Building up of an additional network of the ECKROKROZPROJKPROJECKZKZKJKZKJKZKJKZKJKZKOL@@ (Q57646): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): This project aims at expanding the charging infrastructure for electric vehicles. An AC of 18 conventional AC stations will be built, with a maximum output of 22 kW in selected locations in the North-East of the Czech Republic. Recharging points will be built on leased land. The project will start after the adoption of the legal act under the assumption 2.1.2019 and will last until 31.12.2020. The aid intensity requested is 70 %. The total el...)
(‎Created claim: summary (P836): This project is aimed at expanding charging infrastructure for electric vehicles. 18 common AC charging stations will be built with a maximum output of 22 kW in selected locations in the northeastern part of the Czech Republic. Recharging stations will be built on leased land. The project will start after the adoption of a legal act with a presumption of 2.1.2019 and will last until 31.12.2020. The aid intensity required is 70 %. The total elig...)
Property / summary
 
This project is aimed at expanding charging infrastructure for electric vehicles. 18 common AC charging stations will be built with a maximum output of 22 kW in selected locations in the northeastern part of the Czech Republic. Recharging stations will be built on leased land. The project will start after the adoption of a legal act with a presumption of 2.1.2019 and will last until 31.12.2020. The aid intensity required is 70 %. The total eligible expenditure is CZK 2,195,179, excluding VAT. (English)
Property / summary: This project is aimed at expanding charging infrastructure for electric vehicles. 18 common AC charging stations will be built with a maximum output of 22 kW in selected locations in the northeastern part of the Czech Republic. Recharging stations will be built on leased land. The project will start after the adoption of a legal act with a presumption of 2.1.2019 and will last until 31.12.2020. The aid intensity required is 70 %. The total eligible expenditure is CZK 2,195,179, excluding VAT. (English) / rank
 
Normal rank
Property / summary: This project is aimed at expanding charging infrastructure for electric vehicles. 18 common AC charging stations will be built with a maximum output of 22 kW in selected locations in the northeastern part of the Czech Republic. Recharging stations will be built on leased land. The project will start after the adoption of a legal act with a presumption of 2.1.2019 and will last until 31.12.2020. The aid intensity required is 70 %. The total eligible expenditure is CZK 2,195,179, excluding VAT. (English) / qualifier
 
point in time: 23 October 2020
Timestamp+2020-10-23T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 10:38, 23 October 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Building up of an additional network of the ECKROKROZPROJKPROJECKZKZKJKZKJKZKJKZKJKZKOL@@
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    1,393,165.2 Czech koruna
    0 references
    55,726.61 Euro
    10 January 2020
    0 references
    1,990,236.0 Czech koruna
    0 references
    79,609.44 Euro
    10 January 2020
    0 references
    70 percent
    0 references
    31 December 2020
    0 references
    ELEKTRO-PROJEKCE s.r.o.
    0 references
    0 references
    0 references

    49°49'6.74"N, 18°15'47.92"E
    0 references

    49°48'34.92"N, 18°15'48.89"E
    0 references
    70300
    0 references
    Tento projekt je zaměřen na rozšíření nabíjecí infrastruktury pro vozidla na elektrický pohon. Bude vybudováno 18 běžných dobíjecích stanic typu AC s výkonem max. 22 kW ve vybraných lokalitách v severovýchodní části České republiky. Dobíjecí stanice budou vybudovány na pronajatých pozemcích. Projekt bude zahájen po vydání právního aktu s předpokladem 2.1.2019 a bude trvat do 31.12.2020. Požadovaná intenzita podpory je 70 %. Celkové způsobilé výdaje jsou 2 195 179 Kč bez DPH. (Czech)
    0 references
    This project is aimed at expanding charging infrastructure for electric vehicles. 18 common AC charging stations will be built with a maximum output of 22 kW in selected locations in the northeastern part of the Czech Republic. Recharging stations will be built on leased land. The project will start after the adoption of a legal act with a presumption of 2.1.2019 and will last until 31.12.2020. The aid intensity required is 70 %. The total eligible expenditure is CZK 2,195,179, excluding VAT. (English)
    23 October 2020
    0 references

    Identifiers

    CZ.04.2.40/0.0/0.0/16_036/0000228
    0 references