Construction of four photovoltaic installations for MWiK Sp. z o.o. in Kołobrzeg (Q137741): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in 1 language: remove_english_label)
(‎Changed label, description and/or aliases in 1 language: translated_label)
label / enlabel / en
 
Construction of four photovoltaic installations for MWiK Sp. z o.o. in Kołobrzeg

Revision as of 19:20, 21 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of four photovoltaic installations for MWiK Sp. z o.o. in Kołobrzeg
Project in Poland financed by DG Regio

    Statements

    0 references
    1,236,363.24 zloty
    0 references
    296,727.18 Euro
    13 January 2020
    0 references
    1,454,545.0 zloty
    0 references
    349,090.8 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    29 October 2018
    0 references
    30 November 2019
    0 references
    MIEJSKIE WODOCIĄGI I KANALIZACJA SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
    0 references
    0 references
    Planowane przedsięwzięcie należy do grupy projektów stacjonarnych. Projekt polega na budowie 4 instalacji fotowoltaicznych, o łącznej mocy ok. 340 kWh łącznie, z niezbędną infrastrukturą przyłączeniową, produkującej energię na potrzeby własne Miejskich Wodociągów i Kanalizacji Sp. z o.o z siedzibą w Kołobrzegu. W wyniku realizacji inwestycji powstaną cztery instalacje fotowoltaiczne – dwie na terenie OŚ Korzyścienko (A i B) oraz dwie na ternie Ujęcia Wody Bogucino (A i B) - każda o mocy ok. 85 kWp każda. Instalacje fotowoltaiczne zostaną posadowione na terenie: - działek nr 129, 127, 191/5 obręb 0010 Obroty (teren Ujęcia Wody Boguciono), - działka nr 314/15 obręb 0005 Korzystno (terenie Oczyszczalni Ścieków w Korzyscienku) Powierzchnia terenu przeznaczonego pod instalację, w każdej z dwóch lokalizacji, zajmie - ok. 0,49 ha. Teren stanowi własność spółki lub jest w użytkowaniu wieczystym i posiada dogodny dojazd, uzbrojenie oraz tereny komunikacyjne. W ramach projektu na gruncie zamontowane zostaną panele fotowoltaiczne na stelażu. Instalacje PV zostaną wykonane w systemie OFF GRID z zerowym eksportem energii do sieci. Produkowana energia będzie w całości wykorzystywana na potrzeby własne OŚ Korzyścienko i Ujęcia Wody w Bogucinie. Każda z czterech instalacji będzie zbudowana z 315 modułów fotowoltaicznych, 2 falowników PV, konstrukcji wsporczej, tras kablowych DC, rozdzielni pośrednich DC z zabezpieczeniami, rozdzielni pośrednich AC z zabezpieczeniami, tras kablowych AC. Dla każdego z dwóch zespołów instalacji (A i B) zostanie zamontowany wspólny układ monitorowania pracy i sterowania wraz z systemem ograniczającym wypływ energii do sieci. W wyniku realizacji projektu nastąpi również rozbudowa nastającego systemu SCADA oraz rozbudowa/modernizacja rozdzielni głównej. Powstanie również ogrodzenie i system monitoringu wizyjnego z czujkami ruchu i oświetleniem. (Polish)
    0 references
    The planned project belongs to a group of fixed projects. The project consists of the construction of 4 photovoltaic installations, with a total power of approx. 340 kWh, including the necessary connection infrastructure, producing energy for own needs of the Municipal Waterworks and Sewerage Sp. z o.o. with its registered office in Kołobrzeg. As a result of the investment, four photovoltaic installations will be created – two in the OŚ Korzyścienko (A and B) and two on the premises of the Water District Bogucino (A and B) – each with a capacity of approx. 85 kWp each. Photovoltaic installations will be planted on the premises: — plot no. 129, 127, 191/5 perimeter 0010 Turnovers (area of the Water Reception Boguciono), – plot No 314/15 perimeter 0005 Benefit (the area of sewage treatment plant in Korzyscienek) The area of the area intended for installation, in each of the two locations, will take up – approx. 0.49 ha. The area is owned by the company or is in perpetual use and has convenient access, armament and communication areas. As part of the project, photovoltaic panels on the frame will be installed on the ground. PV installations will be made in OFF GRID system with zero energy export to the grid. The energy produced will be used entirely for the OŚ Use and Water Reception in Bogucin. Each of the four installations will consist of 315 photovoltaic modules, 2 PV inverters, support structure, DC cable routes, DC intermediate switchboards with security features, AC intermediate switchboards, AC cable routes. For each of the two systems (A and B) a common monitoring and control system together with a system limiting the power outflow into the grid shall be installed. The project will also result in the expansion of the existing SCADA system and the extension/modernisation of the main switchboard. There will also be a fence and a video surveillance system with motion detectors and lighting. (English)
    21 October 2020
    0 references

    Identifiers

    RPZP.02.10.00-32-B039/17
    0 references