Expanding the capacity of the boiler room to biomass (Q15343): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The subject of the present project is the extension of an existing biomass boiler with an installed capacity of 3.0 MW for a new biomass source, or an extension of the power of the entire connected SZTE, for which additional resources placed outside the boiler room on biomass are used.A new power source of 0.8 MW will be used as the primary source to be used throughout the year as much as possible, thereby increasing the efficiency of the GTTE...)
(‎Created claim: summary (P836): The subject of the submitted project is the extension of the existing boiler room to biomass with installed capacity of 3.0 MW by a new biomass source, or an extension of the power of the connected SZTE, for which other sources located outside the biomass boiler room are used.The new 0.8 MW power source will serve as the primary source used year-round to the maximum possible extent, thereby increasing the efficiency of CZTE by reducing the use o...)
Property / summary
 
The subject of the submitted project is the extension of the existing boiler room to biomass with installed capacity of 3.0 MW by a new biomass source, or an extension of the power of the connected SZTE, for which other sources located outside the biomass boiler room are used.The new 0.8 MW power source will serve as the primary source used year-round to the maximum possible extent, thereby increasing the efficiency of CZTE by reducing the use of less efficient sources, a decrease in energy consumption by 0.8 % and operating costs by 6.4 % and reductions in emissions. a. (English)
Property / summary: The subject of the submitted project is the extension of the existing boiler room to biomass with installed capacity of 3.0 MW by a new biomass source, or an extension of the power of the connected SZTE, for which other sources located outside the biomass boiler room are used.The new 0.8 MW power source will serve as the primary source used year-round to the maximum possible extent, thereby increasing the efficiency of CZTE by reducing the use of less efficient sources, a decrease in energy consumption by 0.8 % and operating costs by 6.4 % and reductions in emissions. a. (English) / rank
 
Normal rank
Property / summary: The subject of the submitted project is the extension of the existing boiler room to biomass with installed capacity of 3.0 MW by a new biomass source, or an extension of the power of the connected SZTE, for which other sources located outside the biomass boiler room are used.The new 0.8 MW power source will serve as the primary source used year-round to the maximum possible extent, thereby increasing the efficiency of CZTE by reducing the use of less efficient sources, a decrease in energy consumption by 0.8 % and operating costs by 6.4 % and reductions in emissions. a. (English) / qualifier
 
point in time: 22 October 2020
Timestamp+2020-10-22T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 16:36, 22 October 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Expanding the capacity of the boiler room to biomass
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    8,254,200.0 Czech koruna
    0 references
    330,168.0 Euro
    10 January 2020
    0 references
    13,757,000.0 Czech koruna
    0 references
    550,280.0 Euro
    10 January 2020
    0 references
    60 percent
    0 references
    31 December 2019
    0 references
    Energie AG Teplo Vimperk s.r.o.
    0 references
    0 references

    49°3'1.26"N, 13°45'59.90"E
    0 references
    38501
    0 references
    Předmětem předkládaného projektu je rozšíření stávající kotelny na biomasu s instalovaným výkonem 3,0 MW o nový zdroj na biomasu, resp. rozšíření výkonu celé propojené SZTE, pro kterou slouží další zdroje umístěné mimo kotelnu na biomasu. Nový zdroj o výkonu 0,8 MW bude sloužit jako primární zdroj používaný celoročně v maximální možné míře, čímž dojde ke zvýšení účinnosti SZTE snížením využití méně účinných zdrojů, poklesu spotřeby energie o 0,8 % a provozních nákladů o 6,4 % a snížení emisí. a. (Czech)
    0 references
    The subject of the submitted project is the extension of the existing boiler room to biomass with installed capacity of 3.0 MW by a new biomass source, or an extension of the power of the connected SZTE, for which other sources located outside the biomass boiler room are used.The new 0.8 MW power source will serve as the primary source used year-round to the maximum possible extent, thereby increasing the efficiency of CZTE by reducing the use of less efficient sources, a decrease in energy consumption by 0.8 % and operating costs by 6.4 % and reductions in emissions. a. (English)
    22 October 2020
    0 references

    Identifiers

    CZ.01.3.09/0.0/0.0/16_130/0011069
    0 references