Energy measures in Amirro (Q15822): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The CZ NACE 23.1 project aims at reducing the energy intensity of the building, which is located at the address of Křijekkova 1859 — České Budějovice and is owned by the applicant for the grant to Amirro s.r.o. The project is a building for production and partly as an administrative background for staff. The project will serve the insulation of the building, the replacement of the selector, or the modernisation of heating and lighting. In addi...) |
(Created claim: summary (P836): The project under CZ NACE 23.1 aims to reduce the energy performance of the building located at Křižíkova 1859 – Čelákovice and is owned by the applicant for the subsidy of Amirro s.r.o. The object of the project is a building that serves for production and partly as administrative facilities for employees. The project will include insulation of the building, replacement of hole fillings or modernisation of heating and lighting. In addition to s...) |
||||||||||||||
Property / summary | |||||||||||||||
The project under CZ NACE 23.1 aims to reduce the energy performance of the building located at Křižíkova 1859 – Čelákovice and is owned by the applicant for the subsidy of Amirro s.r.o. The object of the project is a building that serves for production and partly as administrative facilities for employees. The project will include insulation of the building, replacement of hole fillings or modernisation of heating and lighting. In addition to saving, there will also be financial savings for energy. a. (English) | |||||||||||||||
Property / summary: The project under CZ NACE 23.1 aims to reduce the energy performance of the building located at Křižíkova 1859 – Čelákovice and is owned by the applicant for the subsidy of Amirro s.r.o. The object of the project is a building that serves for production and partly as administrative facilities for employees. The project will include insulation of the building, replacement of hole fillings or modernisation of heating and lighting. In addition to saving, there will also be financial savings for energy. a. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The project under CZ NACE 23.1 aims to reduce the energy performance of the building located at Křižíkova 1859 – Čelákovice and is owned by the applicant for the subsidy of Amirro s.r.o. The object of the project is a building that serves for production and partly as administrative facilities for employees. The project will include insulation of the building, replacement of hole fillings or modernisation of heating and lighting. In addition to saving, there will also be financial savings for energy. a. (English) / qualifier | |||||||||||||||
point in time: 22 October 2020
|
Revision as of 16:25, 22 October 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Energy measures in Amirro |
Project in Czech Republic financed by DG Regio |
Statements
7,938,170.43 Czech koruna
0 references
19,845,426.08 Czech koruna
0 references
40.0 percent
0 references
18 April 2018
0 references
31 December 2019
0 references
AMIRRO, s.r.o.
0 references
25088
0 references
Projekt v rámci CZ NACE 23.1 je zaměřen na snížení energetické náročnosti objektu, který se nachází na adrese Křižíkova 1859 - Čelákovice a je ve vlastnictví žadatele o dotaci společnosti Amirro s.r.o. Předmětem projektu je budova, která slouží pro výrobu a částečně jako administrativní zázemí zaměstnanců. V rámci projektu proběhne zateplení objektu, výměna otvorových výplní či modernizace vytápění a osvětlení. Kromě úspory KSE dojde také k finanční úspoře za energie. a. (Czech)
0 references
The project under CZ NACE 23.1 aims to reduce the energy performance of the building located at Křižíkova 1859 – Čelákovice and is owned by the applicant for the subsidy of Amirro s.r.o. The object of the project is a building that serves for production and partly as administrative facilities for employees. The project will include insulation of the building, replacement of hole fillings or modernisation of heating and lighting. In addition to saving, there will also be financial savings for energy. a. (English)
22 October 2020
0 references
Identifiers
CZ.01.3.10/0.0/0.0/16_061/0009985
0 references