Solar photovoltaic (photovoltaic) power plant: (Q137706): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The project involves the construction of a PV farm with a total capacity of up to 1 MW with an accompanying infrastructure consisting of: solar modules, wiring and retrofit plants, junction boxes, transformer station container, technical container (storage), internal ground road and land site on land part of the plot No 185/1 in Bczyno, Czapplotinek. The project is stationary. The electricity produced in it will be fed into the electricity gri...)
(‎Created claim: summary (P836): The subject of the project is the construction of a photovoltaic farm with a total capacity of up to 1 MW together with the accompanying infrastructure, which includes: photovoltaic modules, fixed and variable-current wiring, connection boxes, transformer station container, technical container (storage), internal ground road and ground area on the area of the plot no. 185/1 in Broczyno, Gm. Czaplinek. The project is stationary. The electricity p...)
Property / summary
 
The subject of the project is the construction of a photovoltaic farm with a total capacity of up to 1 MW together with the accompanying infrastructure, which includes: photovoltaic modules, fixed and variable-current wiring, connection boxes, transformer station container, technical container (storage), internal ground road and ground area on the area of the plot no. 185/1 in Broczyno, Gm. Czaplinek. The project is stationary. The electricity produced in it will be delivered to the power grid Energa Branch in Kalisz. The most important stages of the project’s implementation include preparatory work consisting of obtaining the conditions of connection to the electricity grid and obtaining a construction permit. The next stage is the construction phase, which includes planting the plant’s skeleton and assembly of photovoltaic panels. At this stage, work will also be carried out on preparing the connection of the power plant to the OSD network, construction of the power connection, construction of a fence, execution of access, installation of the monitoring system. All construction works will be supervised by a supervisory inspector, selected by a competitive procedure. Due to the need to conduct administrative procedures related to obtaining the required decisions and permits and the necessary tendering procedures, the construction process will start and end in 2017. The power plant will start generating electricity at the turn of 2017 and 2018, and in 2018 it will reach the full planned production capacity of 1037 MWh.The technical implementation of the project is guaranteed by the achieved conditions for connection to the grid. This means that it is possible to use the full functionality of the infrastructure immediately after the completion of the project, and that the project does not require additional actions to fully exploit it. The entity implementing the project will be the Applicant – SolarStar Sp. z o.o. with its registered office in Warsaw. (English)
Property / summary: The subject of the project is the construction of a photovoltaic farm with a total capacity of up to 1 MW together with the accompanying infrastructure, which includes: photovoltaic modules, fixed and variable-current wiring, connection boxes, transformer station container, technical container (storage), internal ground road and ground area on the area of the plot no. 185/1 in Broczyno, Gm. Czaplinek. The project is stationary. The electricity produced in it will be delivered to the power grid Energa Branch in Kalisz. The most important stages of the project’s implementation include preparatory work consisting of obtaining the conditions of connection to the electricity grid and obtaining a construction permit. The next stage is the construction phase, which includes planting the plant’s skeleton and assembly of photovoltaic panels. At this stage, work will also be carried out on preparing the connection of the power plant to the OSD network, construction of the power connection, construction of a fence, execution of access, installation of the monitoring system. All construction works will be supervised by a supervisory inspector, selected by a competitive procedure. Due to the need to conduct administrative procedures related to obtaining the required decisions and permits and the necessary tendering procedures, the construction process will start and end in 2017. The power plant will start generating electricity at the turn of 2017 and 2018, and in 2018 it will reach the full planned production capacity of 1037 MWh.The technical implementation of the project is guaranteed by the achieved conditions for connection to the grid. This means that it is possible to use the full functionality of the infrastructure immediately after the completion of the project, and that the project does not require additional actions to fully exploit it. The entity implementing the project will be the Applicant – SolarStar Sp. z o.o. with its registered office in Warsaw. (English) / rank
 
Normal rank
Property / summary: The subject of the project is the construction of a photovoltaic farm with a total capacity of up to 1 MW together with the accompanying infrastructure, which includes: photovoltaic modules, fixed and variable-current wiring, connection boxes, transformer station container, technical container (storage), internal ground road and ground area on the area of the plot no. 185/1 in Broczyno, Gm. Czaplinek. The project is stationary. The electricity produced in it will be delivered to the power grid Energa Branch in Kalisz. The most important stages of the project’s implementation include preparatory work consisting of obtaining the conditions of connection to the electricity grid and obtaining a construction permit. The next stage is the construction phase, which includes planting the plant’s skeleton and assembly of photovoltaic panels. At this stage, work will also be carried out on preparing the connection of the power plant to the OSD network, construction of the power connection, construction of a fence, execution of access, installation of the monitoring system. All construction works will be supervised by a supervisory inspector, selected by a competitive procedure. Due to the need to conduct administrative procedures related to obtaining the required decisions and permits and the necessary tendering procedures, the construction process will start and end in 2017. The power plant will start generating electricity at the turn of 2017 and 2018, and in 2018 it will reach the full planned production capacity of 1037 MWh.The technical implementation of the project is guaranteed by the achieved conditions for connection to the grid. This means that it is possible to use the full functionality of the infrastructure immediately after the completion of the project, and that the project does not require additional actions to fully exploit it. The entity implementing the project will be the Applicant – SolarStar Sp. z o.o. with its registered office in Warsaw. (English) / qualifier
 
point in time: 21 October 2020
Timestamp+2020-10-21T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 19:19, 21 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Solar photovoltaic (photovoltaic) power plant:
Project in Poland financed by DG Regio

    Statements

    0 references
    1,752,862.93 zloty
    0 references
    420,687.10 Euro
    13 January 2020
    0 references
    2,191,078.69 zloty
    0 references
    525,858.89 Euro
    13 January 2020
    0 references
    80.0 percent
    0 references
    30 November 2015
    0 references
    31 August 2018
    0 references
    SOLARSTAR SP. Z O. O.
    0 references
    0 references
    Przedmiotem projektu jest budowa farmy fotowoltaicznej o łącznej mocy do 1 MW wraz z infrastrukturą towarzyszącą, w skład której wchodzą: moduły fotowoltaiczne, okablowanie stało i zmienno-prądowe, skrzynki przyłączeniowe, kontener stacji transformatorowej, kontener techniczny (magazynowy), wewnętrzna droga gruntowa i plac gruntowy na terenie części działki o nr ew. 185/1 w miejscowości Broczyno, gm. Czaplinek. Projekt ma charakter stacjonarny. Wyprodukowana w niej energia elektryczna będzie dostarczana do sieci elektroenergetycznej Energa Oddział w Kaliszu. Do najważniejszych etapów realizacji przedsięwzięcia należą prace przygotowawcze polegające na uzyskaniu warunków przyłączenia do sieci elektroenergetycznej oraz uzyskanie pozwolenia na budowę. Kolejnym etapem jest etap prac budowlanych, który obejmuje posadowienie szkieletu elektrowni i montaż paneli fotowoltaicznych. W tym etapie przeprowadzone zostaną także prace polegające na przygotowaniu przyłączenia elektrowni do sieci OSD, budowie przyłącza energetycznego, budowie ogrodzenia, wykonaniu dojazdu, instalacji systemu monitoringu. Nad całością prac budowlanych będzie czuwał wyłoniony w drodze postępowania konkurencyjnego, inspektor nadzoru. Ze względu na konieczność przeprowadzenia postępowań administracyjnych związanych z uzyskaniem wymaganych decyzji i pozwoleń oraz niezbędnych procedur przetargowych proces budowy rozpocznie się i zakończy w 2017r. Elektrownia rozpocznie wytwarzanie energii elektrycznej na przełomie 2017 i 2018 roku, i w 2018 roku osiągnie pełną zaplanowaną zdolność produkcyjną 1037 MWh.Techniczną realizacja projektu gwarantują uzyskane warunki przyłączenia do sieci. Oznacza to, iż bezpośrednio po zakończeniu realizacji projektu jest możliwe wykorzystanie pełnej funkcjonalności infrastruktury, zaś projekt nie wymaga dodatkowych działań w celu jego pełnego wykorzystania. Podmiotem wdrażającym projekt będzie Wnioskodawca - SolarStar Sp. z o.o. z siedzibą w Warszawie. (Polish)
    0 references
    The subject of the project is the construction of a photovoltaic farm with a total capacity of up to 1 MW together with the accompanying infrastructure, which includes: photovoltaic modules, fixed and variable-current wiring, connection boxes, transformer station container, technical container (storage), internal ground road and ground area on the area of the plot no. 185/1 in Broczyno, Gm. Czaplinek. The project is stationary. The electricity produced in it will be delivered to the power grid Energa Branch in Kalisz. The most important stages of the project’s implementation include preparatory work consisting of obtaining the conditions of connection to the electricity grid and obtaining a construction permit. The next stage is the construction phase, which includes planting the plant’s skeleton and assembly of photovoltaic panels. At this stage, work will also be carried out on preparing the connection of the power plant to the OSD network, construction of the power connection, construction of a fence, execution of access, installation of the monitoring system. All construction works will be supervised by a supervisory inspector, selected by a competitive procedure. Due to the need to conduct administrative procedures related to obtaining the required decisions and permits and the necessary tendering procedures, the construction process will start and end in 2017. The power plant will start generating electricity at the turn of 2017 and 2018, and in 2018 it will reach the full planned production capacity of 1037 MWh.The technical implementation of the project is guaranteed by the achieved conditions for connection to the grid. This means that it is possible to use the full functionality of the infrastructure immediately after the completion of the project, and that the project does not require additional actions to fully exploit it. The entity implementing the project will be the Applicant – SolarStar Sp. z o.o. with its registered office in Warsaw. (English)
    21 October 2020
    0 references

    Identifiers

    RPZP.02.10.00-32-A090/16
    0 references