and sludge end with gravitational concentration of sludge. The OV will then lead through the drainage object to the Střítecký creek. (English) / rank
 
Normal rank
Property / summary: The purpose of the project is to build gravitational sewage sewage, capture existing sewers, build 12 endurance chambers and a new WWTP in the village of Střílky in the Zlín Region, k.ú. 757861.The project consists of newly designed sewer drains with a length of 3008.6 m and a new wastewater treatment plant with a capacity of 800 EO. In the design of the technical solution is chosen the technological line cleaning OV in the assembly of mechanical and biological cleaning and sludge end with gravitational concentration of sludge. The OV will then lead through the drainage object to the Střítecký creek. (English) / qualifier
 
point in time: 23 October 2020
Timestamp+2020-10-23T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 11:36, 23 October 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Sewage system and wastewater treatment plant - Q61057
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    40,564,206.17 Czech koruna
    0 references
    1,622,568.25 Euro
    10 January 2020
    0 references
    63,630,127.33 Czech koruna
    0 references
    2,545,205.09 Euro
    10 January 2020
    0 references
    63.75 percent
    0 references
    30 April 2021
    0 references
    Vodovody a kanalizace Kroměříž, a.s.
    0 references
    0 references

    49°17'19.03"N, 17°23'24.36"E
    0 references
    76701
    0 references
    Účelem projektu je výstavba gravitační splaškové kanalizace, pochycení stávajících stok, vybudování 12 odlehčovacích komor a nové ČOV v obci Střílky ve Zlínském kraji, k.ú. 757861.Projektem jsou nově navržené kanalizační stoky v délce 3 008,6 m a nová ČOV s kapacitou 800 EO. V návrhu technického řešení je zvolena technologická linka čištění OV v sestavě mechanického a biologického čištění a kalová koncovka s gravitačním zahuštěním kalu. OV pak povedou přes výpustný objekt do Stříteckého potoka. (Czech)
    0 references
    The purpose of the project is to build gravitational sewage sewage, capture existing sewers, build 12 endurance chambers and a new WWTP in the village of Střílky in the Zlín Region, k.ú. 757861.The project consists of newly designed sewer drains with a length of 3008.6 m and a new wastewater treatment plant with a capacity of 800 EO. In the design of the technical solution is chosen the technological line cleaning OV in the assembly of mechanical and biological cleaning and sludge end with gravitational concentration of sludge. The OV will then lead through the drainage object to the Střítecký creek. (English)
    23 October 2020
    0 references

    Identifiers

    CZ.05.1.30/0.0/0.0/17_071/0007180