Energy savings in the processes of GKR Founding s.r.o. I (Q16389): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The project aims at achieving energy savings in the processes of GKR Zaklotion s.r.o., which will be realised by replacing the existing well system with new machinery. This replacement of machinery will reduce fuel consumption and achieve more stringent emissions limits. At the same time, a new drilling rig has improved technical specifications., remove_old_english_translation)
(‎Created claim: summary (P836): The object of the project is to achieve energy savings in the processes of GKR Founding s.r.o., which will be realised thanks to the replacement of the existing drilling system for new machinery. This replacement of machinery will reduce fuel consumption and stricter emission limits. At the same time, the new drilling rig has better technical parameters. a., translated_summary)
Property / summary
 
The object of the project is to achieve energy savings in the processes of GKR Founding s.r.o., which will be realised thanks to the replacement of the existing drilling system for new machinery. This replacement of machinery will reduce fuel consumption and stricter emission limits. At the same time, the new drilling rig has better technical parameters. a. (English)
Property / summary: The object of the project is to achieve energy savings in the processes of GKR Founding s.r.o., which will be realised thanks to the replacement of the existing drilling system for new machinery. This replacement of machinery will reduce fuel consumption and stricter emission limits. At the same time, the new drilling rig has better technical parameters. a. (English) / rank
 
Normal rank
Property / summary: The object of the project is to achieve energy savings in the processes of GKR Founding s.r.o., which will be realised thanks to the replacement of the existing drilling system for new machinery. This replacement of machinery will reduce fuel consumption and stricter emission limits. At the same time, the new drilling rig has better technical parameters. a. (English) / qualifier
 
point in time: 22 October 2020
Timestamp+2020-10-22T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 16:34, 22 October 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Energy savings in the processes of GKR Founding s.r.o. I
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    9,914,800.0 Czech koruna
    0 references
    396,592.0 Euro
    10 January 2020
    0 references
    24,787,000.0 Czech koruna
    0 references
    991,480.0 Euro
    10 January 2020
    0 references
    40 percent
    0 references
    30 September 2019
    0 references
    GRANSON s.r.o.
    0 references
    0 references

    50°31'49.08"N, 14°6'22.72"E
    0 references

    50°32'18.42"N, 14°8'44.81"E
    0 references
    41201
    0 references
    Předmětem projektu je dosažení energetických úspor v procesech společnosti GKR Zakládání s.r.o., které budou realizovány díky výměně stávající vrtné soustavy za nové strojní zařízení. Díky této obměně strojního zařízení dojde ke snížení spotřeby paliv a dosažení přísnějších emisních limitů. Zároveň nová vrtná souprava disponuje lepšími technickými parametry. a. (Czech)
    0 references
    The object of the project is to achieve energy savings in the processes of GKR Founding s.r.o., which will be realised thanks to the replacement of the existing drilling system for new machinery. This replacement of machinery will reduce fuel consumption and stricter emission limits. At the same time, the new drilling rig has better technical parameters. a. (English)
    22 October 2020
    0 references

    Identifiers

    CZ.01.3.10/0.0/0.0/17_101/0013641
    0 references