Reduction of energy performance of the object COOP Discount Rabbit (Q15446): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The salon of COOP Disclose is currently in unsatisfactory technical condition with high energy demand and inefficient. (technology is morally and technically outdated). The aim of the project is to significantly reduce the energy performance of the building and thus to reduce the cost of its operation. The project will implement a number of measures including reductions in the efficiency of the process processes, the use of waste heat, the exc...)
(‎Created claim: summary (P836): The store COOP Diskont Králíky is currently in an unsatisfactory technical condition with high energy requirements and inefficient en. management (technology are morally and technically obsolete). The aim of the project is to significantly reduce the energy performance of the building and thus to reduce the costs of its operation. As part of the project, a number of measures will be implemented including reduction of the energy intensity of tech...)
Property / summary
 
The store COOP Diskont Králíky is currently in an unsatisfactory technical condition with high energy requirements and inefficient en. management (technology are morally and technically obsolete). The aim of the project is to significantly reduce the energy performance of the building and thus to reduce the costs of its operation. As part of the project, a number of measures will be implemented including reduction of the energy intensity of technological processes, waste heat recovery, exchange of lighting. (English)
Property / summary: The store COOP Diskont Králíky is currently in an unsatisfactory technical condition with high energy requirements and inefficient en. management (technology are morally and technically obsolete). The aim of the project is to significantly reduce the energy performance of the building and thus to reduce the costs of its operation. As part of the project, a number of measures will be implemented including reduction of the energy intensity of technological processes, waste heat recovery, exchange of lighting. (English) / rank
 
Normal rank
Property / summary: The store COOP Diskont Králíky is currently in an unsatisfactory technical condition with high energy requirements and inefficient en. management (technology are morally and technically obsolete). The aim of the project is to significantly reduce the energy performance of the building and thus to reduce the costs of its operation. As part of the project, a number of measures will be implemented including reduction of the energy intensity of technological processes, waste heat recovery, exchange of lighting. (English) / qualifier
 
point in time: 22 October 2020
Timestamp+2020-10-22T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 16:01, 22 October 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Reduction of energy performance of the object COOP Discount Rabbit
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    845,100.0 Czech koruna
    0 references
    33,804.0 Euro
    10 January 2020
    0 references
    2,817,000.0 Czech koruna
    0 references
    112,680.0 Euro
    10 January 2020
    0 references
    30 percent
    0 references
    15 August 2016
    0 references
    13 September 2016
    0 references
    14 October 2016
    0 references
    KONZUM, obchodní družstvo v Ústí nad Orlicí
    0 references
    0 references

    49°59'0.49"N, 16°22'35.15"E
    0 references
    56201
    0 references
    Prodejna COOP Diskont Králíky je v současné době v nevyhovujícím technickém stavu s vysokými energetickými nároky a neefektivním en. hospodařením (technologie jsou morálně i technicky zastaralé). Cílem projektu je významné snížení energetické náročnosti objektu a tím i redukce nákladů na její provoz. V rámci projektu bude realizováno množství opatření zahrnující snižování en. náročnosti technologických procesů, využití odpadního tepla, výměnu osvětlení. a. (Czech)
    0 references
    The store COOP Diskont Králíky is currently in an unsatisfactory technical condition with high energy requirements and inefficient en. management (technology are morally and technically obsolete). The aim of the project is to significantly reduce the energy performance of the building and thus to reduce the costs of its operation. As part of the project, a number of measures will be implemented including reduction of the energy intensity of technological processes, waste heat recovery, exchange of lighting. (English)
    22 October 2020
    0 references

    Identifiers

    CZ.01.3.10/0.0/0.0/15_010/0000925
    0 references