Reducing the energy intensity of the production of KOPOS KOLIN (Q15780): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The purpose of the project is to ensure, on the one hand, the efficient, ecological and energy saving of the production process of KOPOS Cologne (the relevant parts of the production technologies), with the simultaneous reduction of thermal loss of the production site, on the one hand, to ensure savings in electricity consumption by the installation of energy-saving light sources and the introduction of water heating through the use of renewab...) |
(Created claim: summary (P836): The object of the project is to ensure both an efficient, ecological and energy-saving production process of KOPOS KOLÍN (the parts of production technologies concerned) with the current reduction of the thermal losses of the production building by its insulation, and ensuring savings in electricity consumption by installing energy-saving lamps and introducing water heating through the use of renewable energy sources. The project will be impleme...) |
||||||||||||||
Property / summary | |||||||||||||||
The object of the project is to ensure both an efficient, ecological and energy-saving production process of KOPOS KOLÍN (the parts of production technologies concerned) with the current reduction of the thermal losses of the production building by its insulation, and ensuring savings in electricity consumption by installing energy-saving lamps and introducing water heating through the use of renewable energy sources. The project will be implemented from 1. 8. 2017 to 30. 12. 2019 competent project team. a. (English) | |||||||||||||||
Property / summary: The object of the project is to ensure both an efficient, ecological and energy-saving production process of KOPOS KOLÍN (the parts of production technologies concerned) with the current reduction of the thermal losses of the production building by its insulation, and ensuring savings in electricity consumption by installing energy-saving lamps and introducing water heating through the use of renewable energy sources. The project will be implemented from 1. 8. 2017 to 30. 12. 2019 competent project team. a. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The object of the project is to ensure both an efficient, ecological and energy-saving production process of KOPOS KOLÍN (the parts of production technologies concerned) with the current reduction of the thermal losses of the production building by its insulation, and ensuring savings in electricity consumption by installing energy-saving lamps and introducing water heating through the use of renewable energy sources. The project will be implemented from 1. 8. 2017 to 30. 12. 2019 competent project team. a. (English) / qualifier | |||||||||||||||
point in time: 22 October 2020
|
Revision as of 16:24, 22 October 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Reducing the energy intensity of the production of KOPOS KOLIN |
Project in Czech Republic financed by DG Regio |
Statements
16,546,089.3 Czech koruna
0 references
55,153,631.0 Czech koruna
0 references
30 percent
0 references
31 January 2017
0 references
31 December 2018
0 references
31 March 2019
0 references
KOPOS KOLÍN a.s.
0 references
28002
0 references
Předmětem projektu je zajištění jednak účinného, ekologického a energeticky úsporného výrobního procesu společnosti KOPOS KOLÍN (dotčené části výrobních technologií) se současným omezením tepelných ztrát výrobního objektu jeho zateplením, jednak zajištění úspor spotřeby elektrické energie instalací úsporných světelných zdrojů a zavedení ohřevu vody prostřednictvím využití obnovitelných zdrojů energie. Projekt bude realizován od 1. 8. 2017 do 30. 12. 2019 kompetentním projektovým týmem. a. (Czech)
0 references
The object of the project is to ensure both an efficient, ecological and energy-saving production process of KOPOS KOLÍN (the parts of production technologies concerned) with the current reduction of the thermal losses of the production building by its insulation, and ensuring savings in electricity consumption by installing energy-saving lamps and introducing water heating through the use of renewable energy sources. The project will be implemented from 1. 8. 2017 to 30. 12. 2019 competent project team. a. (English)
22 October 2020
0 references
Identifiers
CZ.01.3.10/0.0/0.0/16_061/0009028
0 references