Clean-up of rock wall — ul. U Obj’s head in Znojmo (Q57764): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The strategic objective of the project is the stabilisation and remediation of the disstability, which is a threat to the health and safety of people and assets in the countries concerned by the rehabilitation of the rocks in Znojmo in Znojmo. The construction period is expected to be 2 months., remove_old_english_translation) |
(Created claim: summary (P836): The strategic objective of the project is to stabilise and remedie slope instability that threaten the health and safety of people and property on the land concerned by remediing the rock massif in Znojmo. The construction is expected to be completed for 2 months., translated_summary) |
||||||||||||||
Property / summary | |||||||||||||||
The strategic objective of the project is to stabilise and remedie slope instability that threaten the health and safety of people and property on the land concerned by remediing the rock massif in Znojmo. The construction is expected to be completed for 2 months. (English) | |||||||||||||||
Property / summary: The strategic objective of the project is to stabilise and remedie slope instability that threaten the health and safety of people and property on the land concerned by remediing the rock massif in Znojmo. The construction is expected to be completed for 2 months. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The strategic objective of the project is to stabilise and remedie slope instability that threaten the health and safety of people and property on the land concerned by remediing the rock massif in Znojmo. The construction is expected to be completed for 2 months. (English) / qualifier | |||||||||||||||
point in time: 23 October 2020
|
Revision as of 10:56, 23 October 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Clean-up of rock wall — ul. U Obj’s head in Znojmo |
Project in Czech Republic financed by DG Regio |
Statements
2,230,288.29 Czech koruna
0 references
2,623,868.58 Czech koruna
0 references
85.0 percent
0 references
15 July 2016
0 references
13 September 2016
0 references
30 June 2017
0 references
Město Znojmo
0 references
66902
0 references
Strategickým cílem projektu je stabilizace a sanace svahových nestabilit, které ohrožují zdraví a bezpečnost osob a majetku na dotčených pozemích a to sanací skalního masívu ve městě Znojmo. Doba realizace stavby se předpokládá 2 měsíce. (Czech)
0 references
The strategic objective of the project is to stabilise and remedie slope instability that threaten the health and safety of people and property on the land concerned by remediing the rock massif in Znojmo. The construction is expected to be completed for 2 months. (English)
23 October 2020
0 references
Identifiers
CZ.05.1.24/0.0/0.0/15_003/0000238
0 references