Deep and comprehensive renovation of the energy building of a residential building Kopernika 9 in Ostróda (Q132334): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Fixing rounding issue) |
(Removed claim: summary (P836): The project consists of a comprehensive energy renovation of a building located at ul. Kopernika 9 in Ostróda on a plot of inventory No 66/19, wheel rim 0 009 m. Ostóda, powiat osródzki. As part of the investment, it is planned to: 1. wall insulation of the building. 263.59 m² by means of a manual removal of thin-layer sheets with a rootstock of thinklascathodes, using styrofoam plates of self-extinguishing variety 15 and a thickness of 15 cm....) |
||
Property / summary | |||
Property / summary: The project consists of a comprehensive energy renovation of a building located at ul. Kopernika 9 in Ostróda on a plot of inventory No 66/19, wheel rim 0 009 m. Ostóda, powiat osródzki. As part of the investment, it is planned to: 1. wall insulation of the building. 263.59 m² by means of a manual removal of thin-layer sheets with a rootstock of thinklascathodes, using styrofoam plates of self-extinguishing variety 15 and a thickness of 15 cm. The building blocks on the front face of the building and on the base and on the front door will be kept in accordance with the recommendation of the Provincial Authority for the Protection of Monuments in Olsztyn — Delegation in Elbląg. 2.insulation of the ceiling on a mineral wool at 18 cm — 144 m², shielded with insulating film and on top of OSB. 3.insulation of the basement of the basement. 131.8 m², from the bottom layer, with a polyurethane foam. 8 cm with a conductivity of 0,024 W/m * K. The project is in line with the assumptions made in the SzocOP Energy efficiency 2014-2020, Action 4.3 Comprehensive energy renovation of buildings, 4.3.2 Energy efficiency in residential buildings. The project involves a comprehensive renovation of the building, which will contribute to “energy efficiency in the SMEs, construction and transport systems in cities leading to emission reductions”. The project will result, inter alia, in a reduction in primary energy consumption in public buildings and heat needs in the construction of a housing unit. the reduction in the energy intensity of the housing building provided for in this project is fully in line with the specific objective of the sub-measure “Increased energy efficiency of residential buildings” and the type of projects to be implemented, under which, inter alia, “insulation of the facility, replacement of windows, external doors and lighting for energy efficient lighting” (English) / rank | |||
Revision as of 17:12, 21 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Deep and comprehensive renovation of the energy building of a residential building Kopernika 9 in Ostróda |
Project in Poland financed by DG Regio |
Statements
91,510.03 zloty
0 references
113,115.0 zloty
0 references
80.9 percent
0 references
9 April 2016
0 references
31 December 2019
0 references
WSPÓLNOTA MIESZKANIOWA KOPERNIKA 9
0 references
Przedmiotem projektu jest kompleksowa modernizacja energetyczna budynku zlokalizowanego przy ul. Kopernika 9 w Ostródzie na działce oznaczonej Nr ewidencyjnym 66/19, obręb 0009 m. Ostróda, powiat ostródzki. W ramach inwestycji planuje się: 1. docieplenie ścian budynku o pow. 263,59 m2 metodą ręczną wyprawy elewacyjnej cienkowarstwowej z podkładem mas tynkarskich silikatowych z użyciem płyt styropianowych samogasnących odmiana 15 i grubość 15 cm. Elementy ceglane na frontowej ścianie budynku oraz cokole i przy drzwiach frontowych zostaną zachowane zgodnie z zaleceniem Wojewódzkiego Urzędu Ochrony Zabytków w Olsztynie - Delegatura w Elblągu. 2.docieplenie stropu na poddaszu wełną mineralną o gr. 18 cm - 144 m2, zabezpieczonego folią izolacyjną i na wierzchu płytą OSB. 3.docieplenie stropu piwnic o pow. 131,8 m2, od spodu warstwą natryskową z piany poliuretanowej ogr. 8 cm o współczynniku przewodzenia 0,024 W/m*K. Projekt wpisuje się w założenia określone w SzOOP Efektywność energetyczna na lata 2014-2020, Działanie 4.3 Kompleksowa modernizacja energetyczna budynków, 4.3.2 Efektywność energetyczna w budynkach mieszkalnych. Projekt zakłada kompleksową termomodernizację budynku, co przyczyni się do „racjonalizacji zużycia energii w sektorze MŚP, budownictwie i systemach transportowych w miastach prowadzącej do redukcji emisji”. W wyniku realizacji projektu osiągnięte zostaną m.in.:Obniżenie zużycia energii pierwotnej w budynkach publicznych i zapotrzebowania na ciepło w zabudowie mieszkaniowej.Spadek emisji gazów cieplarnianych do atmosfery.Zmniejszenie energochłonności budynku mieszkaniowego przewidziane w niniejszym projekcie jest w pełni zgodne z celem szczegółowym tego poddziałania „Zwiększona efektywność energetyczna budynków mieszkalnych” oraz typem projektów przewidzianych do realizacji, zgodnie z którymi przewidziano do realizacji m.in. „ocieplenie obiektu, wymianę okien, drzwi zewnętrznych oraz oświetlenia na energooszczędne” (Polish)
0 references
Identifiers
RPWM.04.03.02-28-0002/18
0 references