Q137800 (Q137800): Difference between revisions
Jump to navigation
Jump to search
(Created claim: summary (P836): The scope of the project includes the conversion of the oil boiler room into a heat pump installation assisted by an oil boiler in the Schools Complex in Sławsk. Currently, the system of heat generation of the School Complex in Sławsk consists of two oil boilers operating in a cascade with a capacity of 130 KW each. The planned investment is to leave one of the oil boilers as a peak source and produce a renewable energy source in the form of a h...) |
(Changed label, description and/or aliases in 1 language: remove_english_label) |
||
label / en | label / en | ||
Revision as of 19:22, 21 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project in Poland financed by DG Regio |
Statements
740,501.3 zloty
0 references
871,178.0 zloty
0 references
85.0 percent
0 references
24 June 2016
0 references
28 June 2019
0 references
GMINA SŁAWNO
0 references
Zakres przedmiotowego projektu obejmuje przebudowę kotłowni olejowej na instalację pompy ciepła wspomaganą kotłem olejowym w Zespole Szkół w Sławsku. Obecnie system wytwarzania energii cieplnej Zespołu Szkół w Sławsku składa się z dwóch kotłów olejowych działających w kaskadzie o mocy 130 KW każdy. Planowana inwestycja zakłada pozostawienie jednego z kotłów olejowych jako źródła szczytowego i wykonanie odnawialnego źródła energii w postaci pompy ciepła o mocy 106,6 kW. Dolnym źródłem instalacji pompy ciepła będą odwierty pionowe w liczbie 19 szt. Każdy o głębokości 100m.W ramach projektu przewidziano następujące etapy:1)przygotowanie dokumentacji technicznej i kosztorysowej wraz ze zgłoszeniem oraz następnie studium wykonalności, 2)wyłonienie firmy oraz przeprowadzenie prac budowlano-montażowych pompy ciepła zgodnie z projektem. 3)nadzór nad inwestycją przez inspektora nadzoru oraz 4)promocja projektu. Ostatecznie inwestycja ma na celu zmniejszenie kosztów ogrzewania obiektu, zastąpienie jednego z kotłów odnawialnymi źródłami energii oraz tym samym zmniejszenie emisji gazów cieplarnianych do atmosfery. Szczegółowy zakres rzeczowy przedstawiono w rozdziale 4.1.3.2 studium wykonalności.Inwestycja zostanie wdrożona w życie po przeprowadzeniu przetargu nieograniczonego,w ramach którego zostanie wyłoniona firma,która przeprowadzi prace projektowe oraz budowlano-montażowe. Po zakończeniu projektu możliwe będzie wykorzystanie pełnej funkcjonalności infrastruktury powstałej w ramach realizacji projektu i nie będzie to wymagało już dodatkowych działań ani wdrażania innych projektów. Gmina Sławno posiada i zapewni na swoim obszarze zasoby techniczne,kadrowe i wiedzę gwarantującą uruchomienie funkcjonowania infrastruktury po zakończeniu projektu.Będą to osoby zatrudnione obecnie w Gminie z wieloletnim doświadczeniem we wdrażaniu podobnych inwestycji.Charakter inwestycji jest stacjonarny o czym świadczy wskazanie lokalizacji projektu. (Polish)
0 references
The scope of the project includes the conversion of the oil boiler room into a heat pump installation assisted by an oil boiler in the Schools Complex in Sławsk. Currently, the system of heat generation of the School Complex in Sławsk consists of two oil boilers operating in a cascade with a capacity of 130 KW each. The planned investment is to leave one of the oil boilers as a peak source and produce a renewable energy source in the form of a heat pump with a power of 106,6 kW. The lower source of heat pump installation will be vertical drilling of 19 pcs. Each with a depth of 100 m.The project includes the following steps: 1) preparation of technical and financial documentation together with the application and subsequent feasibility study, 2)the opening of the company and carrying out construction and assembly works of the heat pump according to the project. 3) supervising the investment by the Supervisory Supervisor and 4)promotion of the project. Ultimately, the investment aims to reduce heating costs, replace one boiler with renewable energy sources and thereby reduce greenhouse gas emissions into the atmosphere. The detailed material scope is set out in Chapter 4.1.3.2 of the feasibility study.The investment will be implemented after an unlimited tender, within which the company will be selected to carry out design and construction and assembly works. Once the project is completed, it will be possible to use the full functionality of the infrastructure created by the project and will no longer require additional actions or implementation of other projects. The municipality of Sławno has and will provide technical resources, resources and knowledge in its area to ensure the commissioning of the infrastructure after the completion of the project.It will be people currently employed in the commune with many years of experience in implementing similar investments.The characteristics of the investment are stationary, as evidenced by the indication of the location of the project. (English)
21 October 2020
0 references
Identifiers
RPZP.02.10.00-32-B174/17
0 references