Reconstruction of the masterbatch of Dobre Miastovü- Walkmühle (Q132666): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The project consists of reconstructions of the pre-war alecal (educational path), which is located on plots Nos 3429/2, 3428/3, 3405/1, 3404/1, 3403/3 gm. Dobre Miasto, consisting of two stages: (1) the reconstruction of the pre-war track, in the form of the pavement and the surface of the path over its entire length; (2) adaptation of forestry (from step 1) to an educational path vision by supplementing it with components of a small architect...)
(‎Created claim: summary (P836): The project consists of reconstructing a pre-war walking avenue (during path), located on the plots of Dz. No 3429/2, 3428/3, 3405/1, 3404/1, 3403/3 gm. Good City, consists of two stages: 1) reconstruction of the pre-war path in the form of a pavement and the base of the path over its entire length; 2) adapting the forest avenue (from stage 1) to the vision of the didactic path by supplementing it with elements of small architecture, including s...)
Property / summary
 
The project consists of reconstructing a pre-war walking avenue (during path), located on the plots of Dz. No 3429/2, 3428/3, 3405/1, 3404/1, 3403/3 gm. Good City, consists of two stages: 1) reconstruction of the pre-war path in the form of a pavement and the base of the path over its entire length; 2) adapting the forest avenue (from stage 1) to the vision of the didactic path by supplementing it with elements of small architecture, including stand-alone benches, benches, covered benches, dam, railings, trash bins, freestanding direction indicators, and the gate being the starting point of the path. The path will also be equipped with educational elements, including a forest puzzle, a dendrology lesson, a maze of knowledge, an obverse table, some of which will be adapted to the needs of people with disabilities. The project’s material scope includes: — elaboration of project documentation and geodetic works – preparation of feasibility study – construction works, including the construction of the pavement of the path, together with the hardening of the squares on which elements of small architecture will be located – promotion of the project – supervision in the project The project will be carried out by the windmill, which will be the Beneficiary. All the plots on which the project is located are located in the Forestry area. The project fits into the assumptions set out in the SzOOP RPO WiM for Sub-measure 6.2.3. The efficient use of resources and the objective indicated in the document to preserve and protect the environment and promote resource efficiency. Thanks to the planned measures, the Forestry area will complement infrastructure not only for recreational purposes but also for educational purposes, which will help to shape behaviour towards the environment and forest resources. The project will contribute to increasing the availability of educational and tourist offer in Forestry, which will increase interest in nature conservation. (English)
Property / summary: The project consists of reconstructing a pre-war walking avenue (during path), located on the plots of Dz. No 3429/2, 3428/3, 3405/1, 3404/1, 3403/3 gm. Good City, consists of two stages: 1) reconstruction of the pre-war path in the form of a pavement and the base of the path over its entire length; 2) adapting the forest avenue (from stage 1) to the vision of the didactic path by supplementing it with elements of small architecture, including stand-alone benches, benches, covered benches, dam, railings, trash bins, freestanding direction indicators, and the gate being the starting point of the path. The path will also be equipped with educational elements, including a forest puzzle, a dendrology lesson, a maze of knowledge, an obverse table, some of which will be adapted to the needs of people with disabilities. The project’s material scope includes: — elaboration of project documentation and geodetic works – preparation of feasibility study – construction works, including the construction of the pavement of the path, together with the hardening of the squares on which elements of small architecture will be located – promotion of the project – supervision in the project The project will be carried out by the windmill, which will be the Beneficiary. All the plots on which the project is located are located in the Forestry area. The project fits into the assumptions set out in the SzOOP RPO WiM for Sub-measure 6.2.3. The efficient use of resources and the objective indicated in the document to preserve and protect the environment and promote resource efficiency. Thanks to the planned measures, the Forestry area will complement infrastructure not only for recreational purposes but also for educational purposes, which will help to shape behaviour towards the environment and forest resources. The project will contribute to increasing the availability of educational and tourist offer in Forestry, which will increase interest in nature conservation. (English) / rank
 
Normal rank
Property / summary: The project consists of reconstructing a pre-war walking avenue (during path), located on the plots of Dz. No 3429/2, 3428/3, 3405/1, 3404/1, 3403/3 gm. Good City, consists of two stages: 1) reconstruction of the pre-war path in the form of a pavement and the base of the path over its entire length; 2) adapting the forest avenue (from stage 1) to the vision of the didactic path by supplementing it with elements of small architecture, including stand-alone benches, benches, covered benches, dam, railings, trash bins, freestanding direction indicators, and the gate being the starting point of the path. The path will also be equipped with educational elements, including a forest puzzle, a dendrology lesson, a maze of knowledge, an obverse table, some of which will be adapted to the needs of people with disabilities. The project’s material scope includes: — elaboration of project documentation and geodetic works – preparation of feasibility study – construction works, including the construction of the pavement of the path, together with the hardening of the squares on which elements of small architecture will be located – promotion of the project – supervision in the project The project will be carried out by the windmill, which will be the Beneficiary. All the plots on which the project is located are located in the Forestry area. The project fits into the assumptions set out in the SzOOP RPO WiM for Sub-measure 6.2.3. The efficient use of resources and the objective indicated in the document to preserve and protect the environment and promote resource efficiency. Thanks to the planned measures, the Forestry area will complement infrastructure not only for recreational purposes but also for educational purposes, which will help to shape behaviour towards the environment and forest resources. The project will contribute to increasing the availability of educational and tourist offer in Forestry, which will increase interest in nature conservation. (English) / qualifier
 
point in time: 21 October 2020
Timestamp+2020-10-21T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 18:11, 21 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Reconstruction of the masterbatch of Dobre Miastovü- Walkmühle
Project in Poland financed by DG Regio

    Statements

    0 references
    335,741.51 zloty
    0 references
    80,577.96 Euro
    13 January 2020
    0 references
    419,676.89 zloty
    0 references
    100,722.45 Euro
    13 January 2020
    0 references
    80.0 percent
    0 references
    7 July 2016
    0 references
    31 January 2019
    0 references
    SKARB PAŃSTWA - PAŃSTWOWE GOSPODARSTWO LEŚNE LASY PAŃSTWOWE NADLEŚNICTWO WICHROWO
    0 references
    0 references

    53°59'12.8"N, 20°23'50.3"E
    0 references
    Projekt polega na Rekonstrukcji przedwojennej alei spacerowej (ścieżki dydaktycznej), zlokalizowanej na działkach dz. nr 3429/2, 3428/3, 3405/1, 3404/1, 3403/3 gm. Dobre Miasto, składa się z dwóch etapów: 1) rekonstrukcja ścieżki przedwojennej w postaci wykonania nawierzchni i podłoża ścieżki na całej jej dł.; 2) dostosowanie alei leśnej (z etapu 1) do wizji ścieżki dydaktycznej poprzez uzupełnienie jej w elementy małej architektury, w tym w ławki wolnostojące, ławostoły, ławy zadaszone, zaporę, poręcze, kosze na śmieci, kierunkowskazy wolnostojące, i bramę będącą punktem startowym ścieżki. Ścieżka zostanie wyposażona także w elementy edukacyjne, w tym w leśną łamigłówkę, lekcję dendrologii, labirynt wiedzy, tablicę awers-rewers, z których część dostosowana będzie do potrzeb osób niepełnosprawnych. W zakres rzeczowy projektu wchodzą : - opracowanie dokumentacji projektowej i prac geodezyjnych - opracowanie studium wykonalności - roboty budowlane, w tym budowa nawierzchni ścieżki, wraz z utwardzeniem placów, na których zlokalizowane będą elementy małej architektury - promocja projektu - nadzór w projekcie Przedmiotowy projekt realizowany będzie przez Nadleśnictwo Wichrowo, będące Beneficjentem. Wszystkie działki, na terenie których zlokalizowane jest przedsięwzięcie położone są na terenie Nadleśnictwa. Projekt wpisuje się w założenia określone w SzOOP RPO WiM dla Poddziałania 6.2.3. Efektywne wykorzystanie zasobów oraz realizuje wskazany w dokumencie cel, którym jest zachowanie i ochrona środowiska oraz promowanie efektywnego gospodarowania zasobami. Dzięki zaplanowanym działaniom, na terenie Nadleśnictwa uzupełniona zostanie infrastruktura służąca nie tylko do celów rekreacyjnych, ale także do celów edukacyjnych, co przyczyni się do kształtowania zachowań wobec środowiska i zasobów leśnych. Projekt przyczyni się do zwiększenia dostępności oferty edukacyjnej i turystycznej w Nadleśnictwie, co wpłynie na wzrost zainteresowania istotą ochroną przyrody. (Polish)
    0 references
    The project consists of reconstructing a pre-war walking avenue (during path), located on the plots of Dz. No 3429/2, 3428/3, 3405/1, 3404/1, 3403/3 gm. Good City, consists of two stages: 1) reconstruction of the pre-war path in the form of a pavement and the base of the path over its entire length; 2) adapting the forest avenue (from stage 1) to the vision of the didactic path by supplementing it with elements of small architecture, including stand-alone benches, benches, covered benches, dam, railings, trash bins, freestanding direction indicators, and the gate being the starting point of the path. The path will also be equipped with educational elements, including a forest puzzle, a dendrology lesson, a maze of knowledge, an obverse table, some of which will be adapted to the needs of people with disabilities. The project’s material scope includes: — elaboration of project documentation and geodetic works – preparation of feasibility study – construction works, including the construction of the pavement of the path, together with the hardening of the squares on which elements of small architecture will be located – promotion of the project – supervision in the project The project will be carried out by the windmill, which will be the Beneficiary. All the plots on which the project is located are located in the Forestry area. The project fits into the assumptions set out in the SzOOP RPO WiM for Sub-measure 6.2.3. The efficient use of resources and the objective indicated in the document to preserve and protect the environment and promote resource efficiency. Thanks to the planned measures, the Forestry area will complement infrastructure not only for recreational purposes but also for educational purposes, which will help to shape behaviour towards the environment and forest resources. The project will contribute to increasing the availability of educational and tourist offer in Forestry, which will increase interest in nature conservation. (English)
    21 October 2020
    0 references

    Identifiers

    RPWM.06.02.03-28-0031/17
    0 references