Construction of biomass resources in the area of Infini a.s. (Q16567): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): A new source of thermal energy will be built on the site, consisting of biomass on a ground space of 6,2 x 4.2 m. the hot spot is adjacent to one of the reconstructed halls and will be made of steel profiles made of sandwich panels of sandwich panels. A total of 2 boilers for heat output 1 x 110 kW and 1 x 150 kWDH for combustion gases will be installed in discharge heaters using two prefabricated stainless steels with insulation of 250 mm. a....) |
(Created claim: summary (P836): A new source of heat energy will be built in the area, namely a biomass heating plant with ground plan dimensions of 6.2 x 4.2 m. This heating plant will be adjacent to one of the reconstructed halls and will be made of steel profiles covered with sandwich panels with insulation. A total of 2 boilers with a heat output of 1x 110 kW and 1x 150 kW will be installed in the furnace.The exhaust gas pipeline will provide two prefabricated stainless st...) |
||||||||||||||
Property / summary | |||||||||||||||
A new source of heat energy will be built in the area, namely a biomass heating plant with ground plan dimensions of 6.2 x 4.2 m. This heating plant will be adjacent to one of the reconstructed halls and will be made of steel profiles covered with sandwich panels with insulation. A total of 2 boilers with a heat output of 1x 110 kW and 1x 150 kW will be installed in the furnace.The exhaust gas pipeline will provide two prefabricated stainless steel flue pipelines with 250 mm insulated insulation. (English) | |||||||||||||||
Property / summary: A new source of heat energy will be built in the area, namely a biomass heating plant with ground plan dimensions of 6.2 x 4.2 m. This heating plant will be adjacent to one of the reconstructed halls and will be made of steel profiles covered with sandwich panels with insulation. A total of 2 boilers with a heat output of 1x 110 kW and 1x 150 kW will be installed in the furnace.The exhaust gas pipeline will provide two prefabricated stainless steel flue pipelines with 250 mm insulated insulation. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: A new source of heat energy will be built in the area, namely a biomass heating plant with ground plan dimensions of 6.2 x 4.2 m. This heating plant will be adjacent to one of the reconstructed halls and will be made of steel profiles covered with sandwich panels with insulation. A total of 2 boilers with a heat output of 1x 110 kW and 1x 150 kW will be installed in the furnace.The exhaust gas pipeline will provide two prefabricated stainless steel flue pipelines with 250 mm insulated insulation. (English) / qualifier | |||||||||||||||
point in time: 22 October 2020
|
Revision as of 16:41, 22 October 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Construction of biomass resources in the area of Infini a.s. |
Project in Czech Republic financed by DG Regio |
Statements
2,366,131.6 Czech koruna
0 references
5,915,329.0 Czech koruna
0 references
40 percent
0 references
30 April 2018
0 references
10 March 2021
0 references
Infini a.s.
0 references
79501
0 references
V areálu bude vybudován nový zdroj tepelné energie, a to výtopna na biomasu o půdorysných rozměrech 6,2 x 4,2 m. Tato výtopna bude přiléhat k jedné z rekonstruovaných hal a bude zhotovena z ocelových profilů opláštěná sendvičovými panely s izolací. Ve výtopně budou instalovány celkem 2 kotle o tepelném výkonu 1x 110 kW a 1x 150 kWOdvod spalin budou zajišťovat dva prefabrikované nerezové kouřovody s izolací o průměru 250mm. a. (Czech)
0 references
A new source of heat energy will be built in the area, namely a biomass heating plant with ground plan dimensions of 6.2 x 4.2 m. This heating plant will be adjacent to one of the reconstructed halls and will be made of steel profiles covered with sandwich panels with insulation. A total of 2 boilers with a heat output of 1x 110 kW and 1x 150 kW will be installed in the furnace.The exhaust gas pipeline will provide two prefabricated stainless steel flue pipelines with 250 mm insulated insulation. (English)
22 October 2020
0 references
Identifiers
CZ.01.3.10/0.0/0.0/17_101/0014172
0 references