Road I/38 Znojmo — Bypass, section II (Q57691): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The purpose of the project is the construction of the I/38 road in category S 11,5/80 in category S, of the total length of the main route of 3.532 km, which forms part of the second part of the Znojmo road bypass. The implementation of the project will lead to the payment of transit traffic away from the building of the city, thus reducing the burden of the population by noise and exile. It will also shorten journey times and improve traffic...) |
(Created claim: summary (P836): The object of the project is the construction of the relocation of road I/38 in category S 11,5/80 in the total length of the main route 3.532 km, which forms part of the second part of the road bypass of Znojma. The implementation of the project will lead to the transfer of transit traffic outside the city’s construction and thus reduce the burden of the population by noise and exhalations. It will also reduce travel time and increase traffic f...) |
||||||||||||||
Property / summary | |||||||||||||||
The object of the project is the construction of the relocation of road I/38 in category S 11,5/80 in the total length of the main route 3.532 km, which forms part of the second part of the road bypass of Znojma. The implementation of the project will lead to the transfer of transit traffic outside the city’s construction and thus reduce the burden of the population by noise and exhalations. It will also reduce travel time and increase traffic flow on road I/38 and increase road safety, including pedestrian safety. (English) | |||||||||||||||
Property / summary: The object of the project is the construction of the relocation of road I/38 in category S 11,5/80 in the total length of the main route 3.532 km, which forms part of the second part of the road bypass of Znojma. The implementation of the project will lead to the transfer of transit traffic outside the city’s construction and thus reduce the burden of the population by noise and exhalations. It will also reduce travel time and increase traffic flow on road I/38 and increase road safety, including pedestrian safety. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The object of the project is the construction of the relocation of road I/38 in category S 11,5/80 in the total length of the main route 3.532 km, which forms part of the second part of the road bypass of Znojma. The implementation of the project will lead to the transfer of transit traffic outside the city’s construction and thus reduce the burden of the population by noise and exhalations. It will also reduce travel time and increase traffic flow on road I/38 and increase road safety, including pedestrian safety. (English) / qualifier | |||||||||||||||
point in time: 23 October 2020
|
Revision as of 10:39, 23 October 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Road I/38 Znojmo — Bypass, section II |
Project in Czech Republic financed by DG Regio |
Statements
298,886,378.9 Czech koruna
0 references
351,631,034.0 Czech koruna
0 references
85 percent
0 references
8 September 2016
0 references
31 December 2019
0 references
Ředitelství silnic a dálnic ČR
0 references
14000
0 references
Předmětem projektu je výstavba přeložky silnice I/38 v kategorii S 11,5/80 v celkové délce hlavní trasy 3,532 km, která tvoří II. část silničního obchvatu města Znojma. Realizací projektu dojde k odvedení tranzitní dopravy mimo zástavbu města a sníží se tak zátěž obyvatelstva hlukem a exhalacemi. Dojde rovněž ke zkrácení jízdní doby a zvýšení plynulosti dopravy na silnici I/38 a zvýšení bezpečnosti silničního provozu včetně bezpečnosti chodců. (Czech)
0 references
The object of the project is the construction of the relocation of road I/38 in category S 11,5/80 in the total length of the main route 3.532 km, which forms part of the second part of the road bypass of Znojma. The implementation of the project will lead to the transfer of transit traffic outside the city’s construction and thus reduce the burden of the population by noise and exhalations. It will also reduce travel time and increase traffic flow on road I/38 and increase road safety, including pedestrian safety. (English)
23 October 2020
0 references
Identifiers
CZ.04.3.42/0.0/0.0/15_004/0000071
0 references