Pond Vidlák — study of the endangered territory of a particular flood (Q59111): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The project addresses the determination of the flood plain line, the course and the size of a particular flood caused by the bursting of the fishpond Vidulk, including the timing of the peak period of the territory. The output is for the purpose of determining potential damage and for the crisis management department., remove_old_english_translation)
(‎Created claim: summary (P836): The project solves the determination of the flood line, the course and size of the culmination of a special flood caused by the rupture of the Vidlák pond, including the time progress of the culmination of the territory. The output is used to determine potential damage and for the crisis management department., translated_summary)
Property / summary
 
The project solves the determination of the flood line, the course and size of the culmination of a special flood caused by the rupture of the Vidlák pond, including the time progress of the culmination of the territory. The output is used to determine potential damage and for the crisis management department. (English)
Property / summary: The project solves the determination of the flood line, the course and size of the culmination of a special flood caused by the rupture of the Vidlák pond, including the time progress of the culmination of the territory. The output is used to determine potential damage and for the crisis management department. (English) / rank
 
Normal rank
Property / summary: The project solves the determination of the flood line, the course and size of the culmination of a special flood caused by the rupture of the Vidlák pond, including the time progress of the culmination of the territory. The output is used to determine potential damage and for the crisis management department. (English) / qualifier
 
point in time: 23 October 2020
Timestamp+2020-10-23T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 11:16, 23 October 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Pond Vidlák — study of the endangered territory of a particular flood
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    236,966.4 Czech koruna
    0 references
    9,478.66 Euro
    10 January 2020
    0 references
    278,784.0 Czech koruna
    0 references
    11,151.36 Euro
    10 January 2020
    0 references
    85 percent
    0 references
    30 May 2016
    0 references
    15 November 2018
    0 references
    30 September 2019
    0 references
    Město Kutná Hora
    0 references
    0 references
    0 references

    49°56'20.04"N, 15°15'50.65"E
    0 references
    28401
    0 references
    Projekt řeší stanovení záplavové čáry, průběh a velikost kulminace zvláštní povodně vzniklé protržením rybníka Vidlák včetně časového postupu kulminace územím. Výstup slouží ke stanovení potenciálních škod a pro odbor krizového řízení. (Czech)
    0 references
    The project solves the determination of the flood line, the course and size of the culmination of a special flood caused by the rupture of the Vidlák pond, including the time progress of the culmination of the territory. The output is used to determine potential damage and for the crisis management department. (English)
    23 October 2020
    0 references

    Identifiers

    CZ.05.1.24/0.0/0.0/17_066/0007028
    0 references