(Removed claim: summary (P836): The planned investment is the construction of a new solar farm (photovoltaic power plant) with a capacity of up to 1 MW (0,883 MWp) in the Zachodniopomorskie Province in the municipality of Choszzno. It is intended that 3.300 units of 295 Wp panels are to be located within the farm area. The panels will be mounted on the supporting structure in a set of connected conductors and cables in a block with a power of approximately. 1 MWp. The panels...) |
(Created claim: summary (P836): The object of the planned investment is the construction of a new solar farm (photovoltaic power plant) with a capacity of up to 1 MW (0.883 MWp) in the Zachodniopomorskie voivodship in the Choszczno commune. In the area of the farm, 3,300 units of panels with a capacity of 295 Wp are planned. The panels will be mounted on the support structure in sets connected by wires and cables into a block of approx. 1 MWp. The panels used will cooperate wi...) |
||||||||||||||
Property / summary | |||||||||||||||
The object of the planned investment is the construction of a new solar farm (photovoltaic power plant) with a capacity of up to 1 MW (0.883 MWp) in the Zachodniopomorskie voivodship in the Choszczno commune. In the area of the farm, 3,300 units of panels with a capacity of 295 Wp are planned. The panels will be mounted on the support structure in sets connected by wires and cables into a block of approx. 1 MWp. The panels used will cooperate with 30 inverters, which will be connected to cable connectors with a container transformer station, connected directly to the transmission network of the National Energy System. The project is stationary and will be implemented in 2 stages: 1. preparatory work; 2) Construction of a photovoltaic farm. (English) | |||||||||||||||
Property / summary: The object of the planned investment is the construction of a new solar farm (photovoltaic power plant) with a capacity of up to 1 MW (0.883 MWp) in the Zachodniopomorskie voivodship in the Choszczno commune. In the area of the farm, 3,300 units of panels with a capacity of 295 Wp are planned. The panels will be mounted on the support structure in sets connected by wires and cables into a block of approx. 1 MWp. The panels used will cooperate with 30 inverters, which will be connected to cable connectors with a container transformer station, connected directly to the transmission network of the National Energy System. The project is stationary and will be implemented in 2 stages: 1. preparatory work; 2) Construction of a photovoltaic farm. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The object of the planned investment is the construction of a new solar farm (photovoltaic power plant) with a capacity of up to 1 MW (0.883 MWp) in the Zachodniopomorskie voivodship in the Choszczno commune. In the area of the farm, 3,300 units of panels with a capacity of 295 Wp are planned. The panels will be mounted on the support structure in sets connected by wires and cables into a block of approx. 1 MWp. The panels used will cooperate with 30 inverters, which will be connected to cable connectors with a container transformer station, connected directly to the transmission network of the National Energy System. The project is stationary and will be implemented in 2 stages: 1. preparatory work; 2) Construction of a photovoltaic farm. (English) / qualifier | |||||||||||||||
point in time: 21 October 2020
|
Revision as of 19:20, 21 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Solar Photovoltaic Photovoltaic |
Project in Poland financed by DG Regio |
Statements
1,554,005.88 zloty
0 references
2,009,133.12 zloty
0 references
77.35 percent
0 references
4 January 2016
0 references
25 June 2019
0 references
ROZTOCZE ENERGIA SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
0 references
Przedmiotem planowej inwestycji jest budowa nowej farmy słonecznej (elektrowni fotowoltaicznej) o mocy do 1 MW ( 0,883 MWp) na terenie województwa zachodniopomorskiego w Gminie Choszczno. Na obszarze farmy planowane jest usytuowanie 3.300 sztuk paneli o mocy 295 Wp każdy. Panele zostaną zamontowane na konstrukcji wsporczej w zestawach połączonych przewodami i kablami w blok o mocy ok. 1 MWp. Zastosowane panele będą współpracowały z 30 inwerterami, które będą połączone złączami kablowymi z kontenerową stacją transformatorową, podłączoną bezpośrednio do sieci przesyłowej Krajowego Systemu Energetycznego. Projekt ma charakter stacjonarny i będzie realizowany w 2 etapach: 1) prace przygotowawcze; 2) Budowa farmy fotowoltaicznej. (Polish)
0 references
The object of the planned investment is the construction of a new solar farm (photovoltaic power plant) with a capacity of up to 1 MW (0.883 MWp) in the Zachodniopomorskie voivodship in the Choszczno commune. In the area of the farm, 3,300 units of panels with a capacity of 295 Wp are planned. The panels will be mounted on the support structure in sets connected by wires and cables into a block of approx. 1 MWp. The panels used will cooperate with 30 inverters, which will be connected to cable connectors with a container transformer station, connected directly to the transmission network of the National Energy System. The project is stationary and will be implemented in 2 stages: 1. preparatory work; 2) Construction of a photovoltaic farm. (English)
21 October 2020
0 references
Identifiers
RPZP.02.10.00-32-B015/17
0 references