Reducing the energy performance of DVD operation in Nové Syrovice (Q16953): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The project concerns the realisation of investments consisting of the insulation of peripheral walls and ceilings, including the replacement of building blocks for production sites, buoyant heating renovation including electro-installations, MAR and gas pipelines, the installation of new LED lighting and the acquisition of a new, less energy-intensive production technology. The realisation of investments leads to a reduction in the energy perf...)
(‎Created claim: summary (P836): The object of the project is to realise investments consisting of insulation of perimeter walls and ceilings including replacement of building panels at the production building, radical reconstruction of heating including wiring, MaR and gas distributions, installation of new LED lighting and acquisition of new less energy-intensive production technology. The realisation of investments leads to a reduction in the energy performance of buildings...)
Property / summary
 
The object of the project is to realise investments consisting of insulation of perimeter walls and ceilings including replacement of building panels at the production building, radical reconstruction of heating including wiring, MaR and gas distributions, installation of new LED lighting and acquisition of new less energy-intensive production technology. The realisation of investments leads to a reduction in the energy performance of buildings and production technologies and to increase energy efficiency and modernisation of lighting systems of operating buildings. a. (English)
Property / summary: The object of the project is to realise investments consisting of insulation of perimeter walls and ceilings including replacement of building panels at the production building, radical reconstruction of heating including wiring, MaR and gas distributions, installation of new LED lighting and acquisition of new less energy-intensive production technology. The realisation of investments leads to a reduction in the energy performance of buildings and production technologies and to increase energy efficiency and modernisation of lighting systems of operating buildings. a. (English) / rank
 
Normal rank
Property / summary: The object of the project is to realise investments consisting of insulation of perimeter walls and ceilings including replacement of building panels at the production building, radical reconstruction of heating including wiring, MaR and gas distributions, installation of new LED lighting and acquisition of new less energy-intensive production technology. The realisation of investments leads to a reduction in the energy performance of buildings and production technologies and to increase energy efficiency and modernisation of lighting systems of operating buildings. a. (English) / qualifier
 
point in time: 22 October 2020
Timestamp+2020-10-22T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 17:00, 22 October 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Reducing the energy performance of DVD operation in Nové Syrovice
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    6,947,686.59 Czech koruna
    0 references
    277,907.46 Euro
    10 January 2020
    0 references
    16,925,128.0 Czech koruna
    0 references
    677,005.12 Euro
    10 January 2020
    0 references
    41.05 percent
    0 references
    30 June 2020
    0 references
    Dřevozpracující výrobní družstvo
    0 references
    0 references

    49°5'34.94"N, 15°53'27.49"E
    0 references
    67551
    0 references
    Předmětem projektu je realizace investic, které spočívají v zateplení obvodových stěn a stropů včetně výměny stavebních výplní u výrobního objektu, razantní rekonstrukci vytápění včetně elektroinstalací, MaR a plynových rozvodů, instalaci nového LED osvětlení a pořízení nové méně energeticky náročné výrobní technologie. Realizace investic vede ke snížení energetické náročnosti budov a výrobních technologií a dále ke zvýšení energetické účinnosti a modernizaci soustav osvětlení provozních budov. a. (Czech)
    0 references
    The object of the project is to realise investments consisting of insulation of perimeter walls and ceilings including replacement of building panels at the production building, radical reconstruction of heating including wiring, MaR and gas distributions, installation of new LED lighting and acquisition of new less energy-intensive production technology. The realisation of investments leads to a reduction in the energy performance of buildings and production technologies and to increase energy efficiency and modernisation of lighting systems of operating buildings. a. (English)
    22 October 2020
    0 references

    Identifiers

    CZ.01.3.10/0.0/0.0/18_183/0015427
    0 references