Expanding the capacity of the boiler room to biomass (Q15343): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The subject of the present project is the extension of an existing biomass boiler with an installed capacity of 3.0 MW for a new biomass source, or an extension of the power of the entire connected SZTE, for which additional resources placed outside the boiler room on biomass are used.A new power source of 0.8 MW will be used as the primary source to be used throughout the year as much as possible, thereby increasing the efficiency of the GTTE...) |
(Created claim: summary (P836): The subject of the submitted project is the extension of the existing boiler room to biomass with installed capacity of 3.0 MW by a new biomass source, or an extension of the power of the connected SZTE, for which other sources located outside the biomass boiler room are used.The new 0.8 MW power source will serve as the primary source used year-round to the maximum possible extent, thereby increasing the efficiency of CZTE by reducing the use o...) |
||||||||||||||
Property / summary | |||||||||||||||
The subject of the submitted project is the extension of the existing boiler room to biomass with installed capacity of 3.0 MW by a new biomass source, or an extension of the power of the connected SZTE, for which other sources located outside the biomass boiler room are used.The new 0.8 MW power source will serve as the primary source used year-round to the maximum possible extent, thereby increasing the efficiency of CZTE by reducing the use of less efficient sources, a decrease in energy consumption by 0.8 % and operating costs by 6.4 % and reductions in emissions. a. (English) | |||||||||||||||
Property / summary: The subject of the submitted project is the extension of the existing boiler room to biomass with installed capacity of 3.0 MW by a new biomass source, or an extension of the power of the connected SZTE, for which other sources located outside the biomass boiler room are used.The new 0.8 MW power source will serve as the primary source used year-round to the maximum possible extent, thereby increasing the efficiency of CZTE by reducing the use of less efficient sources, a decrease in energy consumption by 0.8 % and operating costs by 6.4 % and reductions in emissions. a. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The subject of the submitted project is the extension of the existing boiler room to biomass with installed capacity of 3.0 MW by a new biomass source, or an extension of the power of the connected SZTE, for which other sources located outside the biomass boiler room are used.The new 0.8 MW power source will serve as the primary source used year-round to the maximum possible extent, thereby increasing the efficiency of CZTE by reducing the use of less efficient sources, a decrease in energy consumption by 0.8 % and operating costs by 6.4 % and reductions in emissions. a. (English) / qualifier | |||||||||||||||
point in time: 22 October 2020
|
Revision as of 16:36, 22 October 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Expanding the capacity of the boiler room to biomass |
Project in Czech Republic financed by DG Regio |
Statements
8,254,200.0 Czech koruna
0 references
13,757,000.0 Czech koruna
0 references
60 percent
0 references
31 December 2019
0 references
Energie AG Teplo Vimperk s.r.o.
0 references
38501
0 references
Předmětem předkládaného projektu je rozšíření stávající kotelny na biomasu s instalovaným výkonem 3,0 MW o nový zdroj na biomasu, resp. rozšíření výkonu celé propojené SZTE, pro kterou slouží další zdroje umístěné mimo kotelnu na biomasu. Nový zdroj o výkonu 0,8 MW bude sloužit jako primární zdroj používaný celoročně v maximální možné míře, čímž dojde ke zvýšení účinnosti SZTE snížením využití méně účinných zdrojů, poklesu spotřeby energie o 0,8 % a provozních nákladů o 6,4 % a snížení emisí. a. (Czech)
0 references
The subject of the submitted project is the extension of the existing boiler room to biomass with installed capacity of 3.0 MW by a new biomass source, or an extension of the power of the connected SZTE, for which other sources located outside the biomass boiler room are used.The new 0.8 MW power source will serve as the primary source used year-round to the maximum possible extent, thereby increasing the efficiency of CZTE by reducing the use of less efficient sources, a decrease in energy consumption by 0.8 % and operating costs by 6.4 % and reductions in emissions. a. (English)
22 October 2020