Photovoltaic power plant with accumulation, SERVIS Vincenci s.r.o. (Q16611): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The purpose of the project is the installation of a photovoltaic power plant, including accessories. The installation shall include the supply and installation of the following equipment: — Photovoltaic (27,54) WlipReisation of a project will significantly reduce the energy performance of the building, calculated on the energy cost in the long run, after taking into account input costs for the acquisition of the measure and the consequent redu...) |
(Created claim: summary (P836): The project is the installation of a photovoltaic power plant, including accessories. The installation will include delivery and installation of the following equipment: — photovoltaic polycrystalline panels with an output of 27,54 kWpRealisation of the project will significantly reduce the energy performance of the building, converted into energy costs in the long term after offsetting the input costs of the acquisition of the measures and the...) |
||||||||||||||
Property / summary | |||||||||||||||
The project is the installation of a photovoltaic power plant, including accessories. The installation will include delivery and installation of the following equipment: — photovoltaic polycrystalline panels with an output of 27,54 kWpRealisation of the project will significantly reduce the energy performance of the building, converted into energy costs in the long term after offsetting the input costs of the acquisition of the measures and the subsequent reduced consumption from the network. a. (English) | |||||||||||||||
Property / summary: The project is the installation of a photovoltaic power plant, including accessories. The installation will include delivery and installation of the following equipment: — photovoltaic polycrystalline panels with an output of 27,54 kWpRealisation of the project will significantly reduce the energy performance of the building, converted into energy costs in the long term after offsetting the input costs of the acquisition of the measures and the subsequent reduced consumption from the network. a. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The project is the installation of a photovoltaic power plant, including accessories. The installation will include delivery and installation of the following equipment: — photovoltaic polycrystalline panels with an output of 27,54 kWpRealisation of the project will significantly reduce the energy performance of the building, converted into energy costs in the long term after offsetting the input costs of the acquisition of the measures and the subsequent reduced consumption from the network. a. (English) / qualifier | |||||||||||||||
point in time: 22 October 2020
|
Revision as of 16:41, 22 October 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Photovoltaic power plant with accumulation, SERVIS Vincenci s.r.o. |
Project in Czech Republic financed by DG Regio |
Statements
1,380,211.19 Czech koruna
0 references
1,725,264.0 Czech koruna
0 references
80.0 percent
0 references
3 October 2018
0 references
14 March 2019
0 references
30 June 2019
0 references
SERVIS VINCENCI s.r.o.
0 references
53973
0 references
Předmětem projekt je instalace fotovoltaické elektrárny včetně příslušenství. Součástí instalace bude dodávka a montáž těchto zařízení: - fotovoltaické polykrystalické panely o výkonu 27,54 kWpRealizací projektu dojde k významnému snížení energetické náročnosti budovy, přepočteno na náklady na energie v dlouhodobém horizontu po započtení vstupních nákladů na pořízení daných opatření a následného snížené odběru ze sítě. a. (Czech)
0 references
The project is the installation of a photovoltaic power plant, including accessories. The installation will include delivery and installation of the following equipment: — photovoltaic polycrystalline panels with an output of 27,54 kWpRealisation of the project will significantly reduce the energy performance of the building, converted into energy costs in the long term after offsetting the input costs of the acquisition of the measures and the subsequent reduced consumption from the network. a. (English)
22 October 2020
0 references
Identifiers
CZ.01.3.10/0.0/0.0/17_138/0011585
0 references