Construction of installations for the production of heat and electricity from RES (Q137757): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The subject of the investment is the construction of a heat pump installation for the production of heat from ambient heat and the construction of an installation for the production of electricity for the production of solar radiation. The project will address disadvantages linked to the disadvantages caused by the manner and price of the supply of electricity and heat supply services in which the applicant is engaged in an economic activity....)
(‎Created claim: summary (P836): The focus of the investment is the construction of a heat pump installation for the production of heat from heat from the environment and the construction of installations for the production of electricity using solar radiation. The implementation of the project will eliminate problems related to the inconvenience resulting from the manner and price of the services provided in the scope of the electricity and heat supply of the utility facility...)
Property / summary
 
The focus of the investment is the construction of a heat pump installation for the production of heat from heat from the environment and the construction of installations for the production of electricity using solar radiation. The implementation of the project will eliminate problems related to the inconvenience resulting from the manner and price of the services provided in the scope of the electricity and heat supply of the utility facility in which the applicant conducts economic activity. The long-term effect of the project will be an increase in the share of energy produced from RES in total energy produced, which will result in reduction of pollutant emissions to the environment and thus improvement of air quality in the city and region. The project’s material scope includes: 1. Heat knot 2. Ground heat exchanger 3. Photovoltaic modules with gross installation power: MWe = 0,143 (143 kW), MWt = 0,0498 (49.8 kW). Planned average annual output: 125,99 MWhe/year and 86,79 MWht/year. The scope of the project shall reflect the following output indicators: — Number of built units of electricity generation from RES 1 units; — Number of built units of heat generation from RES 1 units; — 8/33 Checkout, checksum: 01be7eddda Additional electricity generation capacity from renewable sources 0,14 MWe; — Additional capacity to generate heat from renewable sources 0,05 MWt (English)
Property / summary: The focus of the investment is the construction of a heat pump installation for the production of heat from heat from the environment and the construction of installations for the production of electricity using solar radiation. The implementation of the project will eliminate problems related to the inconvenience resulting from the manner and price of the services provided in the scope of the electricity and heat supply of the utility facility in which the applicant conducts economic activity. The long-term effect of the project will be an increase in the share of energy produced from RES in total energy produced, which will result in reduction of pollutant emissions to the environment and thus improvement of air quality in the city and region. The project’s material scope includes: 1. Heat knot 2. Ground heat exchanger 3. Photovoltaic modules with gross installation power: MWe = 0,143 (143 kW), MWt = 0,0498 (49.8 kW). Planned average annual output: 125,99 MWhe/year and 86,79 MWht/year. The scope of the project shall reflect the following output indicators: — Number of built units of electricity generation from RES 1 units; — Number of built units of heat generation from RES 1 units; — 8/33 Checkout, checksum: 01be7eddda Additional electricity generation capacity from renewable sources 0,14 MWe; — Additional capacity to generate heat from renewable sources 0,05 MWt (English) / rank
 
Normal rank
Property / summary: The focus of the investment is the construction of a heat pump installation for the production of heat from heat from the environment and the construction of installations for the production of electricity using solar radiation. The implementation of the project will eliminate problems related to the inconvenience resulting from the manner and price of the services provided in the scope of the electricity and heat supply of the utility facility in which the applicant conducts economic activity. The long-term effect of the project will be an increase in the share of energy produced from RES in total energy produced, which will result in reduction of pollutant emissions to the environment and thus improvement of air quality in the city and region. The project’s material scope includes: 1. Heat knot 2. Ground heat exchanger 3. Photovoltaic modules with gross installation power: MWe = 0,143 (143 kW), MWt = 0,0498 (49.8 kW). Planned average annual output: 125,99 MWhe/year and 86,79 MWht/year. The scope of the project shall reflect the following output indicators: — Number of built units of electricity generation from RES 1 units; — Number of built units of heat generation from RES 1 units; — 8/33 Checkout, checksum: 01be7eddda Additional electricity generation capacity from renewable sources 0,14 MWe; — Additional capacity to generate heat from renewable sources 0,05 MWt (English) / qualifier
 
point in time: 21 October 2020
Timestamp+2020-10-21T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 19:20, 21 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of installations for the production of heat and electricity from RES
Project in Poland financed by DG Regio

    Statements

    0 references
    766,615.0 zloty
    0 references
    183,987.6 Euro
    13 January 2020
    0 references
    901,900.0 zloty
    0 references
    216,456.0 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    31 May 2017
    0 references
    31 May 2019
    0 references
    ANDRZEJ KONARSKI AKWARYSTYCZNY24
    0 references
    0 references
    Przedmiotem inwestycji jest budowa instalacji pompy ciepła do produkcji energii cieplnej z ciepła z otoczenia oraz budowa instalacji do produkcji energii elektrycznej wykorzystująca promieniowanie słoneczne. Realizacja projektu pozwoli wyeliminować problemy związane z niedogodnościami wynikającymi ze sposobu i ceny świadczonych usług z zakresu zaopatrzenia w energię elektryczną i cieplną obiektu użytkowego, w którym Wnioskodawca prowadzi działalność gospodarczą. Długotrwałym efektem realizacji projektu będzie zwiększenie udziału energii wyprodukowanej z OZE w energii wyprodukowanej ogółem, co przełoży się na redukcję emisji zanieczyszczeń do środowiska, a co za tym idzie poprawy jakości powietrza w mieście i regionie. Zakres rzeczowy projektu obejmuje: 1. Węzeł cieplny 2. Wymiennik gruntowy 3. Moduły fotowoltaiczne z oprzyrządowaniem Moc instalacji brutto: MWe = 0,143 (143kW), MWt = 0,0498 (49,8kW). Planowana średnia produkcja roczna: 125,99 MWhe/rok oraz 86,79 MWht/ rok. Zakres projektu odzwierciedlają następujące wskaźniki produktu: - Liczba wybudowanych jednostek wytwarzania energii elektrycznej z OZE 1 szt.; - Liczba wybudowanych jednostek wytwarzania energii cieplnej z OZE 1 szt.; - 8 / 33 Wydruk kontrolny, suma kontrolna: 01be7eddda Dodatkowa zdolność wytwarzania energii elektrycznej ze źródeł odnawianych 0,14 MWe; - Dodatkowa zdolność wytwarzania energii cieplnej ze źródeł odnawialnych 0,05 MWt (Polish)
    0 references
    The focus of the investment is the construction of a heat pump installation for the production of heat from heat from the environment and the construction of installations for the production of electricity using solar radiation. The implementation of the project will eliminate problems related to the inconvenience resulting from the manner and price of the services provided in the scope of the electricity and heat supply of the utility facility in which the applicant conducts economic activity. The long-term effect of the project will be an increase in the share of energy produced from RES in total energy produced, which will result in reduction of pollutant emissions to the environment and thus improvement of air quality in the city and region. The project’s material scope includes: 1. Heat knot 2. Ground heat exchanger 3. Photovoltaic modules with gross installation power: MWe = 0,143 (143 kW), MWt = 0,0498 (49.8 kW). Planned average annual output: 125,99 MWhe/year and 86,79 MWht/year. The scope of the project shall reflect the following output indicators: — Number of built units of electricity generation from RES 1 units; — Number of built units of heat generation from RES 1 units; — 8/33 Checkout, checksum: 01be7eddda Additional electricity generation capacity from renewable sources 0,14 MWe; — Additional capacity to generate heat from renewable sources 0,05 MWt (English)
    21 October 2020
    0 references

    Identifiers

    RPZP.02.10.00-32-B068/17
    0 references