(‎Removed claim: summary (P836): In the context of a planned transition from steam to hot water in the East of the East and the technical condition of the original steam and a condenser medium to the customers. 2595, Ho-rantova and Apex are planned to replace the existing steam ducts from the pre-insulated pipelines. To be reconstructed 242 m from the original grass. a., remove_old_english_translation)
(‎Created claim: summary (P836): Within the planned transition from steam to hot water in the area of the East hot water and the technical condition of the original steam and condensate distribution to customers np. 2595, VS Harantova and Apex are planned to replace existing steam pipelines with hot water distributions from pre-insulated pipelines. 242 m of the original route will be reconstructed. a., translated_summary)
Property / summary
 
Within the planned transition from steam to hot water in the area of the East hot water and the technical condition of the original steam and condensate distribution to customers np. 2595, VS Harantova and Apex are planned to replace existing steam pipelines with hot water distributions from pre-insulated pipelines. 242 m of the original route will be reconstructed. a. (English)
Property / summary: Within the planned transition from steam to hot water in the area of the East hot water and the technical condition of the original steam and condensate distribution to customers np. 2595, VS Harantova and Apex are planned to replace existing steam pipelines with hot water distributions from pre-insulated pipelines. 242 m of the original route will be reconstructed. a. (English) / rank
 
Normal rank
Property / summary: Within the planned transition from steam to hot water in the area of the East hot water and the technical condition of the original steam and condensate distribution to customers np. 2595, VS Harantova and Apex are planned to replace existing steam pipelines with hot water distributions from pre-insulated pipelines. 242 m of the original route will be reconstructed. a. (English) / qualifier
 
point in time: 22 October 2020
Timestamp+2020-10-22T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 17:19, 22 October 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Hot water connection CZT objects Apex, Harantova and N. 2595 Sand
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    1,044,491.25 Czech koruna
    0 references
    41,779.65 Euro
    10 January 2020
    0 references
    2,611,228.0 Czech koruna
    0 references
    104,449.12 Euro
    10 January 2020
    0 references
    40 percent
    0 references
    29 March 2018
    0 references
    31 October 2018
    0 references
    30 November 2018
    0 references
    Teplárna Písek, a.s.
    0 references

    49°18'27.43"N, 14°9'5.47"E
    0 references

    49°19'14.09"N, 14°8'36.24"E
    0 references
    39701
    0 references
    V rámci plánovaného přechodu z páry na horkou vodu v oblasti Horkovodu Východ a technického stavu původního parního a kondenzátního rozvodu k odběratelům čp. 2595, VS Ha-rantova a Apex je plánováno nahradit stávající parovody horkovodními rozvody z předizolovaného potrubí. Rekonstruováno bude 242 m původní trasy. a. (Czech)
    0 references
    Within the planned transition from steam to hot water in the area of the East hot water and the technical condition of the original steam and condensate distribution to customers np. 2595, VS Harantova and Apex are planned to replace existing steam pipelines with hot water distributions from pre-insulated pipelines. 242 m of the original route will be reconstructed. a. (English)
    22 October 2020
    0 references

    Identifiers

    CZ.01.3.15/0.0/0.0/16_064/0011889
    0 references