Installation of 742 kWp photovoltaic installations for the Housing Cooperative Lokators-owned Slavs in Świnoujście (Q137824): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in 1 language: remove_english_label) |
(Changed label, description and/or aliases in 1 language: translated_label) |
||
label / en | label / en | ||
Installation of 742 kWp photovoltaic installations for the Housing Cooperative Lokators-owned Slavs in Świnoujście |
Revision as of 19:30, 21 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Installation of 742 kWp photovoltaic installations for the Housing Cooperative Lokators-owned Slavs in Świnoujście |
Project in Poland financed by DG Regio |
Statements
1,903,897.79 zloty
0 references
4,230,884.0 zloty
0 references
45.0 percent
0 references
16 February 2019
0 references
30 June 2019
0 references
SPÓŁDZIENIA MIESZKANIOWA LOKATORSKO WŁASNOŚCIOWA SŁOWIANIN
0 references
Przedmiotem projektu jest budowa instalacji fotowoltaicznych o łącznej mocy zainstalowanej 742 kW, składających się z 2968 paneli fotowoltaicznych, zajmujących łączną powierzchnię 4897,2 m2, które będą zainstalowane na 41 budynkach należących do Wnioskodawcy. Planowana instalacja będzie przyłączona do istniejącej sieci elektrycznej. Energia elektryczna zostanie spożytkowana tylko i wyłącznie, na pokrycie zapotrzebowania energetycznego dla części wspólnych (administracyjnych) danego budynku, tj. np.: oświetlenie klatek schodowych, windy, hydrofornie. Należy podkreślić, iż każda z instalacji fotowoltaicznych, nie przekroczy mocy 40 kW, przypadającej na zasilenie części administracyjnej, jednego budynku mieszkalnego, tj. spełni wymagania mikroinstalacji prosumenckiej, zgodnie z z Ustawą o OZE z dn. 20.02.2015 r., wraz z późn. zmianami. (Polish)
0 references
The subject of the project is the construction of photovoltaic installations with a total installed capacity of 742 kW, consisting of 2968 photovoltaic panels covering a total area of 4897.2 m², which will be installed on 41 buildings belonging to the Applicant. The planned installation will be connected to the existing electricity grid. Electricity will be used only and exclusively to cover the energy demand for the common (administrative) parts of the building, i.e.: staircase lighting, elevators, hydroforest. It should be emphasised that each of the PV installations will not exceed the capacity of 40 kW per administrative part, one residential building, i.e. it will meet the requirements of a prosumer micro-installation, in accordance with the RES Act of the day. 20.02.2015, as amended. (English)
21 October 2020
0 references
Identifiers
RPZP.02.10.00-32-B239/17
0 references