Reducing the energy performance of DVD operation in Nové Syrovice (Q16953): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The project concerns the realisation of investments consisting of the insulation of peripheral walls and ceilings, including the replacement of building blocks for production sites, buoyant heating renovation including electro-installations, MAR and gas pipelines, the installation of new LED lighting and the acquisition of a new, less energy-intensive production technology. The realisation of investments leads to a reduction in the energy perf...) |
(Created claim: summary (P836): The object of the project is to realise investments consisting of insulation of perimeter walls and ceilings including replacement of building panels at the production building, radical reconstruction of heating including wiring, MaR and gas distributions, installation of new LED lighting and acquisition of new less energy-intensive production technology. The realisation of investments leads to a reduction in the energy performance of buildings...) |
||||||||||||||
Property / summary | |||||||||||||||
The object of the project is to realise investments consisting of insulation of perimeter walls and ceilings including replacement of building panels at the production building, radical reconstruction of heating including wiring, MaR and gas distributions, installation of new LED lighting and acquisition of new less energy-intensive production technology. The realisation of investments leads to a reduction in the energy performance of buildings and production technologies and to increase energy efficiency and modernisation of lighting systems of operating buildings. a. (English) | |||||||||||||||
Property / summary: The object of the project is to realise investments consisting of insulation of perimeter walls and ceilings including replacement of building panels at the production building, radical reconstruction of heating including wiring, MaR and gas distributions, installation of new LED lighting and acquisition of new less energy-intensive production technology. The realisation of investments leads to a reduction in the energy performance of buildings and production technologies and to increase energy efficiency and modernisation of lighting systems of operating buildings. a. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The object of the project is to realise investments consisting of insulation of perimeter walls and ceilings including replacement of building panels at the production building, radical reconstruction of heating including wiring, MaR and gas distributions, installation of new LED lighting and acquisition of new less energy-intensive production technology. The realisation of investments leads to a reduction in the energy performance of buildings and production technologies and to increase energy efficiency and modernisation of lighting systems of operating buildings. a. (English) / qualifier | |||||||||||||||
point in time: 22 October 2020
|
Revision as of 17:00, 22 October 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Reducing the energy performance of DVD operation in Nové Syrovice |
Project in Czech Republic financed by DG Regio |
Statements
6,947,686.59 Czech koruna
0 references
16,925,128.0 Czech koruna
0 references
41.05 percent
0 references
30 June 2020
0 references
Dřevozpracující výrobní družstvo
0 references
67551
0 references
Předmětem projektu je realizace investic, které spočívají v zateplení obvodových stěn a stropů včetně výměny stavebních výplní u výrobního objektu, razantní rekonstrukci vytápění včetně elektroinstalací, MaR a plynových rozvodů, instalaci nového LED osvětlení a pořízení nové méně energeticky náročné výrobní technologie. Realizace investic vede ke snížení energetické náročnosti budov a výrobních technologií a dále ke zvýšení energetické účinnosti a modernizaci soustav osvětlení provozních budov. a. (Czech)
0 references
The object of the project is to realise investments consisting of insulation of perimeter walls and ceilings including replacement of building panels at the production building, radical reconstruction of heating including wiring, MaR and gas distributions, installation of new LED lighting and acquisition of new less energy-intensive production technology. The realisation of investments leads to a reduction in the energy performance of buildings and production technologies and to increase energy efficiency and modernisation of lighting systems of operating buildings. a. (English)
22 October 2020
0 references
Identifiers
CZ.01.3.10/0.0/0.0/18_183/0015427
0 references