Energy Savings March 4809 (Q16007): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The project aims to reconstruct the premises of the Březenecká Č.p. 4809 and the construction of the former sauna for p.č.4865/94, cadastral district. Chomutov, and a reduction in their energy performance. By improving the thermal characteristics of the envelope of the building and closing holes, the reconstruction of the electrical and lighting distribution, the building will be brought into operation in the required energy standard, cost red...)
(‎Created claim: summary (P836): The aim of the project is the reconstruction of the buildings Březenecká č.p.4809 and the construction of the former sauna on p.no.4865/94, k.ú. Chomutov, and reducing their energy performance. By improving the thermally technical properties of the building envelope and filling of openings, reconstruction of electrical distributions and lighting, the building will be put into operation in the required energy standard, reduced costs, increased co...)
Property / summary
 
The aim of the project is the reconstruction of the buildings Březenecká č.p.4809 and the construction of the former sauna on p.no.4865/94, k.ú. Chomutov, and reducing their energy performance. By improving the thermally technical properties of the building envelope and filling of openings, reconstruction of electrical distributions and lighting, the building will be put into operation in the required energy standard, reduced costs, increased competitiveness and utility value. (English)
Property / summary: The aim of the project is the reconstruction of the buildings Březenecká č.p.4809 and the construction of the former sauna on p.no.4865/94, k.ú. Chomutov, and reducing their energy performance. By improving the thermally technical properties of the building envelope and filling of openings, reconstruction of electrical distributions and lighting, the building will be put into operation in the required energy standard, reduced costs, increased competitiveness and utility value. (English) / rank
 
Normal rank
Property / summary: The aim of the project is the reconstruction of the buildings Březenecká č.p.4809 and the construction of the former sauna on p.no.4865/94, k.ú. Chomutov, and reducing their energy performance. By improving the thermally technical properties of the building envelope and filling of openings, reconstruction of electrical distributions and lighting, the building will be put into operation in the required energy standard, reduced costs, increased competitiveness and utility value. (English) / qualifier
 
point in time: 22 October 2020
Timestamp+2020-10-22T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 16:19, 22 October 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Energy Savings March 4809
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    2,502,901.0 Czech koruna
    0 references
    100,116.04 Euro
    10 January 2020
    0 references
    5,005,802.0 Czech koruna
    0 references
    200,232.08 Euro
    10 January 2020
    0 references
    50 percent
    0 references
    1 July 2018
    0 references
    31 December 2019
    0 references
    RETION s.r.o.
    0 references
    0 references

    50°28'58.87"N, 13°25'34.97"E
    0 references
    43004
    0 references
    Cílem projektu je rekonstrukce objektů Březenecká č.p.4809 a stavby bývalé sauny na p.č.4865/94, k.ú. Chomutov, a snížení jejich energetické náročnosti. Zlepšením tepelně technických vlastností obálky budovy a výplně otvorů, rekonstrukcí rozvodů elektro a osvětlení dojde ke zprovoznění budovy v požadovaném energetickém standardu, snížení nákladů, zvýšení konkurenceschopnosti a užitné hodnoty. a. (Czech)
    0 references
    The aim of the project is the reconstruction of the buildings Březenecká č.p.4809 and the construction of the former sauna on p.no.4865/94, k.ú. Chomutov, and reducing their energy performance. By improving the thermally technical properties of the building envelope and filling of openings, reconstruction of electrical distributions and lighting, the building will be put into operation in the required energy standard, reduced costs, increased competitiveness and utility value. (English)
    22 October 2020
    0 references

    Identifiers

    CZ.01.3.10/0.0/0.0/16_061/0011846
    0 references