Energy savings in the processes of GKR Founding s.r.o. I (Q16389): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The project aims at achieving energy savings in the processes of GKR Zaklotion s.r.o., which will be realised by replacing the existing well system with new machinery. This replacement of machinery will reduce fuel consumption and achieve more stringent emissions limits. At the same time, a new drilling rig has improved technical specifications., remove_old_english_translation) |
(Created claim: summary (P836): The object of the project is to achieve energy savings in the processes of GKR Founding s.r.o., which will be realised thanks to the replacement of the existing drilling system for new machinery. This replacement of machinery will reduce fuel consumption and stricter emission limits. At the same time, the new drilling rig has better technical parameters. a., translated_summary) |
||||||||||||||
Property / summary | |||||||||||||||
The object of the project is to achieve energy savings in the processes of GKR Founding s.r.o., which will be realised thanks to the replacement of the existing drilling system for new machinery. This replacement of machinery will reduce fuel consumption and stricter emission limits. At the same time, the new drilling rig has better technical parameters. a. (English) | |||||||||||||||
Property / summary: The object of the project is to achieve energy savings in the processes of GKR Founding s.r.o., which will be realised thanks to the replacement of the existing drilling system for new machinery. This replacement of machinery will reduce fuel consumption and stricter emission limits. At the same time, the new drilling rig has better technical parameters. a. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The object of the project is to achieve energy savings in the processes of GKR Founding s.r.o., which will be realised thanks to the replacement of the existing drilling system for new machinery. This replacement of machinery will reduce fuel consumption and stricter emission limits. At the same time, the new drilling rig has better technical parameters. a. (English) / qualifier | |||||||||||||||
point in time: 22 October 2020
|
Revision as of 16:34, 22 October 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Energy savings in the processes of GKR Founding s.r.o. I |
Project in Czech Republic financed by DG Regio |
Statements
9,914,800.0 Czech koruna
0 references
24,787,000.0 Czech koruna
0 references
40 percent
0 references
30 September 2019
0 references
GRANSON s.r.o.
0 references
41201
0 references
Předmětem projektu je dosažení energetických úspor v procesech společnosti GKR Zakládání s.r.o., které budou realizovány díky výměně stávající vrtné soustavy za nové strojní zařízení. Díky této obměně strojního zařízení dojde ke snížení spotřeby paliv a dosažení přísnějších emisních limitů. Zároveň nová vrtná souprava disponuje lepšími technickými parametry. a. (Czech)
0 references
The object of the project is to achieve energy savings in the processes of GKR Founding s.r.o., which will be realised thanks to the replacement of the existing drilling system for new machinery. This replacement of machinery will reduce fuel consumption and stricter emission limits. At the same time, the new drilling rig has better technical parameters. a. (English)
22 October 2020
0 references
Identifiers
CZ.01.3.10/0.0/0.0/17_101/0013641
0 references