Development and reconstruction of the District Hospital in Nowy Tomyśl — Building “E” 2nd floor, Operational Bloc and Oddział Ortopedii i Traumatology of the Movement (Q137022): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The aim of the project is to rebuild and finish the third floor (II floor) of the hospital Building for the needs of the Department of Ortopedii and Traumatology of the Traffic and Administration Office for the SPZOZ im. Kazimierz Houli in Nowy Tomysl, as well as for the purchase of medical equipment and the equipment of this department of Orléans, the construction project comprises: 1. Construction work, including upgrading of premises. 2. In...) |
(Created claim: summary (P836): The subject of the project is the reconstruction and completion of the third floor (II floor) of building E hospital for the needs of the Orthopedics and Traumatology Department of the Movement Organ and the orthopaedic Occupying Room for the PhD Kazimierz Hołoga SPZOZ in Nowy Tomyśl and for the purchase of medical equipment and equipment of this Orthopedics Division. 1. Construction works, including reconstruction of the premises. 2. Installati...) |
||||||||||||||
Property / summary | |||||||||||||||
The subject of the project is the reconstruction and completion of the third floor (II floor) of building E hospital for the needs of the Orthopedics and Traumatology Department of the Movement Organ and the orthopaedic Occupying Room for the PhD Kazimierz Hołoga SPZOZ in Nowy Tomyśl and for the purchase of medical equipment and equipment of this Orthopedics Division. 1. Construction works, including reconstruction of the premises. 2. Installation works: medical gases, central heating, cold and hot water, sewerage, electricity, low current, ventilation with air conditioning, orthopaedic operating room as well as the installation of a patient preparation room, installation of a bridge on the waking room and electrical and gas panels in patient rooms.In the bed part there will be a surface for the Orthopaedic Branch: — 5 rooms with sanitary nodes.- on-call rooms: nurse, doctor, chief of staff – treatment rooms – other rooms required for sanitary-epidem reasons.In part of the operating complex there will be: — Operational room with facilities – waking room with a possibility of -hour surveillance – lockers, bathrooms and toilets Purchasing investment includes equipment and equipment for the needs of Odd. Orthopaedics and Traumatology of Movement and O.R. Purchase for the bed ward: cardiomonitors, ECG apparatus, PCM rehabilitation rails, beds, tables, transport trolleys, rehabilitation beds, wash-disinfector, medical cabinets, disinfection system, furniture and shelves for rooms. Purchase for the operating room: operating table of orthopaedic, mobile rtg apparatus (type C), cardiomonitors, apparatus for anaesthesia, ventilators, transport trucks, wash-disinfector, arthroscopic tools, medical tables, furniture and shelves for rooms.Product indicators achieved in 2017:- Number of supported medicinal entities: 1 pcs – Number of facilities tailored to the needs of people with disabilities: 1 pcs – Investment outlays for the purchase of medical equipment: 1 055 311,26 PLN. (English) | |||||||||||||||
Property / summary: The subject of the project is the reconstruction and completion of the third floor (II floor) of building E hospital for the needs of the Orthopedics and Traumatology Department of the Movement Organ and the orthopaedic Occupying Room for the PhD Kazimierz Hołoga SPZOZ in Nowy Tomyśl and for the purchase of medical equipment and equipment of this Orthopedics Division. 1. Construction works, including reconstruction of the premises. 2. Installation works: medical gases, central heating, cold and hot water, sewerage, electricity, low current, ventilation with air conditioning, orthopaedic operating room as well as the installation of a patient preparation room, installation of a bridge on the waking room and electrical and gas panels in patient rooms.In the bed part there will be a surface for the Orthopaedic Branch: — 5 rooms with sanitary nodes.- on-call rooms: nurse, doctor, chief of staff – treatment rooms – other rooms required for sanitary-epidem reasons.In part of the operating complex there will be: — Operational room with facilities – waking room with a possibility of -hour surveillance – lockers, bathrooms and toilets Purchasing investment includes equipment and equipment for the needs of Odd. Orthopaedics and Traumatology of Movement and O.R. Purchase for the bed ward: cardiomonitors, ECG apparatus, PCM rehabilitation rails, beds, tables, transport trolleys, rehabilitation beds, wash-disinfector, medical cabinets, disinfection system, furniture and shelves for rooms. Purchase for the operating room: operating table of orthopaedic, mobile rtg apparatus (type C), cardiomonitors, apparatus for anaesthesia, ventilators, transport trucks, wash-disinfector, arthroscopic tools, medical tables, furniture and shelves for rooms.Product indicators achieved in 2017:- Number of supported medicinal entities: 1 pcs – Number of facilities tailored to the needs of people with disabilities: 1 pcs – Investment outlays for the purchase of medical equipment: 1 055 311,26 PLN. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The subject of the project is the reconstruction and completion of the third floor (II floor) of building E hospital for the needs of the Orthopedics and Traumatology Department of the Movement Organ and the orthopaedic Occupying Room for the PhD Kazimierz Hołoga SPZOZ in Nowy Tomyśl and for the purchase of medical equipment and equipment of this Orthopedics Division. 1. Construction works, including reconstruction of the premises. 2. Installation works: medical gases, central heating, cold and hot water, sewerage, electricity, low current, ventilation with air conditioning, orthopaedic operating room as well as the installation of a patient preparation room, installation of a bridge on the waking room and electrical and gas panels in patient rooms.In the bed part there will be a surface for the Orthopaedic Branch: — 5 rooms with sanitary nodes.- on-call rooms: nurse, doctor, chief of staff – treatment rooms – other rooms required for sanitary-epidem reasons.In part of the operating complex there will be: — Operational room with facilities – waking room with a possibility of -hour surveillance – lockers, bathrooms and toilets Purchasing investment includes equipment and equipment for the needs of Odd. Orthopaedics and Traumatology of Movement and O.R. Purchase for the bed ward: cardiomonitors, ECG apparatus, PCM rehabilitation rails, beds, tables, transport trolleys, rehabilitation beds, wash-disinfector, medical cabinets, disinfection system, furniture and shelves for rooms. Purchase for the operating room: operating table of orthopaedic, mobile rtg apparatus (type C), cardiomonitors, apparatus for anaesthesia, ventilators, transport trucks, wash-disinfector, arthroscopic tools, medical tables, furniture and shelves for rooms.Product indicators achieved in 2017:- Number of supported medicinal entities: 1 pcs – Number of facilities tailored to the needs of people with disabilities: 1 pcs – Investment outlays for the purchase of medical equipment: 1 055 311,26 PLN. (English) / qualifier | |||||||||||||||
point in time: 21 October 2020
|
Revision as of 19:43, 21 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Development and reconstruction of the District Hospital in Nowy Tomyśl — Building “E” 2nd floor, Operational Bloc and Oddział Ortopedii i Traumatology of the Movement |
Project in Poland financed by DG Regio |
Statements
4,838,816.93 zloty
0 references
5,692,725.81 zloty
0 references
85.0 percent
0 references
23 February 2017
0 references
28 August 2018
0 references
SAMODZIELNY PUBLICZNY ZAKŁAD OPIEKI ZDROWOTNEJ IM. DOKTORA KAZIMIERZA HOŁOGI
0 references
Przedmiotem projektu jest przebudowa i wykończenie trzeciej kondygnacji (II piętro) budynku E szpitala dla potrzeb Oddziału Ortopedii i Traumatologii Narządu Ruchu i sali operacyjnej ortopedycznej dla SPZOZ im. doktora Kazimierza Hołogi w Nowym Tomyślu oraz na zakup sprzętu medycznego i wyposażenia tego Oddziału Ortopedii.Inwestycja budowlana obejmuje: 1. Prace budowlane, w tym przebudowę pomieszczeń. 2. Prace instalacyjne: gazów medycznych, c.o., wody zimnej i ciepłej, kanalizacji, elektroenergetyczne, słaboprądowe, wentylacyjne z klimatyzacją, zabudowa ortopedycznej sali operacyjnej a także zabudowa sali przygotowania pacjenta, montaż mostu na sali wybudzeń i paneli elektryczno-gazowych na salach pacjentów.W części łóżkowej powstanie powierzchnia dla Oddziału Ortopedycznego: - 5 sal chorych z węzłami sanit.- dyżurki: pielęgniarska, lekarska, ordynatora - gabinety zabiegowe - inne pomieszczenia wymagane względami sanitarno-epidem.W części kompleksu operacyjnego powstanie: - sala operacyjna z zapleczem - sala wybudzeń z możliwością całodobowego nadzoru - szatnie, łazienki i toalety Inwestycja zakupowa obejmuje sprzęt i aparaturę dla potrzeb Odd. Ortopedii i Traumatologii Narządu Ruchu i sali operacyjnej. Zakup dla oddziału łóżkowego: kardiomonitorów, aparatu EKG, szyn rehabilitacyjnych PCM, łóżek, stolików, wózków transport., łóżka (kozetki) rehabilitacyjnej, myjni-dezynfektora, szafek medycznych, systemu do dezynfekcji, mebli i regałów do pomieszczeń. Zakup dla sali operacyjnej: stołu operacyjnego ortopedycznego, mobilnego aparatu rtg (typu ramię C), kardiomonitorów, aparatu do znieczuleń, respiratorów, wózków transportowych, myjni-dezynfektora, narzędzi artroskopowych, stolików medycznych, mebli i regałów do pomieszczeń.Wskaźniki produktu osiągnięte w 2017 roku:- Liczba wspartych podmiotów leczniczych: 1 szt.- Liczba obiektów dostosowanych do potrzeb osób z niepełnosprawnościami: 1 szt.- Nakłady inwestycyjne na zakup aparatury medycznej: 1 055 311,26 zł. (Polish)
0 references
The subject of the project is the reconstruction and completion of the third floor (II floor) of building E hospital for the needs of the Orthopedics and Traumatology Department of the Movement Organ and the orthopaedic Occupying Room for the PhD Kazimierz Hołoga SPZOZ in Nowy Tomyśl and for the purchase of medical equipment and equipment of this Orthopedics Division. 1. Construction works, including reconstruction of the premises. 2. Installation works: medical gases, central heating, cold and hot water, sewerage, electricity, low current, ventilation with air conditioning, orthopaedic operating room as well as the installation of a patient preparation room, installation of a bridge on the waking room and electrical and gas panels in patient rooms.In the bed part there will be a surface for the Orthopaedic Branch: — 5 rooms with sanitary nodes.- on-call rooms: nurse, doctor, chief of staff – treatment rooms – other rooms required for sanitary-epidem reasons.In part of the operating complex there will be: — Operational room with facilities – waking room with a possibility of -hour surveillance – lockers, bathrooms and toilets Purchasing investment includes equipment and equipment for the needs of Odd. Orthopaedics and Traumatology of Movement and O.R. Purchase for the bed ward: cardiomonitors, ECG apparatus, PCM rehabilitation rails, beds, tables, transport trolleys, rehabilitation beds, wash-disinfector, medical cabinets, disinfection system, furniture and shelves for rooms. Purchase for the operating room: operating table of orthopaedic, mobile rtg apparatus (type C), cardiomonitors, apparatus for anaesthesia, ventilators, transport trucks, wash-disinfector, arthroscopic tools, medical tables, furniture and shelves for rooms.Product indicators achieved in 2017:- Number of supported medicinal entities: 1 pcs – Number of facilities tailored to the needs of people with disabilities: 1 pcs – Investment outlays for the purchase of medical equipment: 1 055 311,26 PLN. (English)
21 October 2020
0 references
Identifiers
RPWP.09.01.01-30-0034/17
0 references