Thermal modernisation of the public building in Wardunki — WTZ Building and ThermoModernisation of the School Complex at Ludomi (Q134827): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The project is a thermo-modernisation of the 2 public buildings (ZS in Ludomi and the Wardunki therapy therapy at Wardunki) in the municipality of Ryworzi, in Wielkopolskie. the scope of the project is 1. Thermal modernisation of public buildings in the Vardunks building — WTORS Building — Total costs — PLN 926 727,28, acid. PLN 923 553,56 and PLN 3 173,72PLN (exclusion of 0.34 % of the area).In the case of the WTZ building, the works include:...) |
(Created claim: summary (P836): The subject of the project is the modernisation of 2 public utility buildings (ZS in Ludomy and the Workshop of Occupational Therapy in Wiardunky) in the commune of Ryczywół, in Wielkopolska voivodship. Thermal modernisation of public buildings in Wiardunky – WTZ building.Total costs -926 727,28 PLN, quaval. 923 553,56 PLN, and nkwal.3 173.72PLN(exclusion of 0.34 % of the area).In the WTZ building in Wiadrunki the works include: polystyrene insu...) |
||||||||||||||
Property / summary | |||||||||||||||
The subject of the project is the modernisation of 2 public utility buildings (ZS in Ludomy and the Workshop of Occupational Therapy in Wiardunky) in the commune of Ryczywół, in Wielkopolska voivodship. Thermal modernisation of public buildings in Wiardunky – WTZ building.Total costs -926 727,28 PLN, quaval. 923 553,56 PLN, and nkwal.3 173.72PLN(exclusion of 0.34 % of the area).In the WTZ building in Wiadrunki the works include: polystyrene insulation, mineral wool warming of external walls, replacement of carpentry for high thermal insulation windows, installation of thermostatic valves at radiators and installation of a condensation boiler for biomass with electric heater support. 2. Thermal modernisation of the ZS building in Ludomach-works covers the following scope: installation of thermostatic valves with radiators, installation of heat pump for heating hot water, insulation of external walls, floors and ceilings, replacement of carpentry for windows and doors with high thermal insulation, mechanical ventilation of the gym and rooms in the basement, replacement of lighting fittings for new energy-saving and meeting the standards of illumination. 1 866 $505.02, and nkwal. 20 813.95PLN(disable 1,1 % of surface area).3. Promotion and information on the project-total cost and quantification of tasks – 2459.58PLN4. Investor supervision – total cost -79 950,00PLN, quaal. — 79 208,62 PLN, nkwal. — 741,38PLNO-encomees are present and future students of the above buildings, in general – residents of Ryczywół commune. The following product indicators will be achieved:-Number of energy-renovated buildings 2 pcsUsed space of buildings undergoing thermal modernisation 2301.7 m²-Number of modernised heat sources 1 units-Number of built heat generation units from RES 2 unitsAdditional capacity to produce heat from renewable sources – 0,0027 MWt (English) | |||||||||||||||
Property / summary: The subject of the project is the modernisation of 2 public utility buildings (ZS in Ludomy and the Workshop of Occupational Therapy in Wiardunky) in the commune of Ryczywół, in Wielkopolska voivodship. Thermal modernisation of public buildings in Wiardunky – WTZ building.Total costs -926 727,28 PLN, quaval. 923 553,56 PLN, and nkwal.3 173.72PLN(exclusion of 0.34 % of the area).In the WTZ building in Wiadrunki the works include: polystyrene insulation, mineral wool warming of external walls, replacement of carpentry for high thermal insulation windows, installation of thermostatic valves at radiators and installation of a condensation boiler for biomass with electric heater support. 2. Thermal modernisation of the ZS building in Ludomach-works covers the following scope: installation of thermostatic valves with radiators, installation of heat pump for heating hot water, insulation of external walls, floors and ceilings, replacement of carpentry for windows and doors with high thermal insulation, mechanical ventilation of the gym and rooms in the basement, replacement of lighting fittings for new energy-saving and meeting the standards of illumination. 1 866 $505.02, and nkwal. 20 813.95PLN(disable 1,1 % of surface area).3. Promotion and information on the project-total cost and quantification of tasks – 2459.58PLN4. Investor supervision – total cost -79 950,00PLN, quaal. — 79 208,62 PLN, nkwal. — 741,38PLNO-encomees are present and future students of the above buildings, in general – residents of Ryczywół commune. The following product indicators will be achieved:-Number of energy-renovated buildings 2 pcsUsed space of buildings undergoing thermal modernisation 2301.7 m²-Number of modernised heat sources 1 units-Number of built heat generation units from RES 2 unitsAdditional capacity to produce heat from renewable sources – 0,0027 MWt (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The subject of the project is the modernisation of 2 public utility buildings (ZS in Ludomy and the Workshop of Occupational Therapy in Wiardunky) in the commune of Ryczywół, in Wielkopolska voivodship. Thermal modernisation of public buildings in Wiardunky – WTZ building.Total costs -926 727,28 PLN, quaval. 923 553,56 PLN, and nkwal.3 173.72PLN(exclusion of 0.34 % of the area).In the WTZ building in Wiadrunki the works include: polystyrene insulation, mineral wool warming of external walls, replacement of carpentry for high thermal insulation windows, installation of thermostatic valves at radiators and installation of a condensation boiler for biomass with electric heater support. 2. Thermal modernisation of the ZS building in Ludomach-works covers the following scope: installation of thermostatic valves with radiators, installation of heat pump for heating hot water, insulation of external walls, floors and ceilings, replacement of carpentry for windows and doors with high thermal insulation, mechanical ventilation of the gym and rooms in the basement, replacement of lighting fittings for new energy-saving and meeting the standards of illumination. 1 866 $505.02, and nkwal. 20 813.95PLN(disable 1,1 % of surface area).3. Promotion and information on the project-total cost and quantification of tasks – 2459.58PLN4. Investor supervision – total cost -79 950,00PLN, quaal. — 79 208,62 PLN, nkwal. — 741,38PLNO-encomees are present and future students of the above buildings, in general – residents of Ryczywół commune. The following product indicators will be achieved:-Number of energy-renovated buildings 2 pcsUsed space of buildings undergoing thermal modernisation 2301.7 m²-Number of modernised heat sources 1 units-Number of built heat generation units from RES 2 unitsAdditional capacity to produce heat from renewable sources – 0,0027 MWt (English) / qualifier | |||||||||||||||
point in time: 21 October 2020
|
Revision as of 18:08, 21 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Thermal modernisation of the public building in Wardunki — WTZ Building and ThermoModernisation of the School Complex at Ludomi |
Project in Poland financed by DG Regio |
Statements
2,440,967.76 zloty
0 references
2,871,726.78 zloty
0 references
85.0 percent
0 references
30 May 2017
0 references
28 December 2017
0 references
GMINA RYCZYWÓŁ
0 references
Przedmiotem projektu jest termomodernizacja 2 budynków użyteczności publicznej (ZS w Ludomach oraz Warsztatu Terapii Zajęciowej w Wiardunkach) w gminie Ryczywół, w województwie wielkopolskim.Zakres projektu zakłada:1. Termomodernizacja budynków użyteczności publicznej w Wiardunkach – budynek WTZ.Koszty całkowite -926 727,28 PLN, kwal. 923 553,56 PLN, a nkwal.3 173,72PLN(wyłączenie 0,34% powierzchni).W budynku WTZ w Wiadrunkach prace obejmują: docieplenie stropodachu styropianem, docieplenie ścian zewnętrznych wełną mineralną, wymiana stolarki na okna o wysokiej izolacyjności termicznej, montaż zaworów termostatycznych przy grzejnikach oraz montaż kotła kondensacyjnego na biomasę wraz ze wspomaganiem grzałką elektryczną. 2. Termomodernizacja budynku ZS w Ludomach-prace obejmują następujący zakres: montaż zaworów termostatycznych przy grzejnikach, montaż pompy ciepła do podgrzewu c.w.u.,docieplenie ścian zewnętrznych, podłóg i stropdachów, wymiana stolarki na okna i drzwi o wysokiej izolacyjności termicznej, wentylacja mechaniczna sali gimnastycznej i pomieszczeń w piwnicy,wymiana opraw oświetleniowych na nowe energooszczędne i spełniające normy natężenia oświetlenia.Koszty całkowite - 1 887 318,97PLN, kwal. 1 866 505,02PLN, a nkwal. 20 813,95PLN(wyłączenie 1,1% powierzchni).3. Promocja i informacja dot. projektu-koszt całkowity i kwal. zadania - 2459,58PLN4. Nadzór inwestorski - koszt całkowity -79 950,00PLN, kwal. - 79 208,62 PLN, nkwal. - 741,38PLNOdbiorcami są obecni i przyszli uczniowie ww. budynków, szerzej - mieszkańcy gminy Ryczywół. W zakresie odbiorców usług WTZ oraz ZS wLudomach.Zostaną osiągnięte następujące wskaźniki produktu:-Liczba zmodernizowanych energetycznie budynków 2 szt-Powierzchnia użytkowa budynków poddanych termomodernizacji 2301,7 m2-Liczba zmodernizowanych źródeł ciepła 1 szt-Liczba wybudowanych jednostek wytwarzania energii cieplnej z OZE 2 szt-Dodatkowa zdolność wytwarzania energii cieplnej ze źródeł odnawialnych - 0,0027 MWt (Polish)
0 references
The subject of the project is the modernisation of 2 public utility buildings (ZS in Ludomy and the Workshop of Occupational Therapy in Wiardunky) in the commune of Ryczywół, in Wielkopolska voivodship. Thermal modernisation of public buildings in Wiardunky – WTZ building.Total costs -926 727,28 PLN, quaval. 923 553,56 PLN, and nkwal.3 173.72PLN(exclusion of 0.34 % of the area).In the WTZ building in Wiadrunki the works include: polystyrene insulation, mineral wool warming of external walls, replacement of carpentry for high thermal insulation windows, installation of thermostatic valves at radiators and installation of a condensation boiler for biomass with electric heater support. 2. Thermal modernisation of the ZS building in Ludomach-works covers the following scope: installation of thermostatic valves with radiators, installation of heat pump for heating hot water, insulation of external walls, floors and ceilings, replacement of carpentry for windows and doors with high thermal insulation, mechanical ventilation of the gym and rooms in the basement, replacement of lighting fittings for new energy-saving and meeting the standards of illumination. 1 866 $505.02, and nkwal. 20 813.95PLN(disable 1,1 % of surface area).3. Promotion and information on the project-total cost and quantification of tasks – 2459.58PLN4. Investor supervision – total cost -79 950,00PLN, quaal. — 79 208,62 PLN, nkwal. — 741,38PLNO-encomees are present and future students of the above buildings, in general – residents of Ryczywół commune. The following product indicators will be achieved:-Number of energy-renovated buildings 2 pcsUsed space of buildings undergoing thermal modernisation 2301.7 m²-Number of modernised heat sources 1 units-Number of built heat generation units from RES 2 unitsAdditional capacity to produce heat from renewable sources – 0,0027 MWt (English)
21 October 2020
0 references
Identifiers
RPWP.03.02.01-30-0123/15
0 references