Closure of the coal furnace — implementation of a new heating system based on heat pumps with a total capacity of 74 KW at the Stargard Street at Okuliki Street 3 (Q137675): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Removed claim: summary (P836): A comprehensive modernisation of the existing heating system based on: Istn — 1 AND operated unit with a power of 80 kW — fired solid fuel with very low heating efficiency — 2 AND operating district heating installation as (operating parameters 90/70 C), characterised by very low efficiency of transmission and use of thermal energy — by applying a new high-efficiency heating system based on renewable energy technology, i.e.: OZE-1 I a cascade...)
Property / summary
A comprehensive modernisation of the existing heating system based on: Istn — 1 AND operated unit with a power of 80 kW — fired solid fuel with very low heating efficiency — 2 AND operating district heating installation as (operating parameters 90/70 C), characterised by very low efficiency of transmission and use of thermal energy — by applying a new high-efficiency heating system based on renewable energy technology, i.e.: OZE-1 I a cascade of five reverse air-to-water heat pumps with a combined output of 74 kW (operating parameters 55/45 C) with very high thermal energy efficiency of COP = 5.08 I energy efficiency class “A + +” RES -2 I installation of PV panels PV power generation 22 kW (dedicated work to install RES 1 heat pump) and adapting the installation to the new heat source of OE-1 (55/45 C operating parameters) characterised by very high transmission efficiency, regulation and use of heat, Conclusions: W-1 I is a stationary project. (English)
 
Property / summary: A comprehensive modernisation of the existing heating system based on: Istn — 1 AND operated unit with a power of 80 kW — fired solid fuel with very low heating efficiency — 2 AND operating district heating installation as (operating parameters 90/70 C), characterised by very low efficiency of transmission and use of thermal energy — by applying a new high-efficiency heating system based on renewable energy technology, i.e.: OZE-1 I a cascade of five reverse air-to-water heat pumps with a combined output of 74 kW (operating parameters 55/45 C) with very high thermal energy efficiency of COP = 5.08 I energy efficiency class “A + +” RES -2 I installation of PV panels PV power generation 22 kW (dedicated work to install RES 1 heat pump) and adapting the installation to the new heat source of OE-1 (55/45 C operating parameters) characterised by very high transmission efficiency, regulation and use of heat, Conclusions: W-1 I is a stationary project. (English) / rank
Normal rank
 

Revision as of 19:09, 21 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Closure of the coal furnace — implementation of a new heating system based on heat pumps with a total capacity of 74 KW at the Stargard Street at Okuliki Street 3
Project in Poland financed by DG Regio

    Statements

    0 references
    391,850.0 zloty
    0 references
    94,044.0 Euro
    13 January 2020
    0 references
    461,000.0 zloty
    0 references
    110,640.0 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    14 February 2019
    0 references
    31 December 2019
    0 references
    P.P.H. TESS MAŁGORZATA I SŁAWOMIR MAKSYMOWICZ SP.J.
    0 references
    0 references
    Przewiduje się kompleksową modernizację istniejącego systemu grzewczego opartego na tj.: ISTN - 1 I wyeksploatowanej jednostce kotłowej o mocy 80 kW – opalanej paliwem stałym, charakteryzującej się bardzo niską sprawnością wytwarzania energii cieplnej ISTN - 2 I wyeksploatowanej instalacji centralnego ogrzewania co ( parametry pracy 90/70 C), charakteryzującej się bardzo niską sprawnością przesyłu regulacji i wykorzystania energii cieplnej - poprzez zastosowanie nowego wysokosprawnego systemu ogrzewania opartego na technologii OZE tj.: OZE-1 I kaskadowy układ pięciu rewersyjnych pomp ciepła powietrze-woda o mocy łącznej 74 kW (parametry pracy 55/45 C) charakteryzujący się bardzo wysoką sprawnością wytwarzania energii cieplnej COP = 5.08 I klasa efektywności energetycznej „A++” OZE -2 I instalacji paneli fotowoltaicznych PV o mocy 22 kW (praca dedyk. na potrzeby napędów pomocn. zainstalow. w pompie ciepła OZE-1) charakteryzującej się bardzo wysoką sprawnością pozyskiwania energii elektrycznej OZE -3 I dostosowanie instalacji co - do nowego źródła ciepła OZE-1 (parametry pracy 55/45 C) charakteryzującej się bardzo wysoką sprawnością przesyłu, regulacji i wykorzystania energii cieplnej Wnioski: W-1 I projekt ma charakter stacjonarny. (Polish)
    0 references

    Identifiers

    RPZP.02.09.00-32-A006/17
    0 references