(Removed claim: summary (P836): The project aimed at reducing the energy dependency of the business operator. Within the scope of the project, the photovoltaic power plant for its own use of the branch of the Povodí Vltavy in the municipality of Mirleov is being absorbed. The FVE is designed as a renewable resource to reduce the actual consumption of the establishment from the distribution network. The proposed FVE is composed of 100 units of solar panels with a total instal...) |
(Created claim: summary (P836): The scope of the project aimed at reducing the energy dependence of the business entity. Within the scope of this project, a photovoltaic power plant for own consumption is closed on the premises of the Povodí Vltava branch in the municipality of Milešov. FVE is designed as a renewable resource to reduce the own consumption of an establishment from the distribution network. The proposed FVE consists of 100 solar panels with total installed power...) |
||||||||||||||
Property / summary | |||||||||||||||
The scope of the project aimed at reducing the energy dependence of the business entity. Within the scope of this project, a photovoltaic power plant for own consumption is closed on the premises of the Povodí Vltava branch in the municipality of Milešov. FVE is designed as a renewable resource to reduce the own consumption of an establishment from the distribution network. The proposed FVE consists of 100 solar panels with total installed power plant output is 27 kWp. a. (English) | |||||||||||||||
Property / summary: The scope of the project aimed at reducing the energy dependence of the business entity. Within the scope of this project, a photovoltaic power plant for own consumption is closed on the premises of the Povodí Vltava branch in the municipality of Milešov. FVE is designed as a renewable resource to reduce the own consumption of an establishment from the distribution network. The proposed FVE consists of 100 solar panels with total installed power plant output is 27 kWp. a. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The scope of the project aimed at reducing the energy dependence of the business entity. Within the scope of this project, a photovoltaic power plant for own consumption is closed on the premises of the Povodí Vltava branch in the municipality of Milešov. FVE is designed as a renewable resource to reduce the own consumption of an establishment from the distribution network. The proposed FVE consists of 100 solar panels with total installed power plant output is 27 kWp. a. (English) / qualifier | |||||||||||||||
point in time: 22 October 2020
|
Revision as of 16:38, 22 October 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | FVE Water catchment area Vltava Orlík |
Project in Czech Republic financed by DG Regio |
Statements
408,153.0 Czech koruna
0 references
680,254.99 Czech koruna
0 references
60.0 percent
0 references
31 December 2019
0 references
Povodí Vltavy, státní podnik
0 references
15000
0 references
Náplní projektu zaměřeného na snížení energetické závislosti podnikatelského subjektu. V rozsahu tohoto projektu je navřena fotovoltaická elektrárna pro vlastní spotřebuv areálu pobočky Povodí Vltavy v obci Milešov. FVE je navržena jako obnovitelný zdroj pro snížení vlastní spotřeby provozovny z distribuční sítě. Navržená FVE je tvořena 100 ks solárních panelů o celkovém instalovaném výkon elektrárny je 27 kWp. a. (Czech)
0 references
The scope of the project aimed at reducing the energy dependence of the business entity. Within the scope of this project, a photovoltaic power plant for own consumption is closed on the premises of the Povodí Vltava branch in the municipality of Milešov. FVE is designed as a renewable resource to reduce the own consumption of an establishment from the distribution network. The proposed FVE consists of 100 solar panels with total installed power plant output is 27 kWp. a. (English)