Thermal modernisation of public buildings in the Korze municipality (Q132311): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Fixing rounding issue) |
(Removed claim: summary (P836): The purpose of the planned investment will be the renovation of the buildings: Municipal Office (ul. Mickiewicza 13); The Urban Centre for Culture (ul. Freedom, 5A); Mieda-Gminny Public Library (ul. Freedom 16); A Voluntary Fire Brigade (ul. ul. Kościuszki 20); Miasto Stadium ul. The Army of Pols39) and the Gminny Health Centre (ul. Władysława Reymonta 2) Scope of work: — insulation: external walls (No 1, No 2), together with the modernisation...) |
||
Property / summary | |||
Property / summary: The purpose of the planned investment will be the renovation of the buildings: Municipal Office (ul. Mickiewicza 13); The Urban Centre for Culture (ul. Freedom, 5A); Mieda-Gminny Public Library (ul. Freedom 16); A Voluntary Fire Brigade (ul. ul. Kościuszki 20); Miasto Stadium ul. The Army of Pols39) and the Gminny Health Centre (ul. Władysława Reymonta 2) Scope of work: — insulation: external walls (No 1, No 2), together with the modernisation of the cobra, the ceiling and the floor, the floor on the ground, — the insulation of the roof, — the replacement of: window and door frames, — modernisation of c.o: replacement of radiators, thermostatic valves with heads and controls, installation of transmission cables, — modernisation of lighting: replacement of lighting installations for energy efficient LED, — installation of RES installations The works foreseen in the project will improve the energy efficiency of the final energy by at least 25 % with reference to the existing state. The implementation of the project is necessary as the current technical and energy condition of the buildings covered by the project is unsatisfactory. The investment will be implemented in the various stages: the preparation of the STC, the energy audit, the submission of WN, the selection of contractors, the conclusion of the contract with the contractor, the renovation of the building’s energy in the scope of the project, the completion of the project and signature of the final protocol, an ex-post audit, a final statement of the project, the operational phase. The project is part of the assumptions of the SZOOP ROP WM 2014-2020. The project will increase the energy efficiency of public utility buildings. The investment will help to improve the environment by reducing CO2 emissions. Thus, the project will have a positive impact on the environment while promoting economic growth and sustainable development. (English) / rank | |||
Revision as of 17:12, 21 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Thermal modernisation of public buildings in the Korze municipality |
Project in Poland financed by DG Regio |
Statements
4,765,867.77 zloty
0 references
5,957,334.71 zloty
0 references
80.0 percent
0 references
25 June 2018
0 references
31 December 2021
0 references
GMINA KORSZE
0 references
Przedmiotem planowanej inwestycji będzie termomodernizacja budynków: Urzędu Miejskiego (ul. Mickiewicza 13); Miejskiego Ośrodka Kultury (ul. Wolności 5A); Miejsko-Gminnej Biblioteki Publicznej (ul. Wolności 16); Remizy Ochotniczej Straży Pożarnej (ul. Kościuszki 20); Administracyjnym Stadionu Miejskiego (ul. Wojska Polskiego 39) oraz Gminnego Ośrodka Zdrowia (ul. Władysława Reymonta 2) Zakres prac: - docieplenie: ścian zewnętrznych (nr 1, nr 2) wraz z modernizacją cokołów, stropu nad poddaszem i nad piwnicą, posadzki na gruncie, - docieplenie dachu, - wymianę: stolarki okiennej i drzwiowej, - modernizację c.o.: wymiana grzejników, zaworów termostatycznych z głowicami i regulacyjnych, montaż przewodów przesyłowych, - modernizacja oświetlenia: wymiana instalacji oświetleniowej na energooszczędna typu LED, - montaż instalacji OZE Prace przewidziane w ramach projektu skutkować będzie poprawą efektywności energetycznej określonej dla energii końcowej o co najmniej 25% w odniesieniu do stanu istniejącego. Realizacja projektu jest konieczna, gdyż dotychczasowy stan techniczny i energetyczny budynków objętych projektem jest niezadowalający. Inwestycja zostanie wdrożona w poszczególnych etapach: przygotowanie SW, audytu energetycznego, złożenie WND,wybór wykonawców, zawarcie umowy z wykonawcą, modernizacja energetyczna budynku w zakresie objętym projektem, zakończenie projektu i podpisanie protokołu końcowego, audyt ex-post, końcowe rozliczenie projektu, etap eksploatacji. Projekt wpisuje się w założenia SZOOP RPO WiM 2014-2020. Projekt pozwoli na zwiększenie efektywności energetycznej budynków użyteczności publicznej.Zwiększone zostanie lokalne bezpieczeństwo energetyczne poprzez dywersy?kację źródeł oraz dostaw energii. Inwestycja przyczyni się do poprawy stanu środowiska naturalnego poprzez redukcję emisji CO2. Tym samym realizacja projektu będzie miała pozytywny wpływ na środowisko, jednocześnie wspierając wzrost gospodarczy i zrównoważony rozwój. (Polish)
0 references
Identifiers
RPWM.04.03.01-28-0063/18
0 references