Q59732 (Q59732): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): The purpose of this construction is to drain the village Šumice and drain the waste water from the village to the sewerage in Újezdec u Luhačovice. From Újezdec u Luhačovice the waste water will be drained to the existing WWTP in Uherské Brod, where they will be cleaned and subsequently discharged to Olšava., translated_summary)
(‎Changed label, description and/or aliases in 1 language: remove_english_label)
label / enlabel / en
Sewerage, Šumice — Stage 2

Revision as of 10:49, 23 October 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
No label defined
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    687,931.97 Czech koruna
    0 references
    27,517.28 Euro
    10 January 2020
    0 references
    809,331.74 Czech koruna
    0 references
    32,373.27 Euro
    10 January 2020
    0 references
    85.0 percent
    0 references
    11 April 2016
    0 references
    30 June 2017
    0 references
    30 June 2017
    0 references
    Slovácké vodárny a kanalizace, a. s.
    0 references
    0 references

    49°4'9.26"N, 17°27'8.50"E
    0 references
    68601
    0 references
    Účelem této stavby je odkanalizování obce Šumice a odvedení odpadních vod z obce do kanalizace v Újezdci u Luhačovic. Z Újezdce u Luhačovic budou odpadní vody odváděny na stávající ČOV v Uherském Brodě, kde budou čištěny a následně vypouštěny do Olšavy. (Czech)
    0 references
    The purpose of this construction is to drain the village Šumice and drain the waste water from the village to the sewerage in Újezdec u Luhačovice. From Újezdec u Luhačovice the waste water will be drained to the existing WWTP in Uherské Brod, where they will be cleaned and subsequently discharged to Olšava. (English)
    23 October 2020
    0 references

    Identifiers

    CZ.05.1.30/0.0/0.0/15_001/0000547
    0 references