Modernisation and reconstruction of heat source including related gas and heat distribution in the company of Krkonoše limestone Kunčice, a.s., operation Kunčice nad Labem (Q15577): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): Reducing energy intensity and improving heating efficiency by implementing decentralisation of heating. The project includes the disposal of existing inefficient central coal boilers and their replacement with low pressure advanced natural gas boilers in individual buildings, the elimination of the loss-making outdoor distribution of the tepl.Úspopora of energy of around 2 200 GJ/year. Investment cost (eligible expenditure) of approximately 6 ...)
(‎Created claim: summary (P836): Reducing energy performance and increasing heating efficiency through decentralisation of heating. Part of the project is the liquidation of existing inefficient central coal boilers and their replacement by low-pressure modern natural gas boilers in individual buildings, disposing of loss-making outdoor heat distributions.Energy savings ca 2 200 GJ/year. Investment cost (eligible expenditure) approx. 6 000 000,- CZK. a., translated_summary)
Property / summary
 
Reducing energy performance and increasing heating efficiency through decentralisation of heating. Part of the project is the liquidation of existing inefficient central coal boilers and their replacement by low-pressure modern natural gas boilers in individual buildings, disposing of loss-making outdoor heat distributions.Energy savings ca 2 200 GJ/year. Investment cost (eligible expenditure) approx. 6 000 000,- CZK. a. (English)
Property / summary: Reducing energy performance and increasing heating efficiency through decentralisation of heating. Part of the project is the liquidation of existing inefficient central coal boilers and their replacement by low-pressure modern natural gas boilers in individual buildings, disposing of loss-making outdoor heat distributions.Energy savings ca 2 200 GJ/year. Investment cost (eligible expenditure) approx. 6 000 000,- CZK. a. (English) / rank
 
Normal rank
Property / summary: Reducing energy performance and increasing heating efficiency through decentralisation of heating. Part of the project is the liquidation of existing inefficient central coal boilers and their replacement by low-pressure modern natural gas boilers in individual buildings, disposing of loss-making outdoor heat distributions.Energy savings ca 2 200 GJ/year. Investment cost (eligible expenditure) approx. 6 000 000,- CZK. a. (English) / qualifier
 
point in time: 22 October 2020
Timestamp+2020-10-22T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 16:15, 22 October 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Modernisation and reconstruction of heat source including related gas and heat distribution in the company of Krkonoše limestone Kunčice, a.s., operation Kunčice nad Labem
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    1,798,550.7 Czech koruna
    0 references
    71,942.03 Euro
    10 January 2020
    0 references
    5,995,169.0 Czech koruna
    0 references
    239,806.76 Euro
    10 January 2020
    0 references
    30 percent
    0 references
    1 December 2015
    0 references
    19 September 2017
    0 references
    31 October 2017
    0 references
    Krkonošské vápenky Kunčice , a.s.
    0 references

    50°32'21.98"N, 15°42'35.71"E
    0 references
    54371
    0 references
    Snížení energetické náročnosti a zvýšení účinnosti vytápění realizací decentralizace vytápění. Součástí projektu je likvidace stávajících neefektivních centrálních kotlů na uhlí a jejich nahrazení nízkotlakými moderními kotli na zemní plyn v jednotlivých budovách, likvidace ztrátových venkovních rozvodů tepla.Úspora energie cca 2 200 GJ/rok. Investiční náklad (způsobilé výdaje) cca 6 000 000,- Kč. a. (Czech)
    0 references
    Reducing energy performance and increasing heating efficiency through decentralisation of heating. Part of the project is the liquidation of existing inefficient central coal boilers and their replacement by low-pressure modern natural gas boilers in individual buildings, disposing of loss-making outdoor heat distributions.Energy savings ca 2 200 GJ/year. Investment cost (eligible expenditure) approx. 6 000 000,- CZK. a. (English)
    22 October 2020
    0 references

    Identifiers

    CZ.01.3.10/0.0/0.0/15_010/0002122
    0 references