Makovice — Anti-erosion curve, sedimentation tank (Q58620): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The purpose of the project is the implementation of the measure under the specific objective 1.3.3 leading to the capture of surface run-off water from the land within the municipality of Mhozovice in the district of Kutná Hora between the road Mbezovlavovice and the central store. The parcels concerned, on which the project will build a anti-erosion ditch and a sedimentation tank with a slide system, 350/2, 641/9, 641/11 and 652/11., remove_o...)
(‎Created claim: summary (P836): The object of the project is to implement measures within the specific objective 1.3.3 leading to the capture of surface-flowing water from land in the cadastral area of the village Močovice in the district of Kutná Hora between the road Močovice – Kluky and the middle ravine. The land concerned, on which the project will build an anti-erosion ditch and a slip-through sedimentation tank are p.No. 350/2, 641/9, 641/11 and 652/11., translated_summary)
Property / summary
 
The object of the project is to implement measures within the specific objective 1.3.3 leading to the capture of surface-flowing water from land in the cadastral area of the village Močovice in the district of Kutná Hora between the road Močovice – Kluky and the middle ravine. The land concerned, on which the project will build an anti-erosion ditch and a slip-through sedimentation tank are p.No. 350/2, 641/9, 641/11 and 652/11. (English)
Property / summary: The object of the project is to implement measures within the specific objective 1.3.3 leading to the capture of surface-flowing water from land in the cadastral area of the village Močovice in the district of Kutná Hora between the road Močovice – Kluky and the middle ravine. The land concerned, on which the project will build an anti-erosion ditch and a slip-through sedimentation tank are p.No. 350/2, 641/9, 641/11 and 652/11. (English) / rank
 
Normal rank
Property / summary: The object of the project is to implement measures within the specific objective 1.3.3 leading to the capture of surface-flowing water from land in the cadastral area of the village Močovice in the district of Kutná Hora between the road Močovice – Kluky and the middle ravine. The land concerned, on which the project will build an anti-erosion ditch and a slip-through sedimentation tank are p.No. 350/2, 641/9, 641/11 and 652/11. (English) / qualifier
 
point in time: 23 October 2020
Timestamp+2020-10-23T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 10:17, 23 October 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Makovice — Anti-erosion curve, sedimentation tank
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    404,800.51 Czech koruna
    0 references
    16,192.02 Euro
    10 January 2020
    0 references
    476,235.9 Czech koruna
    0 references
    19,049.44 Euro
    10 January 2020
    0 references
    85.0 percent
    0 references
    20 September 2017
    0 references
    30 March 2020
    0 references
    Obec Močovice
    0 references
    0 references
    0 references

    49°53'18.89"N, 15°23'7.22"E
    0 references
    28601
    0 references
    Předmětem projektu je realizace opatření v rámci specifického cíle 1.3.3 vedoucího k zachycení povrchově odtékající vody z pozemků v katastrálním území obce Močovice v okrese Kutná Hora mezi silnicí Močovice - Kluky a střední strží. Dotčenými pozemky, na kterých bude v rámci projektu vybudován protierozní příkop a sedimentační nádrž se skluzem jsou p.č. 350/2, 641/9, 641/11 a 652/11. (Czech)
    0 references
    The object of the project is to implement measures within the specific objective 1.3.3 leading to the capture of surface-flowing water from land in the cadastral area of the village Močovice in the district of Kutná Hora between the road Močovice – Kluky and the middle ravine. The land concerned, on which the project will build an anti-erosion ditch and a slip-through sedimentation tank are p.No. 350/2, 641/9, 641/11 and 652/11. (English)
    23 October 2020
    0 references

    Identifiers

    CZ.05.1.24/0.0/0.0/16_045/0004601
    0 references