(Removed claim: summary (P836): The proposed project will be carried out in the village of Sławobora, in the district of pigs, in the Zachodniopomorskie region. The project will project the construction of a photovoltaic farm that produces electricity for sale. The farm will be located on plot 274 and the installation will be connected to an existing power line. The project will also build a photovoltaic installation for the production of electricity which will be mounted on...) |
(Created claim: summary (P836): The proposed project will be carried out in Sławobor, Sławobor County, in the West Pomeranian Voivodeship. The subject of the project will be the construction of a photovoltaic farm producing electricity for sale. The farm will be located on plot 274, and the installation of the farm will be connected to the existing power line. The project will also build a photovoltaic installation for the production of electricity, which will be installed on...) |
||||||||||||||
Property / summary | |||||||||||||||
The proposed project will be carried out in Sławobor, Sławobor County, in the West Pomeranian Voivodeship. The subject of the project will be the construction of a photovoltaic farm producing electricity for sale. The farm will be located on plot 274, and the installation of the farm will be connected to the existing power line. The project will also build a photovoltaic installation for the production of electricity, which will be installed on plot 307/3. The energy produced from this installation will be intended for direct use in an office and storage facility standing on the same plot, while its surplus will be sold. The material scope of the photovoltaic installation shall include the following elements: • photovoltaic modules, • inverter, • installation design, • CD and AC switchgears, • system grounding, • cables and electro-installation materials. For the material scope of the photovoltaic farm will be used • photovoltaic modules, • inverters, • assembly construction, • CD and AC switchgears, • system monitoring, • system grounding, • cables and electro-installation materials • power line from Trafostation. (English) | |||||||||||||||
Property / summary: The proposed project will be carried out in Sławobor, Sławobor County, in the West Pomeranian Voivodeship. The subject of the project will be the construction of a photovoltaic farm producing electricity for sale. The farm will be located on plot 274, and the installation of the farm will be connected to the existing power line. The project will also build a photovoltaic installation for the production of electricity, which will be installed on plot 307/3. The energy produced from this installation will be intended for direct use in an office and storage facility standing on the same plot, while its surplus will be sold. The material scope of the photovoltaic installation shall include the following elements: • photovoltaic modules, • inverter, • installation design, • CD and AC switchgears, • system grounding, • cables and electro-installation materials. For the material scope of the photovoltaic farm will be used • photovoltaic modules, • inverters, • assembly construction, • CD and AC switchgears, • system monitoring, • system grounding, • cables and electro-installation materials • power line from Trafostation. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The proposed project will be carried out in Sławobor, Sławobor County, in the West Pomeranian Voivodeship. The subject of the project will be the construction of a photovoltaic farm producing electricity for sale. The farm will be located on plot 274, and the installation of the farm will be connected to the existing power line. The project will also build a photovoltaic installation for the production of electricity, which will be installed on plot 307/3. The energy produced from this installation will be intended for direct use in an office and storage facility standing on the same plot, while its surplus will be sold. The material scope of the photovoltaic installation shall include the following elements: • photovoltaic modules, • inverter, • installation design, • CD and AC switchgears, • system grounding, • cables and electro-installation materials. For the material scope of the photovoltaic farm will be used • photovoltaic modules, • inverters, • assembly construction, • CD and AC switchgears, • system monitoring, • system grounding, • cables and electro-installation materials • power line from Trafostation. (English) / qualifier | |||||||||||||||
point in time: 21 October 2020
|
Revision as of 19:30, 21 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Increasing the use of renewable energy sources by building an installation and a photovoltaic farm in Sławoborze |
Project in Poland financed by DG Regio |
Statements
521,696.0 zloty
0 references
613,760.0 zloty
0 references
85.0 percent
0 references
2 October 2017
0 references
30 June 2019
0 references
PRZEDSIĘBIORSTWO WIELOBRANŻOWE EKO-TECH MAREK ROZWADOWSKI
0 references
Wnioskowany projekt zrealizowany zostanie w miejscowości Sławoborze w powiecie świdwińskim, na terenie woj. zachodniopomorskiego. Przedmiotem projektu będzie budowa farmy fotowoltaicznej produkującej energię elektryczną na sprzedaż. Farma zlokalizowana zostanie na działce 274, a instalacja farmy zostanie podłączona do istniejącej linii energetycznej. W ramach projektu wybudowana zostanie również instalacja fotowoltaiczna do produkcji energii elektrycznej, która zamontowana zostanie na działce 307/3. Energia wyprodukowana z tej instalacji przeznaczona będzie do bezpośredniego wykorzystania w obiekcie biurowo-magazynowym stojącym na tej samej działce, natomiast jej nadwyżka zostanie sprzedana. Do zakresu rzeczowego instalacji fotowoltaicznej należą następujące elementy: • moduły fotowoltaiczne, • inwerter, • konstrukcja montażowa, • rozdzielnice CD i AC, • uziemienie systemu, • kable i materiały elektroinstalacyjne. Do zakresu rzeczowego farmy fotowoltaicznej wykorzystane zastaną • moduły fotowoltaiczne, • inwertery, • konstrukcja montażowa, • rozdzielnice CD i AC, • monitoring systemu, • uziemienie systemu, • kable i materiały elektroinstalacyjne • linia zasilająca z trafostacji. (Polish)
0 references
The proposed project will be carried out in Sławobor, Sławobor County, in the West Pomeranian Voivodeship. The subject of the project will be the construction of a photovoltaic farm producing electricity for sale. The farm will be located on plot 274, and the installation of the farm will be connected to the existing power line. The project will also build a photovoltaic installation for the production of electricity, which will be installed on plot 307/3. The energy produced from this installation will be intended for direct use in an office and storage facility standing on the same plot, while its surplus will be sold. The material scope of the photovoltaic installation shall include the following elements: • photovoltaic modules, • inverter, • installation design, • CD and AC switchgears, • system grounding, • cables and electro-installation materials. For the material scope of the photovoltaic farm will be used • photovoltaic modules, • inverters, • assembly construction, • CD and AC switchgears, • system monitoring, • system grounding, • cables and electro-installation materials • power line from Trafostation. (English)
21 October 2020
0 references
Identifiers
RPZP.02.10.00-32-B255/17
0 references