Improving the safety of the environment of Warmia and Mazury by providing emergency equipment for emergency services (Q132539): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The project involves the purchase of a 1holdcar for rescue and firefighting vehicles with equipment and 8 equipment purchased by the Municipality, the vehicle purchased by the Municipality of the vehicle will be submitted for use by the following transmission system operator (Barlag 28A, 11-033 Olsztyn) and the equipment odpowiednio:urządzenia GPS equipment at 1szt of TSO Bartrout, Olsztynek (ul.Mazursk1,11-015 Olsztynek), Pluski (Pluski 111/4...) |
(Created claim: summary (P836): The object of the project is the purchase of 1 pieces of rescue and firefighting car with equipment and 8 pieces of equipment.The vehicle purchased by the Municipality will be transferred to the OSP Bartąg (Bartąg28A, 11-033 Olsztyn) and equipment respectively: GPS devices of 1pcs of the OSP Bartąg, Olsztynek (Mazurska1,11-015 Olsztynek), Pluski(Pluski 111/45A,11-034 StawigsStawigs) motopomps floating for OSP Pluska, thermal imaging camera for t...) |
||||||||||||||
Property / summary | |||||||||||||||
The object of the project is the purchase of 1 pieces of rescue and firefighting car with equipment and 8 pieces of equipment.The vehicle purchased by the Municipality will be transferred to the OSP Bartąg (Bartąg28A, 11-033 Olsztyn) and equipment respectively: GPS devices of 1pcs of the OSP Bartąg, Olsztynek (Mazurska1,11-015 Olsztynek), Pluski(Pluski 111/45A,11-034 StawigsStawigs) motopomps floating for OSP Pluska, thermal imaging camera for the Gryzlina OSP, LED wrestler with a set of suspensions for the OSP Stawigud. The project’s impact area is warm.-maz., where the above units participate in events affecting the region’s environment.The scope of the project has been analysed for investment needs. As a result of the analysis of variants (October 1 SW), a solution was chosen to protect Warmia and Mazury in an optimal manner against the occurrence and consequences of natural disasters and environmental disasters, which fully fits in with the objectives and type of project (Equipment and strengthening of emergency services)SzOOP RPOWWM, completing:Product indicator: Number of rescue services units equipped with equipment for emergency operations and disaster relief equipment-8 pcs. The project involved the Municipality and OSP units. The Municipality is responsible for:preparing and conducting a tender, signing a contract, technical collection of equipment and settlement with the supplier, promotion, monitoring of project progress, settlement of grants, transfer into the lending of equipment to TSO.The tasks of the TSO units include:promoting the project and carrying out the substantive tasks of the project.Promotion of the project will enable effective disaster to be undertaken by the Municipality, it will be covered with its own resources. (English) | |||||||||||||||
Property / summary: The object of the project is the purchase of 1 pieces of rescue and firefighting car with equipment and 8 pieces of equipment.The vehicle purchased by the Municipality will be transferred to the OSP Bartąg (Bartąg28A, 11-033 Olsztyn) and equipment respectively: GPS devices of 1pcs of the OSP Bartąg, Olsztynek (Mazurska1,11-015 Olsztynek), Pluski(Pluski 111/45A,11-034 StawigsStawigs) motopomps floating for OSP Pluska, thermal imaging camera for the Gryzlina OSP, LED wrestler with a set of suspensions for the OSP Stawigud. The project’s impact area is warm.-maz., where the above units participate in events affecting the region’s environment.The scope of the project has been analysed for investment needs. As a result of the analysis of variants (October 1 SW), a solution was chosen to protect Warmia and Mazury in an optimal manner against the occurrence and consequences of natural disasters and environmental disasters, which fully fits in with the objectives and type of project (Equipment and strengthening of emergency services)SzOOP RPOWWM, completing:Product indicator: Number of rescue services units equipped with equipment for emergency operations and disaster relief equipment-8 pcs. The project involved the Municipality and OSP units. The Municipality is responsible for:preparing and conducting a tender, signing a contract, technical collection of equipment and settlement with the supplier, promotion, monitoring of project progress, settlement of grants, transfer into the lending of equipment to TSO.The tasks of the TSO units include:promoting the project and carrying out the substantive tasks of the project.Promotion of the project will enable effective disaster to be undertaken by the Municipality, it will be covered with its own resources. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The object of the project is the purchase of 1 pieces of rescue and firefighting car with equipment and 8 pieces of equipment.The vehicle purchased by the Municipality will be transferred to the OSP Bartąg (Bartąg28A, 11-033 Olsztyn) and equipment respectively: GPS devices of 1pcs of the OSP Bartąg, Olsztynek (Mazurska1,11-015 Olsztynek), Pluski(Pluski 111/45A,11-034 StawigsStawigs) motopomps floating for OSP Pluska, thermal imaging camera for the Gryzlina OSP, LED wrestler with a set of suspensions for the OSP Stawigud. The project’s impact area is warm.-maz., where the above units participate in events affecting the region’s environment.The scope of the project has been analysed for investment needs. As a result of the analysis of variants (October 1 SW), a solution was chosen to protect Warmia and Mazury in an optimal manner against the occurrence and consequences of natural disasters and environmental disasters, which fully fits in with the objectives and type of project (Equipment and strengthening of emergency services)SzOOP RPOWWM, completing:Product indicator: Number of rescue services units equipped with equipment for emergency operations and disaster relief equipment-8 pcs. The project involved the Municipality and OSP units. The Municipality is responsible for:preparing and conducting a tender, signing a contract, technical collection of equipment and settlement with the supplier, promotion, monitoring of project progress, settlement of grants, transfer into the lending of equipment to TSO.The tasks of the TSO units include:promoting the project and carrying out the substantive tasks of the project.Promotion of the project will enable effective disaster to be undertaken by the Municipality, it will be covered with its own resources. (English) / qualifier | |||||||||||||||
point in time: 21 October 2020
|
Revision as of 17:42, 21 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Improving the safety of the environment of Warmia and Mazury by providing emergency equipment for emergency services |
Project in Poland financed by DG Regio |
Statements
680,000.0 zloty
0 references
800,000.0 zloty
0 references
85.0 percent
0 references
28 April 2016
0 references
16 March 2018
0 references
GMINA STAWIGUDA
0 references
Przedmiotem projektu jest zakup 1szt.samochodu ratowniczo-gaśniczego z wyposażeniem oraz 8 szt. sprzętu.Zakupiony przez Gminę pojazd zostanie przekazany do użytkowania OSP Bartąg (Bartąg28A, 11-033 Olsztyn) a sprzęt odpowiednio:urządzenia GPS po 1szt OSP Bartąg, Olsztynek (ul.Mazurska1,11-015 Olsztynek), Pluski(Pluski 111/45A,11-034 Stawiguda),Stawiguda(Stawiguda273, 11-034 Stawiguda) oraz Gryźliny(Gryźliny,11-034 Stawiguda) a także po 1 szt: motopompy pływającej dla OSP Pluski,kamery termowizyjnej dla OSP Gryźliny, najaśnicy ledowej wraz z kompletem zawiesi dla OSP Stawiguda.Terenem oddziaływania projektu jest teren woj. warm.-maz.,w których powyższe jednostki uczestniczą w zdarzeniach mających negatywny wpływ na środowisko regionu.Zakres projektu został przeanalizowany pod katem występujących potrzeb inwestycyjnych. W wyniku przeprowadzonej analizy wariantów ( Zał.1 SW) wybrano rozwiązanie zabezpieczające w sposób optymalny Warmię i Mazury przed wystąpieniem i skutkami klęsk żywiołowych i katastrof ekologicznych, co w pełni wpisuje się w założenia celu oraz typu projektu(Wyposażenie i wzmocnienie służb ratowniczych)SzOOP RPOWWM,wypełniając:Wskaźnik produktu: Liczba jednostek służb ratowniczych doposażonych w sprzęt do prowadzenia akcji ratowniczych i usuwania skutków katastrof-8 szt. W realizację projektu zaangażowano Gminę i jednostki OSP. Gmina odpowiada za:przygotowanie i przeprowadzenie przetargu,podpisanie umowy,odbiór techniczny sprzętu i rozliczenie z dostawcą,promocję,monitorowanie przebiegu projektu,rozliczenie dotacji,przekazanie w użyczenie sprzętu OSP.Do zadań jednostek OSP należy:promocja projektu i realizacja zadań merytorycznych projektu.Zapewnieniem wkładu własnego zajmie się Gmina,zostanie on pokryty z jej środków własnych.Realizacja projektu zwiększy bezpieczeństwo mieszkańców woj., podniesie zdolności operacyjne jednostek straży pożarnej i pozwoli na podjęcie szybkiej i skutecznej akcji ograniczającej skutki awarii,katastrof i klęsk żywiołowych (Polish)
0 references
The object of the project is the purchase of 1 pieces of rescue and firefighting car with equipment and 8 pieces of equipment.The vehicle purchased by the Municipality will be transferred to the OSP Bartąg (Bartąg28A, 11-033 Olsztyn) and equipment respectively: GPS devices of 1pcs of the OSP Bartąg, Olsztynek (Mazurska1,11-015 Olsztynek), Pluski(Pluski 111/45A,11-034 StawigsStawigs) motopomps floating for OSP Pluska, thermal imaging camera for the Gryzlina OSP, LED wrestler with a set of suspensions for the OSP Stawigud. The project’s impact area is warm.-maz., where the above units participate in events affecting the region’s environment.The scope of the project has been analysed for investment needs. As a result of the analysis of variants (October 1 SW), a solution was chosen to protect Warmia and Mazury in an optimal manner against the occurrence and consequences of natural disasters and environmental disasters, which fully fits in with the objectives and type of project (Equipment and strengthening of emergency services)SzOOP RPOWWM, completing:Product indicator: Number of rescue services units equipped with equipment for emergency operations and disaster relief equipment-8 pcs. The project involved the Municipality and OSP units. The Municipality is responsible for:preparing and conducting a tender, signing a contract, technical collection of equipment and settlement with the supplier, promotion, monitoring of project progress, settlement of grants, transfer into the lending of equipment to TSO.The tasks of the TSO units include:promoting the project and carrying out the substantive tasks of the project.Promotion of the project will enable effective disaster to be undertaken by the Municipality, it will be covered with its own resources. (English)
21 October 2020
0 references
Identifiers
RPWM.05.04.01-28-0017/16
0 references