Reduction of energy performance of the object COOP Discount Rabbit (Q15446): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The salon of COOP Disclose is currently in unsatisfactory technical condition with high energy demand and inefficient. (technology is morally and technically outdated). The aim of the project is to significantly reduce the energy performance of the building and thus to reduce the cost of its operation. The project will implement a number of measures including reductions in the efficiency of the process processes, the use of waste heat, the exc...) |
(Created claim: summary (P836): The store COOP Diskont Králíky is currently in an unsatisfactory technical condition with high energy requirements and inefficient en. management (technology are morally and technically obsolete). The aim of the project is to significantly reduce the energy performance of the building and thus to reduce the costs of its operation. As part of the project, a number of measures will be implemented including reduction of the energy intensity of tech...) |
||||||||||||||
Property / summary | |||||||||||||||
The store COOP Diskont Králíky is currently in an unsatisfactory technical condition with high energy requirements and inefficient en. management (technology are morally and technically obsolete). The aim of the project is to significantly reduce the energy performance of the building and thus to reduce the costs of its operation. As part of the project, a number of measures will be implemented including reduction of the energy intensity of technological processes, waste heat recovery, exchange of lighting. (English) | |||||||||||||||
Property / summary: The store COOP Diskont Králíky is currently in an unsatisfactory technical condition with high energy requirements and inefficient en. management (technology are morally and technically obsolete). The aim of the project is to significantly reduce the energy performance of the building and thus to reduce the costs of its operation. As part of the project, a number of measures will be implemented including reduction of the energy intensity of technological processes, waste heat recovery, exchange of lighting. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The store COOP Diskont Králíky is currently in an unsatisfactory technical condition with high energy requirements and inefficient en. management (technology are morally and technically obsolete). The aim of the project is to significantly reduce the energy performance of the building and thus to reduce the costs of its operation. As part of the project, a number of measures will be implemented including reduction of the energy intensity of technological processes, waste heat recovery, exchange of lighting. (English) / qualifier | |||||||||||||||
point in time: 22 October 2020
|
Revision as of 16:01, 22 October 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Reduction of energy performance of the object COOP Discount Rabbit |
Project in Czech Republic financed by DG Regio |
Statements
845,100.0 Czech koruna
0 references
2,817,000.0 Czech koruna
0 references
30 percent
0 references
15 August 2016
0 references
13 September 2016
0 references
14 October 2016
0 references
KONZUM, obchodní družstvo v Ústí nad Orlicí
0 references
56201
0 references
Prodejna COOP Diskont Králíky je v současné době v nevyhovujícím technickém stavu s vysokými energetickými nároky a neefektivním en. hospodařením (technologie jsou morálně i technicky zastaralé). Cílem projektu je významné snížení energetické náročnosti objektu a tím i redukce nákladů na její provoz. V rámci projektu bude realizováno množství opatření zahrnující snižování en. náročnosti technologických procesů, využití odpadního tepla, výměnu osvětlení. a. (Czech)
0 references
The store COOP Diskont Králíky is currently in an unsatisfactory technical condition with high energy requirements and inefficient en. management (technology are morally and technically obsolete). The aim of the project is to significantly reduce the energy performance of the building and thus to reduce the costs of its operation. As part of the project, a number of measures will be implemented including reduction of the energy intensity of technological processes, waste heat recovery, exchange of lighting. (English)
22 October 2020
0 references
Identifiers
CZ.01.3.10/0.0/0.0/15_010/0000925
0 references